HomeMy WebLinkAbout2560394 - Acknowledgement / Validation Letter
02/10/2025
Bus Éireann
Capwell Garage, Summerhill South
Cork ity,
County Cork T12 YR92
Ref. No:- 25/60394
A Chara,
I wish to acknowledge receipt of your application for permission for the construction of a single-storey
extension to the existing bus station by enclosing the existing internal courtyard area, the reconfiguration
of the entire internal layout of the building to improve accessibility and functionality, the replacement of
the existing roof finish, the reconfiguration of external fenestration and recladding of the existing
building using fibre cement façade materials, the reconfiguration of existing bus circulation to provide 4
no. new bus bays, the installation of a new canopy to the rear of the building to provide additional
covered waiting areas for customers with the installation of c. 118 Sq M of solar voltaic(SV) panels on
same, new boundary treatments around the site, the provision of a dedicated guide dog relief area with
associated landscaping works, the reconfiguration of the car parking layout, including the creation of
designated pedestrian walkways and a new drop-off area, the construction of new pedestrian crossings
at each vehicle entrance, and all associated site and development works necessary to facilitate the
proposed development at Bus Éireann Bus Station North Road, Monaghan County Monaghan was
received on 01/10/2025.
The drawings and specifications submitted with your application are being examined by the Council’s
technical staff and you will be notified of the Council’s decision in due course.
Please note that no work should be carried out in connection with the proposal until a written grant of
permission to do so has been received by you from this Council. The carrying out of work, without the
permission referred to, could render you liable for legal proceedings under the Planning Acts.
Please note that the validity of this application is subject to the Site Notice complying with the
Regulations. An inspection of the site will be carried out within a period of five weeks from the date of
receipt of your application. If in the event of the Site Notice not complying with the Regulations, this
application will be declared Invalid and returned to you.
Mise le Meas,
______________
ANGELA GALLAGHER
ADMINISTRATIVE OFFICER