Loading...
HomeMy WebLinkAbout2560371 - Validation Check ListName ________________________________________________________________________ VALIDATION CHECKLIST 1. Application Form  Fully completed and signed  Development description corresponds with newspaper notice  Contact Information Sheet completed  Townland Spelling  EIAR Required  EIA Portal Confirmation Notice 2. Fee  Outline Full Permission Permission Consequent after Outline Retention  Basis of calculation checked 3. Press Notice  Newspaper notice one copy circulating in area  Within 14 days of publication of Newspaper notice  Name of applicant  Nature of application  Description of nature and extend of development  Includes Townland / postal address  Protected structure  Environmental Impact Assessment  Natura Impact Assessment  Integrated Pollution Prevention Control  Waste Licence  Application can be inspected / purchased at offices of Council  Submission period within 5 weeks 4. Site Notice  Site notice one copy received  Within 14 days of submission of application  Name of applicant  Nature of application  Development description corresponds with newspaper notice  Application can be inspected / purchased at offices of Council  Submission period within 5 weeks  Date erected  Signed  Located at/near public road entrance  Yellow if within 6 months of previous 5. Site Layout Plan  Six copies required at scale of 1:500  Position of proposed development  Boundary of site delineated in red & corresponds with boundary on location map  Distance from boundaries of site Indicated  North Point indicated  On site / adjacent features shown  Sight distances from entrance indicated & legal agreement if necessary  Treatment works shown Committee of First Ballybay Presbyterian Church, Derryvally, Ballybay xviii-12-16 xix-9-13 n/a n/a n/a n/a n/a n/a n/a (Exempt) n/a  Contours/levels on plan 6. Site Location Map  Six copies 1:1000 (urban) or 1.2500 (rural)  Boundary of site in red  Land ownership in blue  Ordnance Survey Reference  Location of Site Notice Indicated  North Point  Wayleaves in yellow 7. Structural Drawings/Plans  Six copies of plans 1:100  Floor plans, elevations & sections with dimensions  Overall height of structure on all elevations and sections  Dimensions of structure in metric  Extension or alterations marked/ coloured to distinguish from existing  Features of contiguous structures Indicated 8. Site Characterisation Form required  Yes No 9. Part V Compliance Proposals  Yes No N/A  Section 97 Certificate of exemption Yes No  Copy of Section 97 Certificate Application Yes No Signed: ________________________________ Date: 10. Group Water Scheme  G.W.S letter received 11. Conservation  Protected structure  Architectural conservation area  Archaeological conservation area  Protected monument  Natural Heritage Area  Natura 2000 site  Amenity Area  Area Under Strong Urban Influence  Remaining Rural Area  Flooding Area 12. Landowners  Landowners letter of consent  Evidence of ownership 13. Public Road Information  Public Road No. 14. Planning History _______________________________________ _______________________________________ _______________________________________ _______________________________________ 15. Other Notes _______________________________________ _______________________________________ _______________________________________ 11/09/2025 n/a n/a n/a(Existing) n/a n/a n/a n/a n/a n/a n/a n/a n/a L-39004-0 (LT) 41401809 & 41401826 24/60113, 10/352 Refer file for reports to: Municipal District Environmental Health Officer Environment Section Roads Design Section Fire Officer Heritage Officer Built Heritage Section Housing Section Flooding Section Planning County Veterinarian Irish Water National Roads Office/TII Roisin Moore DHLGH Inland Fisheries Ireland An Taisce EPA OPW Other_______________ ___ Heritage Council ? (Ballybay/Clones MD) 25/60371Monaghan41401809First Presbyterian Church41401826