HomeMy WebLinkAbout2560289 - Site assessment report 1 SOIL CHARACTERISATION REPORT TE REF: 25/395TE LEONE DOOLEY ESSEXFORD INNISKEEN CO. MONAGHAN IN ACCORDANCE WITH EPA CODE OF PRACTICE WASTEWATER TREATMENT AND DISPOSAL SYSTEMS SERVING SINGLE HOUSES 2021 Traynor Environmental Ltd Belturbet Business Park, Creeny, Belturbet Co. Cavan Tel: +353 49 9522236 Fax: +353 49 9522808 Web: www.traynorenvironmental.com RECEIVED: 25/07/2025 2 SITE CHARACTERISATION FORM FOR AN ON-SITE WASTEWATER TREATMENT SYSTEM CONTENTS 1.0 GENERAL DETAILS 2.0 GENERAL DETAILS 3.0 ON SITE ASSESSMENT 3.1 VISUAL ASSESSMENT 3.2 TRIAL HOLE ASSESSMENT 3.3a Subsurface Percolation Test for Subsoil Step 1 Test Hole Preparation Step 2 Pre-Soaking Test Holes Step 3 Measuring T100 Step 4 Standard Method (where T100 ≤ 210min) Step 5 Modified Method (where T100 > 210min) 3.3bSurface Percolation for Soil Step 1 Test Hole Preparation Step 2 Pre-Soaking Test Holes Step 3 Measuring T100 Step 4 Standard Method (where T100 ≤ 210min) Step 5 Modified Method (where T100 > 210min) 4.0 CONCLUSIONS OF SITE CHARACTERISATION 5.0 RECOMMENDATION 6.0 TREATMENT SYSTEM DESIGN DETAILS 7.0 SITE ASSESSORS DETAILS 8.0 PHOTOGRAPHS OF THE SITE 9.0 EPA/FAS CERTIFICATE 10.0 INSURANCE DETAILS. RECEIVED: 25/07/2025 3 1.0 GENERAL DETAILS (From planning application) Name(S) Leone Dooley Address of Correspondance Site Location and Townland CMD Architects Thornford Lodge, Broomfield, Castleblayney, Co. Monaghan Inniskeen Co. Monaghan Number of Bedrooms 4 Maximum Number of Residents: 6 Comments on population equivalent 6PE is the maximum capacity of the dwelling Proposed Water Supply: Mains: Private Well/Borehole Group Well/Borehole 2.0 GENERAL DETAILS (From planning application) Soil Type, (Specify Type): Soil Association 29 Acid brown Earths (75%), Interdrumlin Peat & Peaty Gleys (25%) Subsoil, (Specify Type): Peat Bedrock Type: Late Ordovician-Silurian deep marine greywacke, mudstone (Longford-Down) Aquifer Category: Regionally Important Locally Important Poor  Vulnerability: Extreme High Moderate Low Groundwater Body: IEGBNI_NB_G_019 Status Not at Risk Name of Public/Group Scheme Water Supply within 1km: Unknown Source Protection Area: ZOC n/a SI n/a SO n/a Groundwater Protection Response: R21 Presence of Significant sites (Archaeological, natural and historical): None evident within the locality Past experience in the area: Variable percolation characteristics of the topsoil and subsoil materials. R21 = Acceptable subject to normal good practice. Site may be suitable for discharge to ground, if the minimum depths are met on the site and if there exists suitable percolation. As the soil type in the area is Acid Brown Earths (75% of the land area), and as the area is mapped as ‘Extreme’ Vulnerability. Groundwater as a resource will be at risk if the minimum depths required are not achieved on the site, or if the percolation rate is too rapid. Older wells in the area may also be at risk, if the minimum separation distances are not adhered to. Groundwater and wells are therefore the main targets, following the desk study. Given the response and the aquifer type, the site is potentially suitable for a conventional septic tank system if the minimum depths required are met on the site, if the minimum separation distances can be met, and if the percolation rate is adequate. ____________________________________________________________________________________ 1This figure of 6 people refers to the potential 6 people maximum that will stay at the proposed dwelling at any one time. RECEIVED: 25/07/2025 4 3.0 ON-SITE ASSESSMENT 3.1 Visual Assessment Landscape Position Relatively Flat Slope Steep <1:5 Shallow 1.5 to 1.20 Relatively Flat  Slope Comment Sloping in Northeast direction Surface features within a minimum of 250 metres (Distances to features should be noted in metres) Houses Neighbouring house located 200m to the east of the ppa. Existing Land Uses Agricultural Grassland Vegetation Indicators Grass is the predominant vegetation in the ppa Groundwater Flow Directions Northeast Direction Ground Condition Ground conditions are best described as firm in the ppa . Site Boundaries Lane and hedge are located to the North and West of the ppa. Roads Local road located >240m east from the ppa. Outcrops (Bedrock and/or subsoil) None Identified or Evident within the locality. Surface water ponding No surface water ponding was evident in the ppa when examined on 05.06.25. It must be noted that weather conditions prior to the site assessment taking place was generally dry & firm conditions. Lakes None occur within 50m of the ppa. Beaches/Shellfish Areas None occur within 200m of the ppa. Wetlands None occur within 200m of the ppa. Karst Features None occur within 200m of the ppa. Watercourses/Streams None occur within 10m of the ppa. Drainage Ditches None occur within 10m of the ppa. Springs None occur within 50m from the ppa. RECEIVED: 25/07/2025 5 Wells Existing water supply taken from mains water. As all the wells in the locality will therefore meet the required separation distances of the Groundwater Protection Responses of GSI/EPA/DoELG and the EPA Code of Practice (2021), none are deemed to be at risk from the proposed polishing filter’s installation. Integrate the information above in order to comment on: 1. The potential suitability of the site: The site still seems suitable for discharge to ground. 2. Potential targets at risk: Following the desk study surface water was thought not to be at risk; this was corroborated during the visual assessment. There appears to be few issues with respect to impermeability. From this, surface water does not seem to be a potential target, Groundwater is still a target following the visual assessment, unless the minimum depths required are met on the site and there exists adequate percolation. 3. The suitability of the site to treat the wastewater: Following the visual assessment it is seen that all appropriate separation distances can be met and the site seems well drained, and pending confirmation of the presence of adequate depths of unsaturated soil and subsoil within the percolation area, as well as sufficient percolation rates under the site, the site should be suitable for treating wastewater adequately. RECEIVED: 25/07/2025 6 Sketch of site showing measurement to Trial Hole location and Percolation test Hole locations, wells and direction of ground water flow, proposed house (incl. distances from boundaries) adjacent houses, watercourses, significant sites and other features. N orth point should always be included. SITE LAYOUT DRAWING SHOWING TEST HOLE LOCATIONS Approximate Location of Trial Hole & Percolation Test Holes Examined on 05.06.25 .19 Groundwater Flow Direction RECEIVED: 25/07/2025 7 3.2 Trial Hole Should be a minimum 2.10m deep Depth of Trial Hole 2.10m BGL Depth from Ground Surface to bedrock (m) if Present None Encountered Depth from Ground Surface to Water Table (m) if Present 0.80m Depth of water ingress 0.70m Rock Type if Present None Encountered Date and Time of Excavation 03.06.25 08.30 Date and Time of Examination 05.06.25 09.30 Depth of Subsurface & Surface Soil/Subsoil Texture Classification Plasticity and Dilatancy Soil Structure Density Compactness Colour Preferential Flowpaths 0.1m Depth of Silt/Clay Ribbons Blocky Medium Brown 0.2m Surface Imported soil 40.50.50 0.3m Test 3,3,3Threads 0.4m 0.5m Depth of Clay intermixed Ribbons Blocky Medium/High Brown 0.6m Subsurface With stone 90.90.100 0.7m Test Imported soil 3,4,4Threads 0.8m WWT WWT WWT WWT WWT WWT 0.9m GWT GWT GWT GWT GWT GWT 1.0m 1.1m 1.2m 1.3m 1.4m 1.5m 1.6m 1.7m 1.8m 1.9m 2.0m 2.1m 2.2m EVALUATION: Weather conditions: Mild According To The Flowchart For Describing Subsoil’s based on BS5930:1999, the subsoil is best described as Clay intermixed with stone Groundwater was encountered in the trail hole at 0.80m. Winter Groundwater was encountered in the trial hole at 0.7m. Bedrock was not encountered in the trial hole. Likely Subsurface Percolation Value: <75.00 min /25mm *Note: Depth of percolation test holes should be indicated on log above (Enter Subsurface & Surface Depths as appropriate) * See Appendix E for BS5930 Classification ** 3 samples to be tested *** All signs of mottling should be recorded. Likely Surface Percolation Value: <75.00 min /25mm RECEIVED: 25/07/2025 8 3.3a Subsurface Percolation Test for Subsoil Step 1 Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface to top of hole (mm) (A): 150 150 150 Depth from ground surface to base of hole (mm) (B): 550 550 550 Depth of hole (mm) (B-A): 400 400 400 Dimensions of hole [length x breadth (mm)]: 300 x 300 300 x 300 300 x 300 Step 2 Pre-Soaking Test Holes Pre-soak start Date 04.06.25 04.06.25 04.06.25 Time 10.00 10.00 10.00 2nd pre-soak start Date 04.06.25 04.06.25 04.06.25 Time 16.00 16.00 16.00 Each hole should be pre-soaked twice before the test is carried out. Each hole should be empty before refilling. Step 3 Measuring T100 Percolation Test Hole 1 2 3 Date of Test 05.06.25 05.06.25 05.06.25 Time Filled to 400mm 09.30 09.30 10.00 Time Water Level at 300mm 13.02 13.07 13.13 Time to drop 100mm (T100) 212.00 217.00 223.00 Average T100 217.30 If T100 >480mins then Subsurface Percolation value >120 – site unsuitable for discharge to ground If T100 ≤ 210mins then go to Step 4 If T100 ≥ 210mins then go to Step 5 RECEIVED: 25/07/2025 9 Step 5 Modified Method (where T100 > 210min) Percolation Test Hole No 1 Fall of Water In Hole (mm) Time Factor = Tf Start Time hh:mm Finish Time hh:mm Time of fall (mins) =Tm Kfs = Tf/Tm T –value = 4.45/Kfs 300 – 250 8.1 13.03 15.42 159.00 0.05 87.35 250 – 200 9.7 15.43 18.29 166.00 0.06 76.15 200 – 150 11.9 18.30 21.23 173.00 0.07 64.69 150 - 100 14.1 21.24 00.24 180.00 0.08 56.81 Average T-Value T-Value Hole 1 = (T1) 71.25 Percolation Test Hole No 2 Fall of Water In Hole (mm) Time Factor = Tf Start Time hh:mm Finish Time hh:mm Time of fall (mins) =Tm Kfs = Tf/Tm T –value = 4.45/Kfs 300 – 250 8.1 13.08 15.52 164.00 0.05 90.10 250 – 200 9.7 15.53 18.42 169.00 0.06 77.53 200 – 150 11.9 18.43 21.39 176.00 0.07 65.82 150 - 100 14.1 21.40 00.41 181.00 0.08 57.12 Average T-Value T-Value Hole 2 = (T2) 72.64 Percolation Test Hole No 3 Fall of Water In Hole (mm) Time Factor = Tf Start Time hh:mm Finish Time hh:mm Time of fall (mins) =Tm Kfs = Tf/Tm T –value = 4.45/Kfs 300 – 250 8.1 13.14 16.00 166.00 0.05 91.20 250 – 200 9.7 16.01 18.55 174.00 0.06 79.82 200 – 150 11.9 18.56 21.57 181.00 0.07 67.68 150 - 100 14.1 21.58 01.06 188.00 0.08 59.33 Average T-Value T-Value Hole 3 = (T3) 74.51 Result of Test: Subsurface Percolation Value = 72.80min/25mm. Comments Average Percolation Characteristics of the Subsoil Material. RECEIVED: 25/07/2025 10 3.3bSurface Percolation for Soil Step 1 Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface to top of hole (mm) (A): 0 0 0 Depth from ground surface to base of hole (mm) (B): 400 400 400 Depth of hole (mm) (B-A): 400 400 400 Dimensions of hole [length x breadth (mm)]: 300 x 300 300 x 300 300 x 300 Step 2 Pre-Soaking Test Holes Pre-soak start Date 04.06.25 04.06.25 04.06.25 Time 10.00 10.00 10.00 2nd pre-soak start Date 04.06.25 04.06.25 04.06.25 Time 16.00 16.00 16.00 Each hole should be pre-soaked twice before the test is carried out. Each hole should be empty before refilling. Step 3 Measuring T100 Percolation Test Hole 1 2 3 Date of Test 05.06.25 05.06.25 05.06.25 Time Filled to 400mm 09.30 09.30 09.30 Time Water Level at 300mm 199.00 206.00 214.00 Time to drop 100mm (T100) 12.49 12.56 13.04 Average T100 206.30 If T100 >480 minutes then Surface Percolation value >90 – site unsuitable for discharge to ground If T100 ≤ 210mins then go to Step 4 If T100 ≥ 210mins then go to Step 5 RECEIVED: 25/07/2025 11 Step 4 Standard Method (where T100 ≤ 210min) Percolation Test Hole 1 2 3 Fill No. Start Time at 300mm Finish Time at 200mm ∆t (min) Start Time at 300mm Finish Time at 200mm ∆t (min) Start Time at 300mm Finish Time at 200mm ∆t (min) 1 12.50 16.13 203.00 12.57 16.26 209.00 13.05 16.44 219.00 2 16.14 19.40 206.00 16.27 20.01 214.00 16.45 20.31 226.00 3 19.41 23.11 210.00 20.02 23.41 219.00 20.32 00.23 231.00 Average ∆t 206.30 214.00 225.30 Average ∆t/4 = [Hole No. 1] 51.58 Average ∆t/4 = [Hole No. 2] 53.5 Average ∆t/4 = [Hole No. 2] 56.30 Result of Test : Surface Percolation Value 53.79 min/25mm Comments Result of Test: surface Percolation Value = 53.79min/25mm Comments Good Percolation Characteristics of the Subsoil Material. RECEIVED: 25/07/2025 12 4.0 CONCLUSIONS of SITE CHARACTERISATION: Integrate the information from the desk study and on -site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Slope of Proposed Infiltration/treatment area 1.200 Are all minimum separation distance met? Yes Depth of unsaturated soil and/or subsoil beneath invert of gravel (or drip tubing in the case of drip dispersal system) 0.90m Percolation test results: Surface: 53.79min/25mm Sub-surface: 70.82min/25mm Not suitable for Development Suitable for Development  Identify all suitable options Discharge Route 1. Septic tank System (Septic tank and percolation area) (Chapter 7) Groundwater 2. Secondary Treatment System (Chapters 8 and 9) and soil polishing filter (Section 10.1)  3. Tertiary Treatment System and Infiltration/treatment area (Section 10.2)  5.0 RECOMMENDATION: Propose to install Traynor Environmental recommends an O’ Reilly Oakstown EN Treatment system or similar EN Certified System, Ecoflo Coco Filter and Gravel Distribution Bed is constructed in accordance with EPA guidelines 2021. And discharge to Groundwater Invert level of the trench/bed gravel or drip tubing (m) 0.90m Below Ground Level (BGL) Site Specific Conditions (if any) e.g. special works, Site Improvement Works, Testing etc. The tests showed that the site has a Sub -surface value rating of 70.82min/25mm indicating average percolation characteristics of the Sub-surface. A surface value rating of 53.79min/25mm was attained indicating average percolation characteristics of the surface. Groundwater was encountered in the ground hole at 0.30m. Winter Groundwater was not encountered in the trial hole. Bedrock was not encountered in the trial hole. A Ecoflo Co Co Filter should be constructed to ensure that there is a minimum of 0.90m of suitable percolating material between the base of the lowest part of the Gravel Distribution Bed and Groundwater at all times. The Ecoflo Co Co Filter will be bedded on 300mm depth of crushed stone (20-30mm in sizes). Traynor Environmental Ltd also recommends that the O’Reilly Oakstown Treatment System or similar manufactured EN certified system, Ecoflo Coco Filter & Gravel Distribution Bed. construction is overseen by a suitable qualified and accredited person. RECEIVED: 25/07/2025 13 6.0 TREATMENT SYSTEM DETAILS SYSTEM TYPE: Septic Tank System (Chapter 7) Tank Capacity (m2) N/A Percolation Area Mound Percolation Area No. of Trenches N/A No. of Trenches N/A Length of Trenches (m) N/A Length of Trenches (m) N/A Invert Level (m) N/A Invert Level (m) N/A SYSTEM TYPE: Secondary Treatment System (Chapters 8 and 9) and polishing filter (Section 10.1) Secondary Treatment Systems receiving septic tank effluent (Chapter 8) Package Treatment Systems Media Type Area (m2) Deep of Filter (m) Invert Level (m) receiving raw wastewater (Chapter 9) Sand/Soil N/A N/A N/A Type O’ Reilly Oakstown Treatment System Soil N/A N/A N/A Capacity PE 8 Constructed Wetland N/A N/A N/A Sizing of Primary Compartment Other N/A N/A N/A 4 m2 Polishing Filter: (Section 10.1) Surface Area Sand Filter (m2) Ecoflo Coco Filter No. of Trenches N/A Option 1 – Direct Discharge Surface area (m2) 150 Length of Trenches (m) N/A Option 2 – Pumped Discharge Surface Area (m2) N/A Invert Level (m) 0.90m BGL SYSTEM TYPE: O’Reilly Oakstown Treatment System and infiltration/ treatment area (section 10.2) Identify purpose of tertiary treatment Provide performance information demonstrating system will provide required treatment levels Provide design information O’Reilly Oakstown Treatment System, Ecoflo Coco Filter & Gravel Distribution Bed DISCHARGE ROUTE: Groundwater  Hydraulic Loading Rate (l/m2. d) 900 Surface Area (m2) Surface Water Discharge Rate (m3/hr) 0.010 QUALITY ASSURANCE: Installation & Commissioning On-going Maintenance Recommend to be overseen by plant supplier. Maintain and de-sludge annually RECEIVED: 25/07/2025 14 7.0 SITE ASSESSOR DETAILS Company: Traynor Environmental Ltd Prefix: Mr. First Name: Nevin Surname: Traynor Address: Belturbet Business Park, Creeny, Belturbet, Co. Cavan. Qualifications/Experience: BSc. Env, H.Dip I.T, Cert SHWW, EPA/FAS Course Certified Professional Indemnity Insurance Holder (€1 million cover) Date of Report: 21.07.25 Phone: 049 9522236 Fax: 049 9522808 E-mail: nevin@traynorenvironmental.com Indemnity Insurance Number: 23/1/01555 (Renewed 12th July 2024) Signed: Nevin Traynor BSc. Env, H.Dip I.T, Cert SHWW, EPA/FAS Cert. For Traynor Environmental Ltd RECEIVED: 25/07/2025 15 Figure – Ecoflo Co co Filter Detail RECEIVED: 25/07/2025 16 Photograph – Example of Ecoflo Co co Filter Under Construction RECEIVED: 25/07/2025 17 8.0 SITE PHOTOGRAPHS Facing North From the Trial Hole Excavation Facing South From the Trial Hole Excavation Facing West From the Trial Hole Excavation Facing East From the Trial Hole Excavation Trial Hole – Side View Trial Hole – Side View RECEIVED: 25/07/2025 18 Percolation (“Sub-Surface”) Test 1 Percolation (“Sub-Surface”) Test 2 Percolation (“Sub-Surface”) Test 3 Percolation (“Surface”) Test 1 Percolation (“Surface”) Test 2 Percolation (“Surface”) Test 3 RECEIVED: 25/07/2025 19 Maps Used As Part of the EPA Site Suitability Assessment Groundwater/Aquifer Map From the GSI Groundwater Aquifer Map Site is classified as PI- Poor Aquifer - Bedrock which is Generally Unproductive except for Local Zones Vulnerability Map From the GSI Vulnerability Map Site is classified as Extreme RECEIVED: 25/07/2025 20 Bedrock Map From the GSI Bedrock Map Site is classified as Late Ordovician-Silurian deep marine greywacke, mudstone (Longford-Down) Teagasc Subsoil Map From the Teagasc Subsoil Map Site is classified as Peat RECEIVED: 25/07/2025 21 9.0 EPA/FAS CERTIFICATE RECEIVED: 25/07/2025 22 10.0 P.I INSURANCE RECEIVED: 25/07/2025 23 PROPOSAL FOR A O’REILLY OAKSTOWN TREATMENT SYSTEM PREPARED FOR LEONE DOOLEY RECEIVED: 25/07/2025 TRAYNOR ENVIRONMENTAL LTD EPA SEWAGE LOADING SIZING CHART - LEONE DOOLEY Situation Source Litres/day BOD5 g/d PE Organic Number of Population Hydraulic Organic Pupulation Person Person Loading Persons (Organic)Loading (Lit)Loading (gr)(Hydraulic) Domestic Normal Resident 150 60 1.00 6 6 900 360 6.00 Industrial Office and/or factory without canteen 30 20 0.33 0 0 0 0.00 Office and/or factory with canteen 60.0 30.0 0.5 0 0 0 0.00 Open Industrial Site e.g. Quarry 40.0 25.0 0.4 0 0 0 0.00 School Non- residential with cooking on-site Students 60.0 30.0 0.5 0 0 0 0.00 6hr Shock Non-residential with no-cooking on site 35 20 0.33 0 0 0 0.00 Football clubs Players incl. showers 30 20 0.33 0 0 0 0.00 Spectators - Toilet blocks 8 10 0.17 0 0 0 0.00 Amenity Sites Restuarants 15 15 0.25 0 0 0 0.00 Function rooms 10 10 0.17 0 0 0 0.00 Toilet blocks (per use)8 10 0.17 0 0 0 0.00 Toilet blocks (long stay car parks)10 15 0.25 0 0 0 0.00 Golf clubs 25 15 0.25 0 0 0 0.00 Squash, with club house 25 15 0.25 0 0 0 0.00 Swimming 10 10 0.17 0 0 0 0.00 6 900 360 6.00 Loadings Population Org 6.00PE Hydraulically 6.00PE Treatment System Proposed: O’ Reilly Oakstown EN Treatment system or similar EN Certified System and Ecoflo Coco Filter and Gravel Distribution BedRECEIVED: 25/07/2025 Date: 21ST July 2025 Applicant Name: Leone Dooley Site Address: Innsikeen, Co. Monaghan Design Capacity: Maximum number of residents: 06 No. of single bedrooms: 00 No. of double bedrooms: 04 A representative of O’Reilly Oakstown Ltd has assessed the Soil Test Report and confirms the suitability of their Oakstown BAF 8PE Wastewater Treatment System to treat effluent being discharged from the above proposed dwelling based on the residential demands submitted to us above. 1. Waste Water Treatment System Design Details: - Maximum Daily Design Loadings as per client Max No. of users Flow Litres/day/person Total Hydraulic Load B0D5 (grams/day/person) Total Organic Loading (grams/day) 6 150 900 litres 60 360 Total Organic Loading 0.36kg BOD/day Total Hydraulic loading 0.90m³ /day - Average treated effluent standard - see performance results on EN-12566-3 certification attached BOD 8mg/litre TSS 12mg/litre Ammonia 13mg/litre - Proposed system details: ► Oakstown BAF 8 P.E. Volume of Total Plant 8m³ Volume of Primary Sedimentation Chambers 4m³ Volume of Secondary Aeration Chamber 2m³ Volume of Biomedia 1.0m³ RECEIVED: 25/07/2025 2. Wastewater Treatment system description: The Oakstown BAF 8 PE is designed to provide proven, cost effective primary and secondary wastewater treatment in robust steel reinforced concrete tanks. The primary sedimentation chamber has substantial capacity (4m³) to allow anaerobic digestion to occur naturally while letting sludge settle on the tank floor. Once primary treatment has taken place the effluent is further degraded in the aeration chamber where oxygen enriched wastewater provides ideal conditions for aerobic bacteria to thrive. Before pumping to the percolation area the clear water is left to further settle in the clarifier chamber to eliminate any remaining settle able solids. 3. Guarantee and warrantees: O’Reilly Oakstown provide a 12 month maintenance service contract on all systems from date of first occupation. We provide a 24 month warranty on all parts. 4. Percolation: The percolation area designed must conform to the requirements of Table 10.1 of EPA Code of Practice 2021 Wastewater Treatment and Disposal System serving single houses. The percolation area requirements are as follows: Sub Surface value 70.82min/25mm as per Site Characterisation Form. Surface value: 53.79min/25mm as per Site Characterisation Form. Depth from ground surface to water table: 0.8BGL Depth from ground surface to winter groundwater level: 0.7BGL Depth from ground surface to bed rock: None Encountered Percolation Area: As per Traynor Env Report ►See Site Characterisation report for percolation area details . RECEIVED: 25/07/2025 5. Client Responsibilities unless included in our quotation: • Excavation and backfill. • Construction of the percolation / polishing filter as recommended by the site engineer on the Site Characterisation report and/or drawing. • Provision of access for delivery by hi-ab truck to within 3 metres of the excavation. • Provision of a power ducting from the tanks to the house/garage. • Mounting and connection of control panel to mains power in the house/garage. 6. Operation and Maintenance: The client is responsible for the operation and maintenance of the wastewater treatment system in accordance with the owner’s manual supplied by O’Reilly Oakstown. Please do not hesitate to contact us if there are any further queries. Yours sincerely, RECEIVED: 25/07/2025 RECEIVED: 25/07/2025 RECEIVED: 25/07/2025 RECEIVED: 25/07/2025 RECEIVED: 25/07/2025 A final treatment stage to further improve the effluent quality before it is discharged safely to the receiving environment. Highest Performing A reliable wastewater treatment system well adapted to all site conditions. Proven performances surpassing the strictest standards. Sustainable A permanent and ecological solution – no energy needed for the treatment. Pre-assembled, easy-to-handle units to ensure quality installations and less surplus material transported to sites. Compact Minimal final footprint – ideal when the available area for the installation is limited or if separation distances must be reduced. Low-Cost Delivered ready to be installed to minimize civil works and eliminate construction on site. No excavation or relocation at the end of the life cycle of the filtering media (up to 15 years). Waste Watertreatment Complies with the ePa Code of Practice 2009 tertiary treatment Filter Domestic and commercial applications RECEIVED: 25/07/2025 Quartertown Industrial Estate, Mallow, Co Cork, IRELAND 022 51411 | ptairl-sales@premiertech.com | PREMIERTECHAQUA.IE 1 3 2 4 PRotEC t youR PRoPERty, youR ENvIRoNMENt & youR INvEstMENt. tHE BEst CHoICE MADE sIMPLE tyPICAL INstALLAtIoNs Ecoflo Coco Filter offers all the benefits of a truly proven and reliable tertiary treatment system. Designed for both principal and secondary residences as well as for new housing constructions and faulty system replacement projects. Also recommended for commercial projects. • Send us a copy of your EPA Site Suitability Assessment and we will produce a design for you. • If you don’t have a copy, send us your planning number and we’ll look it up for you on your local authority website. • Send us the name of your engineer and we will liaise with them for you. • We supply either a full kit of a Wastewater Treatment or only the Ecoflo Coco Filter – Tertiary Treatment Filter along with 15 m of interconnecting pipework and fittings. • We will liaise with your grounds contractor to ensure proper installation. • We provide a commissioning certificate for the system for full compliance with your planning. secondary treatment system Treats domestic wastewater as per local regulations. ecoflo Coco Filter Provides a final treatment stage to further improve the effluent quality before it is discharged to the receiving environment. Spreads out the influent over the surface of the filtering media thanks to a patented distribution system comprised of a feed ramp, a tipping bucket and distribution plates. Filtering media The coco fragment-based filtering media is where the water is organically further treated and filtered and where pollutants are retained and degraded. Final Discharge The treated wastewater is discharged directly to a gravel distribution bed installed below it. Pumping Station 1 1 2 2 2 4 4 3 RECEIVED: 25/07/2025