Loading...
HomeMy WebLinkAbout2560371 - Site layout plan83.91583.88183.84283.82283.88083.95884.18484.126SCSCLPLPLPLPSWireSWireRSRSRSRSRSTPTPTPTPWMWMEPEPC/BoxTree Stump82.9282.9682.2782.2282.1982.3882.2582.5581.7082.1382.2382.49=Water Level82.61=Water LevelS150ØS150ØDPDPDPDPDPEave Ht=89.89Eave Ht=88.72Eave Ht=86.61Ridge Ht=95.36Ridge Ht=90.39Ridge Ht=88.07GG83.9384.03FL83.87FL83.89FL83.86FL83.81FL85.841st FL83.51FLProject:CURTILAGE WORKSClient:Committee Of First Ballybay Pres.Church, Derryvally, Ballybay, Co. MNLocation:Derryvally, Ballybay, Co. MonaghanDrawing Title:SITE DRAWINGDrawing No:624 23 01Issued:14th March '24Scale:1:200 @ A1CORLEA, BALLYBAY, CO. MONAGHAN info@moffettarchitectural.ie T: 042 97 56912 M: 087 661 0834THIS DRAWING IS COPYRIGHT OF MOFFETT ARCHITECTURAL &MUST NOT BE REPRODUCED WITHOUT WRITTEN PERMISSION.PLANNING DRAWING ONLYSITE LAYOUT /DRAINAGE PLANSCALE 1:200DERRYVALLY CURTILAGE WORKSKEYTOTAL Area of Site =8,926 sq.m.or 2.2 Acresor 0.8926 HaEXISTING STORM DRAINAGEPROPOSED STORM DRAINAGERECEIVED: 10/09/2025