PLANNING PERMISSION – ROAD CONDITION REPORT
Planning Application No. 25/60200
Previous Ref. No’s.
Applicant: JES Holdings
Proposed Development: Permission for the demolition of existing structure
ruins and boundary wall and gate entrance at Parnell
Street, the construction of 3no. 3 storey, terraced
apartment buildings consisting of: 3no. 1-bed units at
ground floor level and 3no. 2-bed units at first/second
floor level, connections to existing public services,
revised boundaries and all associated site works
Location: Parnell Street, Drummond Etra,Carrickmacross Co.
Monaghan.
Adjoining Road No. R178.
Site Notice: Yes Date: 22nd May 2025
Engineer’s Report
No Objection Subject to the Following Conditions:
1. Sight distance of 49 metres in both directions to be maintained, to be provided from a
point in the entrance 2.4 metres from the road edge and 1.05 metre above ground level
were the proposed entrance meets the R178 ( Parnell Street ). Sight distances to be
measured to the nearside road edge in both directions.
2. The discharge of surface water from the public road onto the site through road surface
drainage and road subsoil drainage to remain unimpeded.
3. Provision to be made within the site for surface water drainage and no surface water to be
allowed flow onto the public roadway.
4. No development exempt or otherwise shall be erected over the public sewer, drain or
water-main.
5. A suitable contribution cost to be made available for footway and pavement works
outside the red boundary line.
Monaghan County Council
Carrickmacross-Castleblayney
Municipal District
6. All recommendations in accordance with the NRB Traffic & Transport Assessment
Report to be carried out by the Developer / Contractor.
7. The Applicant will be required to put in place a Traffic Management Plan (TMP) for the
duration of the construction works in accordance Chapter 8 of the Department of the
Environment’s Traffic Signs Manual 2010, the contractor shall also implement monitoring
measures to confirm the effectiveness of the mitigation measures outlined in the TMP.
On finalisation of the TMP, the contractor shall adopt the plan and associated monitoring
measures. The final TMP shall address the following issues: -
Site Access & Egress;
Traffic Management Signage;
Routing of Construction Traffic
Timings of Material Deliveries to Site;
Traffic Management Speed Limits;
Road Cleaning;
Road Condition;
Site Access and Egress: - The contractor shall provide advanced warning signs, in
accordance with Chapter 8 of the Department of the Environment’s Traffic Signs Manual
2010, on the approach to proposed site access locations a minimum of one week prior to
construction works commencing at the site.
Programming: - To reduce impacts on residents adjacent to the proposed site and other
road users, the contractor shall : -
Road Cleaning: - the contractor will be required to carry out road sweeping operations
to remove any project related dirt and material deposited on any length of the road
network by construction / delivery vehicles. Road Sweepers will be required to dispose of
material following sweeping of road network, to licensed waste facility.
Vehicle Cleaning: - The contractor will be required to provide wheel washing facilities,
and any other necessary measures to remove mud and organic material from vehicles
exiting site. In addition, the cleaning of delivery trucks such as concrete delivery trucks
shall be carried out within the new site development and not in the existing residential
area.
Road Condition: -The extent of the heavy vehicle traffic movements and the nature of
the works may create problems of such as fugitive losses from wheels, trailers or
tailgates and localised areas of subgrade and wearing surface failure. The contractor
shall ensure that:
8. Before any work is commenced on this development a security, by way of a cash
deposit, in the sum of €2,250.00 is to be paid to the Planning Authority by the developer.
Monaghan County Council
Carrickmacross-Castleblayney
Municipal District
To ensure the satisfactory completion of all surface water drainage/boundary work within
and abutting the site area, to prevent runoff of surface water onto the public roadway and
to ensure that no damage is caused to public roadway and any such damage is repaired
satisfactory.
Signed: _ Glenn O’Reilly _____ DATE: 25/06/2025
Glenn O’Reilly
Assistant Engineer