PLANNING PERMISSION – ROAD CONDITION REPORT
Planning Application No. 25/47
Previous Ref. No’s.
Applicant: GEC Development and Construction Ltd.
Proposed Development: Permission for the development will consist of: the
construction a new residential development
comprising 9 no. age friendly single storey dwelling
houses that includes a terrace of 7 no. dwelling
houses - (5 no. 2 bedroomed houses and 2 no. 3
bedroomed houses) and 2 no. 2 bedroomed
semidetached houses and all ancillary and associated
site development works including site clearance
works, new vehicular and pedestrian access off the
N53 Dundalk Road, car parking spaces, communal
open space area, hard and soft landscaping and
boundary treatment works.
Location: Connabury, Castleblayney, Co. Monaghan
Adjoining Road No. N53
Site Notice: Yes Date: 16th June 2025
Engineer’s Report
No Objection Subject to the Following Conditions:
1. Sight distance of 49 metres in both directions to be maintained, to be provided from a
point in the entrance 2.4 metres from the road edge and 1.05 metre above ground level
were the existing entrance meets the N53. Sight distances to be measured to the nearside
road edge in both directions. Where it is necessary remove hedges/trees in order to
achieve this sight distance.
2. The discharge of surface water from the public road onto the site through road surface
drainage and road subsoil drainage to remain unimpeded.
Monaghan County Council
Carrickmacross-Castleblayney
Municipal District
3. Provision to be made within the site for surface water drainage and no surface water to be
allowed flow onto the public roadway.
4. The Applicant must submit a Stage 1 & 2 Road Safety Audit for access of vehicles and
pedestrian to and from the proposed development to the N53.
5. No development exempt or otherwise shall be erected over the public sewer, drain or
water-main.
6. The Applicant will be required to put in place a Traffic Management Plan (TMP) for the
duration of the construction works in accordance Chapter 8 of the Department of the
Environment’s Traffic Signs Manual 2010, the contractor shall also implement monitoring
measures to confirm the effectiveness of the mitigation measures outlined in the TMP.
On finalisation of the TMP, the contractor shall adopt the plan and associated monitoring
measures. The final TMP shall address the following issues: -
Site Access & Egress;
Traffic Management Signage;
Routing of Construction Traffic
Timings of Material Deliveries to Site;
Traffic Management Speed Limits;
Road Cleaning;
Road Condition;
Site Access and Egress: - The contractor shall provide advanced warning signs, in
accordance with Chapter 8 of the Department of the Environment’s Traffic Signs Manual
2010, on the approach to proposed site access locations a minimum of one week prior to
construction works commencing at the site.
Programming: - To reduce impacts on residents adjacent to the proposed site and other
road users, the contractor shall : -
Road Cleaning: - the contractor will be required to carry out road sweeping operations
to remove any project related dirt and material deposited on any length of the road
network by construction / delivery vehicles. Road Sweepers will be required to dispose of
material following sweeping of road network, to licensed waste facility.
Vehicle Cleaning: - The contractor will be required to provide wheel washing facilities,
and any other necessary measures to remove mud and organic material from vehicles
exiting site. In addition, the cleaning of delivery trucks such as concrete delivery trucks
shall be carried out within the new site development and not in the existing residential
area.
Monaghan County Council
Carrickmacross-Castleblayney
Municipal District
Road Condition: -The extent of the heavy vehicle traffic movements and the nature of
the works may create problems of such as fugitive losses from wheels, trailers or
tailgates and localised areas of subgrade and wearing surface failure. The contractor
shall ensure that:
Loads of materials leaving each site will be evaluated and covered if considered
necessary to minimise potential dust impacts during transportation and the transportation
contractor shall take all reasonable measures while transporting waste or any other
materials likely to cause fugitive loses from a vehicle during transportation to and from
site, including but not limited to: Covering of all waste or material with suitably secured
tarpaulin/ covers to prevent loss and Utilisation of enclosed units to prevent loss. On
completion of construction works, all surface water drains shall be thoroughly cleansed
to ensure that no construction material enters the public surface water drainage system.
7. Before any work is commenced on this development a security, by way of a cash
deposit, in the sum of €2,250.00 is to be paid to the Planning Authority by the developer.
To ensure the satisfactory completion of all surface water drainage/boundary work within
and abutting the site area, to prevent runoff of surface water onto the public roadway and
to ensure that no damage is caused to public roadway and any such damage is repaired
satisfactory.
Signed: _ Glenn O’Reilly _____ DATE: 31/07/2025
Glenn O’Reilly
Assistant Engineer
Carrickmacross/ Castleblayney Municipal District.