Loading...
HomeMy WebLinkAbout2560400 - Ecological Impact Assessment Single Wind Turbine Carney’s Island, Clones Ecological Impact Assessment DEC Ltd. July 2025 RECEIVED: 07/10/2025 Document Stage Document Version Prepared by Final 1 Pat Doherty MSc, MCIEEM This report has been prepared by Doherty Environmental Consultants (DEC) Ltd. with all reasonable skill, care and diligence. Information report herein is based on the interpretation of data collected and has been accepted in good faith as being accurate and valid. This report is prepared for Art Generation Limited and we accept no responsibility to third parties to whom this report, or any part thereof, is made known. Any such party relies on the report at their own risk. For and on behalf of Doherty Environmental Consultants Ltd Prepared By: Pat Doherty Signed: Date: 25 November, 2014 RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. i 03/09/2025 Table of Contents 1.0 INTRODUCTION 1 1.1 STATEMENT OF AUTHORITY 1 1.2 RELEVANT LEGISLATION & GUIDANCE 2 1.2.1 LEGISLATION 2 1.2.2 SCHEDULE OF WORKS 5 2.0 METHODOLOGY 5 2.1 DESK STUDY 5 2.2 SITE INVESTIGATIONS 7 2.2.1 HABITAT SURVEYS 7 2.2.2 BIRD SURVEYS 8 2.2.3 BATS 1 2.2.4 TERRESTRIAL MAMMALS 3 2.3 SITE EVALUATION 3 2.3.1 BIRDS 3 2.3.2 BATS 5 2.3.3 NON-VOLANT MAMMALS 6 2.4 IMPACT ASSESSMENT METHODOLOGY 6 2.4.1 IMPACT MAGNITUDE 6 2.4.2 IMPACT SIGNIFICANCE 7 2.4.3 IMPACT ASSESSMENT – BIRDS 7 3.0 CHARACTERISTICS OF THE PROPOSED DEVELOPMENT 11 3.1 KEY COMPONENTS 12 3.2 WIND TURBINE 13 3.3 TURBINE HARDSTAND 14 3.4 SUBSTATION 15 3.5 GRID CONNECTION 16 3.6 TURBINE DELIVERY ROUTE 16 3.7 SITE DRAINAGE 18 3.7.1 WATERCOURSE / DRAINAGE CROSSINGS 21 3.8 PROPOSED CONSTRUCTION SCHEDULE 22 RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. ii 03/09/2025 3.9 WASTE GENERATED DURING CONSTRUCTION 23 3.10 MATERIAL & DISPOSAL OF EXCAVATED MATERIAL 23 3.11 CONSTRUCTION TRAFFIC 24 4.0 RECEIVING ENVIRONMENT 26 4.1 OVERVIEW 26 4.2 DESIGNATED NATURE CONSERVATION AREAS 26 4.3 TERRESTRIAL HABITATS 29 4.3.1 HABITATS OCCURRING UNDER THE FOOTPRINT OF THE PROPOSED TURBINE & ASSOCIATED INFRASTRUCTURE 29 4.4 FAUNA 32 4.4.1 NON-VOLANT MAMMALS 32 4.4.2 BATS 33 4.4.3 BIRDS 35 4.4.4 HERPETOFAUNA 35 4.4.5 INVERTEBRATES 36 4.5 AQUATIC FAUNA 36 4.5.1 FISH 36 5.0 SITE EVALUATION 36 5.1 DESIGNATED CONSERVATION AREAS 36 5.2 HABITATS 36 5.3 FAUNA 37 5.3.1 NON-VOLANT MAMMALS 37 5.3.2 BATS 37 5.3.3 AQUATIC FAUNA 37 6.0 DO NOTHING IMPACT 38 7.0 POTENTIAL IMPACTS OF THE DEVELOPMENT 38 7.1 CONSTRUCTION PHASE 38 7.1.1 IMPACTS TO DESIGNATED NATURE CONSERVATION AREAS 38 7.1.2 CONSTRUCTION PHASE IMPACTS OF THE PROPOSED TURBINE TO HABITATS 39 7.1.3 CONSTRUCTION PHASE IMPACTS TO FAUNA 48 7.2 OPERATIONAL PHASE 50 RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. iii 03/09/2025 7.2.1 IMPACTS TO DESIGNATED NATURE CONSERVATION AREAS DURING THE OPERATION PHASE 50 7.2.2 OPERATION PHASE IMPACTS TO HABITATS 50 7.2.3 OPERATION PHASE IMPACTS TO TERRESTRIAL FAUNA 50 8.0 MITIGIATION MEASURES 58 8.1 CONSTRUCTION PHASE MITIGATION 58 8.1.1 MITIGATION BY AVOIDANCE 58 8.1.2 MITIGATION BY REDUCTION 58 8.1.3 CONSTRUCTION AND DECOMMISSIONING PHASE MITIGATION 59 8.1.4 SITE DRAINAGE 60 8.1.5 WORK TO INSTALL CULVERTS CROSSING OF THE LEGARHILL STREAM 60 8.1.6 CONCRETE, CEMENT & GROUT 61 8.1.7 SILT MANAGEMENT 61 8.1.8 DEWATERING / PUMPING AND OVER PUMPING 62 8.1.9 POLLUTION PREVENTION MEASURES 62 8.1.10 STORAGE OF HAZARDOUS MATERIAL 63 8.1.11 OIL STORAGE & REFUELLING 63 8.1.12 SITE COMPOUND 65 8.1.13 MEASURES TO PREVENT THE SPREAD OF NON-NATIVE INVASIVE PLANT SPECIES 65 8.1.14 MITIGATION MEASURES FOR SPOIL DISPOSAL 67 8.1.15 BIRDS 68 8.1.16 MITIGATION BY REMEDIATION 68 8.2 OPERATIONAL PHASE MITIGATION 69 8.2.1 PROTECTION OF BATS 69 9.0 RESIDUAL IMPACTS OF THE DEVELOPMENT 69 9.1 CONCLUSION 72 9.2 REFERENCES 73 RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island. 1 07/07/2025 1.0 INTRODUCTION This Ecological Impact Assessment (EcIA) report provides an assessment of the potential impacts of the proposed Single Wind Turbine and proposed grid connection route on the flora, fauna and biodiversity of the site and surrounding area. This assessment has been undertaken by Doherty Environmental Consultants (DEC) Ltd on behalf of ART Ltd. and examines the potential ecological impacts of the proposed Single Wind Turbine. The purpose of this assessment is to: • identify the habitats of the site • identify the existing sensitive fauna of the site • identify the potential impact of the proposed development • recommend measures to mitigate probable impacts • identify any residual impacts to the site’s ecology The scope of the following assessment follows the guidance outlined in the CIEEM’s Guidelines for Ecological Impact Assessment (2018); TII Guidelines for Ecological Assessment of National Road Schemes; and the EPA guidance document Guidelines on the information to be contained in Environmental Impact Assessment Reports (2022). The following impact assessment is based upon a review of existing desktop information and the results of on-site field surveys, details for which are provided below. 1.1 Statement of Authority The EcIA has been prepared by Mr. Pat Doherty MSc, MCIEEM, of DEC Ltd. Mr. Doherty is a consultant ecologist with over 20 years’ experience in completing ecological impact assessment and contributing to Environmental Impact Assessment Reports. He has been involved in the completion of assessments of multiple wind farm developments in both the Republic of Ireland and Northern Ireland where he has completed detailed habitat and faunal surveys to inform the assessment process. He has completed focused certified professional development training in a range of ecological survey techniques and assessment processes. Training has been completed for National Vegetation Classification (NVC) and Irish Vegetation Classification (IVC) surveying, bryophyte survey for habitat assessment and identification, professional bat survey and assessment training, mammal surveying and specific training for bird surveys for Wind Farm developments. Training has been completed by RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island. 2 07/07/2025 approved training providers such as CIEEM, British Trust for Ornithology and the Field Studies Council 1.2 Relevant Legislation & Guidance 1.2.1 LEGISLATION 1.2.1.1 EU Habitats Directive 92/43/EEC, European Communities (Natural Habitats) Regulations 1997, European Communities (Birds and Natural Habitats) Regulations 2011 The Habitats Directive provides the basis of protection for Natura 2000 sites, namely Special Protection Areas (“SPAs”) and Special Areas of Conservation (“SACs”). Article 6 of the EU Habitats Directive requires that any proposal that may have a significa nt effect on a Natura 2000 site must be subject to an Appropriate Assessment. An Appropriate Assessment is required in order to ascertain the potential impact of a proposal on the reasons for which the site is designated, and thereby ascertain the potential for adverse impact on the integrity of the site. A proposal that may adversely impact the integrity of the site may not be consented except in the absence of Feasible Alternative Solutions and in the event of Overriding Public Interest. A Natura Impact Statement has been undertaken for the proposed EIA Development. This concludes that the proposed EIA Development will not, adversely affect the integrity of any European Site (Natura 2000 site), either directly, indirectly or cumulatively. The Habitats Directive also provides for the protection of species listed under Annex IV of the Directive wherever they occur. These species include otter and all bat species. The Habitats Directive was transposed into Irish law by the European Communities (Natural Habitats) Regulations 1997 and subsequently amended in the European Communities (Birds and Natural Habitats) Regulations 2011. Regulation 42 of the 2011 regulations requires that any proposal likely to have a significant effect on a European Site, alone or in combination with other operations or activities, needs to be assessed with respect to its potential impact in the site’s conservation objectives (an Appropriate Assessment) and that the decision-making authority should be furnished with a Natura Impact Statement that incorporates a Screening Assessment and Appropriate Assessment as necessary. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island. 3 07/07/2025 1.2.1.2 Environmental Impact Assessment Directive (2011/92/EU) European Union Directive 2011/92/EU (“the EIA Directive”) considers the assessment of the effects of certain public and private projects on the environment. It has been transposed to Irish legislation by the Planning and Development Act 2000 (as amended), and the Planning and Development Regulations (2000 – 2015) (hereafter referred to as the “2011 EIA Regulations”). The Planning and Development Act 2000 (as amended) Part X, Section 171A (1) requires that an EIA is carried out by the competent authority (i.e. the local planning authority or An Bord Pleanála): “that shall identify, describe and assess in an appropriate manner, in light of each individual case and in accordance with Articles 4 to 11 of the Environmental Impact Assessment Directive, the direct and indirect effects of a proposed development on the following: (a) human beings, flora and fauna….,” 1.2.1.3 Environmental Impact Assessment Directive (2014/52/EU) The requirements of the revised EIA Directive (2014/52/EU) (“the Revised EIA Directive”), which will be incorporated into Irish law, are taken into account by the observance of draft Revised Guidelines on the information to be contained in Environmental Impact Statements1. Annex IV of the Revised EIA Directive provides requirements for information to be included in the EIAR (as referred to in Article 5(1)(f). Additional emphasis has been placed on ‘biodiversity’ in the 2014 EIA Directive (see Section 1: Introduction of this REIS / EIAR for further details). 1 Environmental Protection Agency. Revised Guidelines on the information to be contained in Environmental Impact Statements. . Draft, September 2015. Available at: http://www.epa.ie/pubs/consultation/reviewofdrafteisguidelinesadvicenotes/ RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island. 4 07/07/2025 1.2.1.4 EU Birds Directive 79/409/EEC EU Birds Directive 79/409/EEC ("the Birds Directive”) establishes a system of general protection for all wild birds throughout the European Union. Annex I of the Birds Directive comprises 175 bird species that are rare, vulnerable to habitat changes or in danger of extinction within the European Union. Article 4 establishes clearly that wherever those species occur, they should be the subject of special conservation measures concerning their habitat in order to ensure their survival and reproduction in the area of distribution. Similar actions should be taken by Member States regarding migratory species, even if they are not listed in Annex I. 1.2.1.5 Bern and Bonn Convention The Convention on the Conservation of European Wildlife and Natural Habitats (Bern Convention 1982) exists to conserve all species and their habitats. The Convention on the Conservation of Migratory Species of Wild Animals (Bonn Convention 1979, enacted 1 983) was instigated to protect migrant species across all European boundaries. 1.2.1.6 The Wildlife Act (1976) as amended (2000) The Wildlife Act 1976 gives protection a wide variety of birds, animals and plants in the Republic of Ireland. It is unlawful to disturb, injure or damage to their breeding or resting place wherever these occur without an appropriate licence from National Parks and Wildlife Service (“NPWS”). All birds, their nests and eggs are protected under law in Ireland through the Wildlife Act 1976 (as amended in 2000). Wilful destruction of an active nest from the building stage until the chicks have fledged is an offence. The act also provides a mechanism to give statutory protection to Natural Heritage Areas (“NHAs”). The amendment in 2000 broadens the scope of the Wildlife Acts to include most species, including the majority of fish and aquatic invertebrate species which were excluded from the 1976 Act. 1.2.1.7 Flora (Protection) Order, 1999 The Flora (Protection) Order affords protection to listed vascular plants, mosses, liverworts and stoneworts. It is illegal to cut, uproot or damage the listed species in any way, or to offer them for sale. This prohibition extends to the taking or sale of seed. In addition, it is illegal to alter, damage or interfere in any way with their habitats. This protection applies wherever the plants are found and is not confined to sites designated for nature conservation. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island. 5 07/07/2025 1.2.2 SCHEDULE OF WORKS DEC Ltd. was commissioned to undertake an Ecological Impact Assessment of the proposed Single Wind Turbine at Carney’s Island Clones and associated grid connection route. A desktop survey was undertaken to gather existing baseline information for the proposed development site and surrounding area. A range of on-site field surveys were completed to inform the baseline biodiversity conditions at and surrounding the proposed development site. Field surveys were completed at the project site to inform this screening report for Appropriate Assessment. The field surveys included targeted vantage point surveys and winter and breeding bird season transect surveys. Habitat surveys were also completed and particularly attention was given to recording the presence of surface water pathways in the form of watercourses or surface drains. . The vantage point surveys comprised watches from a vantage point that provides a view of the proposed turbine location and the wider surrounding area. The vantage points were completed during the 2023 and 2024 breeding season, and the 2023/2024 non-breeding season on the 26th April 2023; 14th June 2023; 12th October 2024; 7th February 2024; 1st May 2024; 9th May 2024;. A watch of 3.5 hours was completed during each of the vantage point surveys amounting to a total of 21 hours vantage point surveying of the proposed turbine location and wider surrounding area. Subsequent to the termination of each vantage point watch, walked transect surveys were completed within the fields at and adjacent to the proposed turbine location and access track. The location of the vantage point and the bird transects are shown on Figure 1.3.. 2.0 METHODOLOGY 2.1 Desk Study A desktop assessment was carried out to collate available information on the ecological baseline of the proposed land-holding and surrounding area. Consultation was undertaken with site RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island. 6 07/07/2025 management as well as relevant statutory and non-statutory agencies. In addition to the above the following research was also undertaken: • A review of the National Biodiversity Data Centre (NBDC) to identify the presence or otherwise of protected species occurring within close proximity to the proposed site . The area of search for records of rare, threatened or protected is shown on Figure 2.1 below. • A review of the NPWS online database to identify the presence or otherwise of designated conservation areas (i.e. SPAs, SACs, NHAs etc.) • A review of Site-Specific Conservation Objectives (SSCO) mapping, published by the NPWS, for SACs and SPA. • A review of the online BCI Batlas • A review of the New Atlas of the British and Irish Flora (Preston et al., 2002) • A review of the New Atlas of Breeding Birds in Britain and Ireland: 2007 – 2011 (Balmer et al, 2012) • Review of aerial photography, satellite imagery and historical mapping for the proposed site RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island. 7 07/07/2025 Figure 2.1: Area of Search for Species Records held by the NBDC 2.2 Site Investigations 2.2.1 HABITAT SURVEYS Habitat surveys were carried out on the 26th April 2023 and again on the 9th May 2024. Habitat surveys were carried out to identify, describe, map and evaluate habitats and to verify information gathered at the desk study stage. The basis of the surveys undertaken on the above dates was an “Extended” Habitat Survey. This habitat survey was undertaken in accordance with the Heritage Council Draft Best Practice Guidance for Habitat Survey and Mapping. The National Vegetation Classification (NVC) User’s Handbook also informed the approach to the habitat surveys. Habitats were classified using Fossitt’s Guide to Habitats in Ireland (2000) which classifies habitats according to a hierarchical framework with Level 1 habitats representing broad habitat groups, Level 2 representing habitat sub-groups and Level 3 representing individual habitats. The field survey focused on identifying Level 3 habitats. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island. 8 07/07/2025 The DAFOR scale was used to characterise the vegetation within each habitat. This scale refers to plant species in terms of dominance, abundance, frequency, occasional and rare (DAFOR). In this report, scientific and common names for higher plants follow those in the Botanical Society of the British Isles (BSBI) standard list, published on its website www.bsbi.org.uk. Scientific and common names for bryophytes follow Smith (2004). Scientific and common names of mammals follow Whilde (1993). 2.2.1.1 Non-volant Mammal Survey The mammal survey involved walking either side of hedgerows and other field boundaries, along the Legarhill Stream and through recently felled woodland, recording any field signs of mammal activity. These field signs, as described in Neal & Cheeseman (1996) and Bang & Dahlstrom (2006), include: • mammal breeding and resting places, such as setts, holts, lairs • pathways • prints • faecal deposits • latrines (and dung pits used as territorial markers) • feeding signs (snuffle holes) • hair; and • scratch marks During these surveys particular attention was given to search the Legarhill Stream crossed by the proposed access track for field signs indicating the presence of otters and their breeding and resting places (i.e. holts and couches). 2.2.2 BIRD SURVEYS 2.2.2.1 Vantage Point Surveys The methodology adopted for the vantage point surveys was derived from the Scottish Natural Heritage (SNH) guidance document Recommended bird survey methods to inform impact assessment of onshore wind farms (2017). These guidelines outline specific survey methodologies for undertaking surveys to assess the potential impact of wind farms to lowland/farmland species. With regard to smaller scale developments such as Single Wind Turbine projects, the SNH guidelines state: RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island. 9 07/07/2025 Smaller developments and even single turbines may also present a potential risk if placed in areas of high bird sensitivity, particularly on or near SPAs. Survey effort and assessment of the possible impacts of a proposed wind farm on birds should be in proportion to the scale of the wind farm and the bird interest in the area. A number of small scale developments will either not require an EIA or, if they are only just over the thresholds, require a limited environmental assessment. Typically, these very small developments (including ‘domestic’ turbines of 15m or less) are not considered to be a significant risk to birds, exceptions to this being proposals on or near designated sites, or where the location is very close to the nest site of a Schedule 1 bird. Assessment of existing bird data for the area may be all that is needed in many of these cases and simple mitigation such as relocating the turbine further away from a designated site or a Schedule 1 bird nest site may be sufficient to overcome any issue s without the need for further survey. Due to the small scale of the proposed development with only one turbine included, the SNH recommended level of survey (which typically involves 36 hours of vantage point watching per vantage point per season) for this assessment has been scaled down to reflect the limited scale of the proposed development. SNH guidance for surveys at wind farms recommend that field surveys focus on those species of high nature conservation value for which there is potential for impacts to occur. These target species tend to be limited to those species of conservation concern, which as a result of their flight patterns or response behaviour are considered to be susceptible to either displacement due to wind turbine operation or collision with turbine blades. Bird surveys involved vantage point surveys and a transect survey through the project site. The vantage point surveys comprised watches from a vantage point that provides a view of the proposed turbine location and the wider surrounding area. The vantage points were completed during the 2023 and 2024 breeding season, and the 2023/2024 non-breeding season on the 26th April 2023; 14th June 2023; 12th October 2024; 7th February 2024; 1st May 2024; 9th May 2024;. A watch of 3.5 hours was completed during each of the vantage point surveys amounting to a total of 21 hours vantage point surveying of the proposed turbine location and wider surrounding area. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island. 10 07/07/2025 Subsequent to the termination of each vantage point watch, walked transect surveys were completed within the fields at and adjacent to the proposed turbine location and access track. The location of the vantage point and the bird transects are shown on Figure 2.1. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: July 2025 Document Issue: Final DEC Ltd. 11 24/06/2024 RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final Tonregee SWT 1 03/09/2025 2.2.3 BATS The suitability of the project site to support bats was evaluated by reviewing the bat landscape favourability model (Lundy et al. 2011) and appraising the habitats occurring within the site or their potential to support foraging bats. This latter appraisal was completed with reference to the foraging habitat preferences of bats, as detailed by Collins et al. (20 23) and the SNH (2019) guidance for appraising the habitat risk for bats. Bat activity surveys were completed during the 2024 bat activity season. One round of bat activity survey was completed. The activity surveys were based on continuous automatic bat detector surveys undertaken during the 2024 bat activity season between the 1st May and 11th 9th May over a period of 9 consecutive nights. The automatic bat detector survey was undertaken using a Song Meter Mini Full Spectrum Ultrasonic Bat Detector. The detector was positioned at one monitoring station (MS) adjacent to the proposed turbine location along the edge of the recently felled conifer plantation. The location of the monitoring station is shown in Figure 2.2. The bat detector was mounted on a pole at a height of 3m. The Song-Meter was set to record continuously throughout each night of monitoring. Recording commenced 30 minutes before sunset and terminated 30 minutes after sunrise. Analysis of bat calls recorded during the activity surveys was undertaken using Kaleidoscope software. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 2 03/09/2025 RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 3 07/07/2025 2.2.4 TERRESTRIAL MAMMALS The mammal survey involved walking either side of hedgerows and along drainage ditches and recording any field signs of mammal activity. The mammal survey was completed during the July habitat survey. These field signs, as described by Neal & Cheeseman and Bang & Dahlstrom (2006) include: • Mammal breeding and resting places, such as setts, holts and lairs • Pathways • Prints • Faecal deposits • Latrines (and dung pits used as territorial markers) • Feeding signs (snuffle holes) • Hair and Scratch marks 2.3 Site Evaluation The nature conservation value of habitats and ecological sites occurring within the proposed site are based upon an established geographic hierarchy of importance as outlined by the National Roads Authorities (NRA, 2009). The outline of this geographic hierarchy is used to determine ecological value in line with the ecological valuation examples provided by the NRA (see NRA, 2009). The geographic evaluation hierarchy is as follows: • International Sites (Rating A) • National Importance (Rating B) • County Importance (Rating C) • Local Importance (higher value) (Rating D) • Local Importance (lower value) (Rating E) 2.3.1 BIRDS The bird assemblage recorded at the proposed development site is valued with regard to the ecological valuation examples set out in Guidelines for Assessment of Ecological Impacts of National Roads Schemes: Revision 2 (2009). RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 4 07/07/2025 The evaluation of the avifauna recorded at the project site during the baseline surveys is also informed by the approach detailed by Percival (2003). This approach defines the sensitivity of a species and bird assemblage as the ecological importance and nature conservation interest at the site being assessed. The ecological importance and nature conservation interest is determined by a number of factors including: • whether the species is on Annex 1 of the EC Birds Directive • whether the area being assessed is subject to any nature conservation designations • whether the species is particularly ecologically sensitive: this includes larger birds of prey and rare breeding birds (including divers, common scoter, hen harrier, golden eagle, red-necked phalarope, roseate tern and chough) • whether the site contains species at nationally important numbers (>1% of Irish population) • whether the site contains species at regionally important numbers (>1% of regional population, with the region usually taken as the county) • whether the species is subject to special conservation measures, e.g. as Red or Amber species on the BirdWatch Ireland’s (Newton et al. 1999) list of Birds of Conservation Concern. The determination of sensitivity is summarised, as per Percival (2003), in Table 2.2 below: Table 2.1: Criteria for Ranking Bird Sensitivity Sensitivity Determining Factor Very High Species listed as qualifying interests for SPAs and other statutorily protected nature conservation areas. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 5 07/07/2025 High Species that contribute to the integrity of a SPA but which are not listed as qualifying interests for which the site is designated. Ecologically sensitive species including the following: Red Grouse; hen harrier; and golden eagle. Species present in nationally important numbers (>1% Irish population). Medium Species on Annex 1 of the EC Birds Directive Species present in regionally important numbers (>1% regional (county) population) Other species on BirdWatch Ireland’s red list of Birds of Conservation Concern Low Any other species of conservation interest, including species of BirdWatch Ireland’s amber list of Birds of Conservation Concern not cover above. 2.3.2 BATS The approach outlined by Kepel (2011) to quantifying bat activity has been used to evaluate the level of bat activity recorded at and surrounding the proposed development site and the importance of the proposed development site and surrounding area as a foraging resource for bats. The Kepel approach is based on assigning the number of bat passes recorded per hour per night of each monitoring session to an activity category. Kepel has assigned the number of passes per hour to three activity categories. These activity categories are as follows: RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 6 07/07/2025 • Pipistrelle species and Leisler's bat: Low = <3.5 passes per hour; Moderate = 3.6 – 6.5 passes per hour; High = >6.5 passes per hour. • All Other Bat species: Low = <4.0 passes per hour; 4.1 to 10 passes per hour; high = >10 passes per hour. The median bat pass per hour per night for each species recorded during bat activity surveys has been used to assign bat activity levels in line with the Kepel approach. Median bat pass per hour per night is used during this analysis as it is recognised as providing a more accurate representation of activity, as bat activity levels between nights can be highly variable and thus the median provides a more reliable value that the mean or maximum (Lintott & Matthews, 2018). 2.3.3 NON-VOLANT MAMMALS The nature conservation value of non-volant mammal populations recorded during field surveys has been assigned in accordance with the criteria set out by the TII 2009 guidance document. 2.4 Impact Assessment Methodology 2.4.1 IMPACT MAGNITUDE Impact magnitude refers to changes in the extent and integrity of an ecological receptor. The CIEEM (2006) defines integrity of designated conservation areas as “the coherence of the ecological structure and function across the area that enables it to sustain the complex of habitat and/or the levels of populations of the species for which it was classified”. For non-designated sites this can be amended to: “the coherence of ecological structure and function, that enables it (the site or populations supported by the site) to be maintained in its present condition”. For the purposes of this assessment the impact magnitude is influenced by the intensity, duration, frequency and reversibility of a potential impact and is categorised as follows: • High magnitude impact: that which results in harmful effects to the conservation status of a site, habitat or species and is likely to threaten the long-term integrity of the system. • Moderate magnitude impact: that which results in harmful effects to the conservation status of a site, habitat or species, but does not have an adverse impact on the integrity of the system. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 7 07/07/2025 • Low magnitude impact: that which has a noticeable effect but is either sufficiently small or of short duration to cause no harm to the conservation status of the site, habitat or species. • Imperceptible: that which has no perceptible impact. • Positive: that which has a net positive impact for the conservation status of a site, habitat or species. 2.4.2 IMPACT SIGNIFICANCE The significance of impacts is determined by evaluating the nature conservation value of the site, habitat or species concerned together with the magnitude of the impacts affecting the system. The more ecologically valuable a receptor and the greater the magnitude of the impact, the higher the significance of that impact is likely to be. Table 2.3 outlines the levels of impact significance to be used during the assessment of impacts. The probability of an impact occurring will also be outlined when defining the significance of impacts. Table 2.2: Impact Significance Matrix Nature Conservation Value Magnitude of Potential Impact High Moderate Low Negligible International (A) Severe Major Moderate Minor National (B) Severe Major Moderate Minor County (C) Major Moderate Minor Minor Local (D) Moderate Minor Minor Imperceptible Low (E) Minor Imperceptible Imperceptible Imperceptible 2.4.3 IMPACT ASSESSMENT – BIRDS The sensitivity of a species is defined by evaluating its ecological importance and nature conservation interest. Species sensitivity is ranked on a scale from very high to low. The criteria used to rank species sensitivity is outlined in Table 2.4. Table 2.3: Species Sensitivity RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 8 07/07/2025 Sensitivity Determining Factor Very High Species listed as qualifying interests for SPA and other statutorily protected nature conservation areas. High Species that contribute to the integrity of a SPA, but which are not listed as qualifying interests for which the site is designated. Ecologically sensitive species including the following: Red Grouse, hen harrier and golden eagle. Species present in nationally important numbers (>1% Irish population). Medium Species on Annex 1 of the EC Birds Directive Species present in regionally important numbers (>1% regional (county) population) Other species on BirdWatch Ireland’s Red list of Birds of Conservation Concern Low Any other species of conservation interest, including species of BirdWatch Ireland’s Amber list of Birds of Conservation Concern not covered above. 2.4.3.1 Impact Magnitude Once the species/populations in the study area have been evaluated in terms of their sensitivity, the next step is to determine the magnitude of the possible impacts that may occur on those species/populations. The impact magnitude is based on the scale of loss or alteration to key elements/features of the baseline conditions. Impact magnitude is ranked on a five -point scale from very high to negligible. Table 2.5 outlines the criteria for determining the impact magnitude of wind farm developments. Table 2.4: Criteria for Determining The Impact Magnitude Magnitude Description Very high Total loss or very major alteration to key elements/ features of the baseline conditions such that the post development character/ composition/ attributes will be fundamentally changed and may be lost from the site altogether. Guide: < 20% of population / habitat remains RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 9 07/07/2025 High Major loss or major alteration to key elements/ features of the baseline (pre- development) conditions such that post development character/ composition/ attributes will be fundamentally changed. Guide: 20-80% of population/ habitat lost Medium Loss or alteration to one or more key elements/features of the baseline conditions such that post development character/composition/attributes of baseline will be partially changed. Guide: 5-20% of population/ habitat lost Low Minor shift away from baseline conditions. Change arising from the loss/alteration will be discernible but underlying character/composition/attributes of baseline condition will be similar to pre - development circumstances/patterns. Guide: 1-5% of population/ habitat lost Negligible Very slight change from baseline condition. Change barely distinguishable, approximating to the “no change” situation. Guide: < 1% population/ habitat lost 2.4.3.2 Impact Significance The determination of impact significance is carried out by assessing together the predicted magnitude of impact and the sensitivity of the local bird community. Table 2.6 below outlines the impact significance matrix used for assessing the impact significance of the proposed development to bird species. Table 2.5: Impact Significance Matrix for Assessing Impacts to Bird Species Significance Sensitivity Very High High Medium Low Magnitude Very High Very high Very high High Medium High Very high Very high Medium Low Medium Very high High Low Very low Low Medium Low Low Very Low Negligible Low Very Low Very Low Very Low RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 10 07/07/2025 RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 11 07/07/2025 3.0 CHARACTERISTICS OF THE PROPOSED DEVELOPMENT The Clones Wind Farm development will include the following:- • Construction of 1 No. site entrance and any sections of internal access track to facilitate access to the temporary construction compound; • Construction of 1 No. temporary construction compound, including fencing site offices, parking, material laydown and storage areas, etc; • Upgrading and widening of existing internal tracks to a wind farm road standard and construction of new wind farm roads, including all excavation, importation, and placement of stone and associated materials. • Earthworks and drainage infrastructure associated with construction of new and upgraded internal access roads, crane hardstand, turbine foundations and substation compound; • Construction of upgraded and new drainage/watercourse crossings for construction of internal access roads and underground cables; • Excavation of turbine bases and associated turbine hardstand areas; • Construction of wind turbine foundations and hardstands; • Installation of underground cabling between turbine and substation; • Construction of the 20kV Substation compound and building; • Construction of 1.9km of underground cable connection from the wind farm substation to the existing Clones Substation and all associated remedial/. Reinstatement works to the public road; • Delivery, installation, and commissioning of the proposed turbine. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 12 07/07/2025 3.1 Key Components The development proposed by the applicant, is a 1 No. turbine wind farm in the townland of Clones and all associated infrastructure including a connection to the National Electricity Grid. The proposed development will consist of the following elements: • Construction and operation of 1No. wind turbine, with an overall tip height of up to 149.61m; • Construction of a crane hardstanding area for the wind turbine erection; • Approximately 1.1km of new internal access road; • An on-site 20kV electrical substation; • Underground electrical and communications cabling connecting the turbine to the site substation; • Approximately 1.9 kilometres of underground cabling connecting the 20kv wind farm substation to the existing • Clones Substation; • 1 No. site entrance onto the R183 regional road; • 1 No. temporary on-site construction compound; • Associated surface water management systems; • All associated ancillary infrastructure and preparatory works. The proposed project will have a lifespan of 30-years. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 13 07/07/2025 3.2 Wind Turbine The proposed wind turbines will be a Nordex N133 on a 71.5m tower and will have a maximum tip height of 143.8m. A drawing of the proposed wind turbine is shown on Drawing No. 22790 - 200 & 201. The turbines installed on the site will be the conventional three -bladed, tubular tower model with horizontal axis. The rotor blades are bolted to the central rotor hub, which is connected to the nacelle. The nacelle contains the following turbine components:- • Generator • Electrical components • Aviation lighting to Irish Aviation Authority (IAA) specifications. The entire nacelle and rotor are designed to rotate, or ‘yaw’, in order to face the prevailing wind. A wind vane located on the nacelle of the turbine controls the yaw mechanism. A control unit is typically located at the base of the turbine and an internal lift or ladder leads up to the nacelle where the shaft, generator and gearbox are located. The turbine tower is a conical steel tube with multiple layer paint finish. Towers comprise a steel ring at the base of the tower which is assembled on top of the concrete foundations. The tower will be delivered to site in three sections. The base of the tower is approximately 4.3m in diameter, tapering to approximately 3.2m where it is attached to the nacelle. The tower is accessed by a galvanised steel hatch door, which will be kept locked except during maintenance. The blades of the turbines are typically made of fibreglass or carbon fibre reinforced polyester and are aerodynamically shaped to improve efficiency and lower noise production. The turbines are multi-ply coated to protect against corrosion. It is proposed that the turbines will be of an off-white or light grey colour to blend into the sky background RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 14 07/07/2025 3.3 Turbine hardstand The crane Hardstand will be constructed to accommodate and support the Wind Turbine components, cranes and other plant during delivery and Turbine erection. Hardstands will also be used for maintenance activities while the Wind Turbines are in operation. The dimension of a single Hardstand is circa 91 metres in length and 35 metres in width. There will also be smaller temporary stoned areas constructed to store the Wind Turbine parts and components prior to erection, these will be removed, and the areas reinstated on completion of the Wind Turbine erection. See Planning Drawing 22790-202 for details on the Hardstand. The crane Hardstands will be constructed to support the significant loads imposed by the outriggers of the main lifting crane during the Wind Turbine installation process on site. Hardstand construction will include the following:- 1. The excavation process will involve hydraulic excavators moving excavated material to on -site repository areas using articulated dumper trucks or tractor and trailers. 2. Topsoil will be excavated in the presence of the Archaeologist and removed to the temporary topsoil repository area for use in the permanent reinstatement works. 3. The Hardstand formation will be formed by excavating subsoil to a suitable bearing stratum in accordance with the requirements of the Design Engineer. 4. The Hardstand will be constructed using imported stone aggregate rolled in layers and tested in accordance with the requirements of the Design Engineer. 5. Temporary set down areas will be created at each crane Hardstand to store Wind Turbine components such as the rotor hub assembly, turbine blades, turbine towers, and nacelle. These areas will be made of compacted stone aggregate, these will be removed and the areas reinstated on completion of the Wind Turbine deliveries. 6. Plate bearing tests will be conducted on the completed Hardstand surface to verify if the Hardstand bearing strengths meet the crane outrigger load requirements. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 15 07/07/2025 7. The main crane outrigger areas are subjected to the highest levels of stress and as such strict minimum requirements are put in place to ensure safety during the works. This includes but is not limited to: a. Surface Evenness of equal or less than 0.25% slope. b. Minimum Bearing Capacity of 220kN/m2. 3.4 Substation It is proposed to construct a 20kV electricity Substation within the site boundary as shown on Drawing No. 22790-102. This Substation will provide a connection to the national grid via an underground 20kV transmission cable connection. The construction and electrical components of the on-site Substation will be to ESB, Electrical Designer and Wind Turbine Supplier specifications. The Substation compound will have an area of approximately 256m2 and will include one Substation building and electrical components. The Substation and compound will be surrounded by stockproof fencing. Prior to construction beginning, interception drains will be placed uphill from the planned Substation area to catch any current overland water flows and direct them downhill to minimise water contact with the construction site. The clean water will be released through a level spreader downhill from the construction site, flowing over the current vegetation. The construction will include the following:- 1. The Substation compound's area will be outlined using ranging rods or wooden posts. 2. Perimeter drains will be installed or upgraded to collect surface water run-off from the Substation compound. This will involve the installation of check dams, silt traps and level spreaders to manage surface run-off effectively. 3. Topsoil will be stripped and carefully stockpiled for future landscaping use. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 16 07/07/2025 4. Subsoil will be excavated and retained on site by incorporated it into the perimeter of the compound area. 5. The Substation compound will be formed by constructing compacted layers of suitable hardcore; 6. The foundations for both Substation buildings will be excavated down to the level indicated by the designer and appropriately shuttered; 7. Steel reinforcement will be laid in place and concrete foundations will be poured; 8. The Substation building will be constructed on top of the concrete foundations. 9. Construction of underground cable ducts and trenches within the Substation compound will be carried out; 10. On completion of the ground works the area will be re-topsoiled and landscaped; 11. Stockproof fencing and gates will be installed around the compound perimeter on completion of the landscaping works. 3.5 Grid Connection The turbine will connect directly to the national electrical grid network at the approved substation. The grid connection route is not included as part of this planning application but is assessed as part of the Planning and Environmental Report. The grid connection is via circa 1.9km of underground 20kV electrical cabling connecting to Clones 38kV Substation in the townland of Clones, County Monaghan. The majority of the grid connection will be constructed in public road verges and footpaths. 3.6 Turbine Delivery Route The components for the Wind Turbines will be delivered by cargo ships to the Port of Waterford, which is also known as Belview Port, and is actually located in County Kilkenny. The components for the Wind Turbine will be delivered in separate loads, some of which are abnormal RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 17 07/07/2025 in terms of their width and length. The components will be transported from Belview to the site along the motorway, national, regional and local road network. Several junction locations along the national road and both bends and junctions on the regional road network require temporary works to accommodate these deliveries of Wind Turbine components to the site, as well as construction works at the site access on the R183. These works will include the temporary alterations at locations on the N54 and the R183. This will include the temporary hardstanding’s, making signposts, lighting columns and kerbs demountable / hinged, utility diversions, minor drainage works (i.e. temporary relocated interceptor ditches) hedgerow / vegetation cutting for oversail. At construction stage a transportation plan will be prepared by the Wind Turbine component delivery company. Permits for moving the abnormal loads on the public roads to the Wind Farm site will be obtained from An Garda Síochána and the applicable local authorities on the selected haulage route. The selected haulage route is detailed below: • Starting at Belview Port; • Turn Left, then the next right onto the N29; • Merge onto the N29; • At the Slieverue Roundabout, exit to stay on N29 going Northbound; • At the Luffany Roundabout, exit onto the N25, Waterford City Bypass; • Continue onto the N25; • After 6km take the third exit onto the N9, continue to Quarry Roundabout, exiting onto the M9 going Northbound; • Merge onto the M7; RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 18 07/07/2025 • Merge onto the M50 via slip road to Northbound/Dublin Port Toll Road; • At junction 6, take the N3 exit; • Exit the N3 at junction 4 onto the M3; • Continue straight through roundabout onto the N3; • Turn right onto the R165; • Continue onto the L2011; • Slight right onto the L2010; • Turn right onto the R212; • Turn right onto Abbey Street; • Turn right onto Analore Street; • Continue on the R183; • Take third left turn into the site entrance 3.7 Site Drainage Clean water cut-off drainage will be installed up-hill or up-stream around the perimeter of the proposed work areas as part of the Enabling Works. This drainage “cuts-off” existing drainage runs from entering the proposed work areas thus reducing site surf ace water run-off, prevent soil erosion, and protect the water quality downstream. This drainage will be temporary and on completion of the site works it will be removed or altered and incorporated into the permanent works drainage. Permanent drainage will be constructed during construction of the Access Roads, Hardstands, Turbine Foundations, Substation. While construction works are being carried out, this drainage RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 19 07/07/2025 tends to pick-up a suspended solids – and is often known as “dirty water”. During the construction stage, this dirty water drainage is directed to a number of sediment control measures such as check dams and settlement ponds. The permanent drainage during the construction stage is therefore often referred to “dirty water cut-off drainage”. Plate 3.1 below shows a typical check dam arrangement. The site's proposed drainage system is detailed in Planning Drawings 22729-130 to 22729-134, provided under separate cover with the planning application documentation. Plate 3.1: Check Dam The drainage design will incorporate the following:- 1. Check dams strategically positioned at regular intervals along all drains to slow down flow, encourage settlement, prevent scour and ditch erosion, and prevent silt from reaching adjoining drainage channels. 2. Low gradient drains will be installed. These slow down the flow rate in the drains, which decreases soil and subsoil erosion and reduces the amount of water entering watercourses. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 20 07/07/2025 3. Existing drains will be preserved where applicable. 4. Regular buffered outfalls will be installed. These are composed of several minor drains branching from the main drain and terminating by spreading out into the nearby vegetation through tapered drains. The drain will have hardcore material to capture suspended sediment. 5. Construction site runoff will be redirected into settlement ponds to encourage sediment deposition and decrease hydraulic loading by lowering flow velocities, enabling sediment to settle. The settlement ponds are structured as a three-stage tiered pond system. The settlement pond system design for the site is outlined in Planning Drawing 22729-102 & 103. 6. Water from the settlement ponds will flow into the sediment traps for additional cleaning through a sequence of graded gravel filters. 7. Drainage ditch outfalls from silt traps will release water periodically to imitate natural hydrology, promoting percolation and reducing hydraulic loadings at discharge sites. The drainage ditches will discharge onto the ground by spreading out over the surrounding vegetation through tapered drains. 8. The Access Roads will be graded to ensure that all runoff is channelled towards the dirty water drains. A small embankment will be built between the road and clean water drains to prevent runoff from the road from entering the clean water system. 9. Where possible the natural vegetative barrier will not be disturbed. Protective barriers and fences will be installed to prevent access to protected areas. 10. All drainage and silt control measures will be regularly inspected during the construction works to ensure they are performing correctly. When necessary, silt will be cleaned out from silt control measures and disposed of on site, initially by stockpiling to allow drying out, and then incorporating into groundwork finishing works. Plate 3.2 below shows a typical check dam arrangement with several dams strategically positioned at regular intervals along an open drain. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 21 07/07/2025 Plate 3.2: Multiple Check Dams as Silt Control Measure 3.7.1 WATERCOURSE / DRAINAGE CROSSINGS As part of the upgrade to the existing road and new road construction there will be one drain and stream surface water drainage crossing. This will include the construction of new drainage crossings. The sizing, layout and works methodology of drainage crossings will be agreed with Monaghan Co. Co. and, where required, with the OPW, prior to construction. In general drainage crossings will be constructed of concrete precast concrete or High-Density Polyethylene (HDPE) pipes and will cater for a minimum 1 in 100-year return rainfall event with an additional 30% allowance for climate change. • The invert of the pipe will be submerged approximately 1/4 of its diameter below the original drainage bed. Where natural gradients allow, a nominal back fall in the pipe will be incorporated to prevent scour and promote the settling of natural material along the invert of the pipe RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 22 07/07/2025 3.8 Proposed Construction Schedule It is anticipated that the overall construction of the development will take approximately 10 -12 months from starting on-site to final commissioning of the Wind Turbine. All vegetation clearance that is required for the construction works will be carried outside the bird breeding season, which runs from the 1st of March to the 31st of August. To comply with this requirement a section of the initial Civil Engineering Works may be carried out as advance enabling works in the months from September to February. Error! Reference source not found. below details the works in a number of key phases, some of these phases will run in parallel. Table 3.1: Proposed Development Construction Stage Duration and Phasing Phase Activity Phase 1 Site Preparation, Pre-construction activities, Site entrance Construction Phase 2 Access Road Construction + Drainage Plan Implementation Phase 3 Crane Hardstand Construction Phase 4 Turbine Foundation Construction Phase 5 Substation Construction RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 23 07/07/2025 Phase 6 Internal Trenching and Ducting Phase 7 Turbine Delivery Phase 8 Turbine Erection Phase 9 Grid Connection Construction Phase 10 Wind Farm Commissioning 3.9 Waste Generated during Construction The wastes likely to be generated during the construction phase will include the following: • Excavated material from road cuts and foundations. The material will be stored in a centralised area to minimise environmental impact and will be used on-site for hardstanding and embankments; • Cut-offs from building material. This material will be taken off-site for re-use, recycling, or taken to a licensed landfill facility; • Domestic type waste by contractors. This material will be collected on-site, stored in an enclosed skip and disposed of at a licensed landfill facility 3.10 Material & Disposal of Excavated Material Where necessary, excavated soil material will be stored, out of the path of trafficking machinery. Where the topsoil layer must be temporarily held in the spoil storage areas, the contractor will divide the storage areas to ensure that the topsoil layer is not mixed with the underlying soils. This will facilitate adequate site reinstatement and ensure re -vegetation of the land occurs as quickly as possible. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 24 07/07/2025 Site inspections indicate that the soil conditions at the site will facilitate material being stockpiled to a height of no greater than 2.0m. Depending on geotechnical considerations, the maximum gradient of side slopes in the spoil storage areas should be 30-40 degrees to ensure safe storage of materials and reduce the overall erosion potential at the site. The top of the soil mound is to be profiled gently to facilitate surface water and therefore prevent ponding and saturation of the soil. All stockpiling will be temporary and subject to receipt of planning permission for this application, specific site locations for stockpiling will be determined by the appointed site engineer and will form part of a Construction Management Plan for the entire development. Drainage channels at the uphill side will intercept clean water runoff and will be directed away from the spoil storage areas to prevent sedimentation. Runoff from the storage areas will pass through a sediment basin to ensure suspended particles are settled out. The vegetated top soil layer (300-500mm depth typically) removed from the surface will be side-cast where feasible and used to resurface ground adjacent to road edges, the turbine base and other disturbed areas to assist in the recovery vegetation. Re -seeding of the areas will also be carried out at this stage providing it is the appropriate time of year. Re-instatement will be carried out as soon as possible after excavation to ensure vegetation recovers without delay. This will ensure that, as well as restoring the natural environment, the erosion potential for the soil will be minimised thus reducing the risk of sediment entering watercourses. The majority of the excavated material (typically clay) underlying the topsoil will be brought to storage areas. At certain locations along the access road it may be possible to side cast this material adjacent to the road and place topsoil over it. The to psoil will be graded to reflect the surrounding landscape. The maximum depth of any side cast material will be 500mm. In an effort to reduce the storage time of excavated material, a sequential ('rolling') extraction restoration programme will be employed where feasible i.e. where topsoil and overburden from one location can be used for the restoration of the previous location. 3.11 Construction Traffic As with any construction development project, the transport of materials onto the site will give rise to increased traffic. It is considered that the proximity of the site to the regional route R691, RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 25 07/07/2025 (the primary access road to the site) will reduce the degree of traffic impact that would otherwise be associated with third class or minor roads. Public perception of the construction phase will be influenced primarily from the impact of traffic movements. The degree of traffic disturbance caused by the construction phase of a wind farm depends on the number of turbines (in this instance a single wind turbine), the associated civil engineering requirements and the length of the construction period. The traffic movements to be expected will involve: • Vehicles bringing concrete (for foundations) to the site; • Articulated vehicles bringing turbine components to the site; • Private vehicles of those employed on site for the construction phase; and • Cranes to erect the turbine. The largest number of traffic movements will be with the delivery of concrete to the site for construction of the turbine foundations. In order to assist with logistics for delivery of turbines the selection of final delivery times and routes will be subject to detailed consultation with the Planning Authority and the Garda Siochána. The site has good accessibility with close proximity to a National Road. This will greatly assist the logistics of delivering components on site, compared to more remote and inaccessible locations. Once the turbine is in operation, traffic movements to and from the sight will be very light, probably averaging one visit a week by a light commercial vehicle or car. The potential need to replace machine components may generate heavier commercial vehicle movements, but these are likely to be infrequent. Subject to receipt of planning permission of this application a detailed Traffic Management Plan will be completed and will form part of the Construction Management Plan. . RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 26 07/07/2025 4.0 RECEIVING ENVIRONMENT 4.1 Overview The project site is located in the townlands of Carney’s Island, approximately 1.7km to the east of Clones. The proposed turbine within a farmed landscape with improved agricultural grassland being the dominant land cover occurring at and surrounding the project. An area of recently felled conifer plantation occurs within the project site at the northern end of the turbine hardstand. The proposed grid connection route runs along the R183 and connects the proposed turbine location to the existing substation at Clones. 4.2 Designated Nature Conservation Areas The nearest European Site to the project site is the Kilroosky Lough Cluster SAC (Site Code: 001786), which is located approximately 1.5km to the northwest of the project site. There are no pathways connecting the project site to this SAC. The nearest SPA to the project site is the Slaibh Beagh SPA, located approximately 13km to the north/northeast of the project site. Lough Oughter and Associated Loughs SAC is located approximately 20km downstream of the project site. The Finn River drains into this SAC and as such there is a hydrological pathway connecting the project site to this SAC. Kilroosky Lough Cluster SAC is designated for it role in supporting the following Annex 1 habitat and Annex 2 species: Hard oligo-mesotrophic waters with benthic vegetation of Chara spp. [3140] Calcareous fens with Cladium mariscus and species of the Caricion davallianae [7210] Alkaline fens [7230] Austropotamobius pallipes (White-clawed Crayfish) [1092]. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 27 07/07/2025 Lough Oughter And Associated Loughs SAC is designated for it role in supporting the following Annex 1 habitat and Annex 2 species: Natural eutrophic lakes with Magnopotamion or Hydrocharition - type vegetation [3150] Bog woodland [91D0] Lutra lutra (Otter) [1355] Slieve Beagh SPA is designated for it role in supporting a breeding population of hen harrier. No NHAs occur in the wider area surrounding the project site. Kilroosky Lough Cluster SAC is also listed as a pNHA. The next nearest pNHA to the project site is the Lisabuck Lough pNHA. This pNHA is not connected to the project site via any pathways. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: July 2025 Document Issue: Final DEC Ltd. 28 07/07/2025 RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 29 03/09/2025 4.3 Terrestrial Habitats 4.3.1 HABITATS OCCURRING UNDER THE FOOTPRINT OF THE PROPOSED TURBINE & ASSOCIATED INFRASTRUCTURE The dominant habitat occurring within the footprint of the proposed turbine location is conifer plantation with remnant linear sections of cutover/degraded bog occurring along unplanted fire breaks. The Fossitt Level 3 habitats occurring at the turbine location and along the proposed access road are outlined in Table 4.1 below. A habitat map showing the extent and distribution of these habitats is presented as Figure 4.2. Table 4.1: Habitats Occurring Under and in the Immediate Vicinity the Footprint of the Proposed Wind Turbine Habitat Description Project Infrastructure Deposition Stream – Legarhill Stream The Legarhill Stream is representative of a first order depositing stream. It is a slow flowing glide stream flowing a path of low gradient through the project site. The stream displays signs of enrichment with abundant macrophytes, dominated by Apium nodiflorum occurring along the channel. Macroinvertebrate searches identified EPA Class C species, such as Gammurus and Class C caddis fly species as dominant. Owing to the moderate water quality status of the stream and the absence of suitable spawning and nursery habitat, the section of the stream occurring in the vicinity of the project site is of limited fisheries value. The proposed access track will corss the Legarhill Stream twice within the wind turbine site, with one existing crossing to be used and one new crossing to be provided via a piped culvert. Improved agricultural grassland (GA1) Improved agricultural grassland dominates the land cover to the east of the project along the section of the access track approaching the substation and surrounding the substation itself. This habitat is nutrient enriched and intensively managed for cattle grazing and silage. Species indicative of high nutrient conditions in the habitat were noted throughout the land holding. These species include an abundance of Lolium perenne, Holcus lanatus, Alopecurus pratensis, Ranunculus repens, R. acris, Trifolium repens, Trifolium pratense, Cirsium arvense, Cirsium vulgare and Urtica dioica. Stands of Juncus effusus occur within the improved agricultural grassland sward indicating the peaty and poor drained soils that underly this habitat. The proposed turbine hardstand, substation, access track to substation and the internal underground cables. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 30 03/09/2025 Habitat Description Project Infrastructure Overall, the improved agricultural grassland is species-poor and widespread on a local to national scale. This habitat plays a limited function in supporting wildlife although it does provide foraging and dispersal habitat for badgers and can support a lim ited range of invertebrates. Recently felled conifer plantation (WS5) This habitat consists of stand of commercially planted Sitka Spruce that have been recently felled for harvest. The ground flora within this habitat is representative of pioneering and ruderal species commonly associated with recently disturbed ground. No element of the project footprint occurs within this habitat. Hedgerow (WL1) Hedgerows (WL1) occur within the project site and form the boundary around agricultural fields. Hawthorn (Crataegus monogyna) is the dominant species. Gorse (Ulex europaeus) and bramble (Rubus fruticosus agg.) were also present. Occasional Ash (Fraxinus excelsior) was seen in hedgerows across the site. Along with Alnus glutinosa, Acer pseudoplatanus, Salix aurita and Salix cinerea. Approximately 125m of hedgerow occurs within the footprint of the project. Buildings and artificial surfaces (BL3) An existing access track runs through the redline boundary of the proposed wind turbine site and sections of this are used for the proposed access track. A former homestead now in ruin is located a short distance to the southeast of the proposed turbine location. Proposed access track. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final DEC Ltd. 31 03/09/2025 RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 32 03/09/2025 4.4 Fauna 4.4.1 NON-VOLANT MAMMALS 4.4.1.1 Otters Otters (Lutra lutra) and their holts and couches are protected under the EU Habitats Directive as well as under the Wildlife Act (as amended) 1976. Otters holts and couches are generally established along riverbanks and these mammals are rarely found far away from aquatic habitats. The Legarhill Stream was searched for field signs indicating the presence of otters. No field signs were recorded. The Legarhill Stream is considered to be of limited fisheries value and this in turn is likely to limit the reliance of otters on this watercourse for foraging. 4.4.1.2 Badgers Badgers (Meles meles) and their resting place i.e. setts, are protected under the Wildlife Act 1976 (as amended). Setts are generally found in woodland, scrub and along hedgerows in free draining areas where soil is dry and not subject to flooding. Mire habitats, such as bl anket bog and heaths, are generally considered to be unsuitable habitat for supporting badger setts due to the high moisture content associated with peat substrates. No signs of badgers were found during field surveys within and adjacent to the project site. 4.4.1.3 Irish Hare The Irish hare is found in many different habitats including unimproved, semi-improved and improved grassland, upland habitats such as heather-dominated heaths and bogs and in coastal habitats including sand-dunes. They also tend to occur on modified grassland habitats such as golf courses and airfields (Fairley, 2001; Dingerkus & Montgomery, 1997). The Irish hare is protected under Annex IV of the EU Habitats Directive and the Wildlife Act 1976 (as amended). No signs of Irish Hare were found during field surveys at and surrounding the project site. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 33 03/09/2025 4.4.1.4 Other Mammals There was no evidence recorded during field surveys suggesting the presence or otherwise of pine marten or red squirrels (Sciurus vulgaris) and the limited occurrence of woodland habitat surrounding the proposed development leaves these lands unsuitable for supporting red squirrels or pine marten. Other mammals that are likely to occur in the general area include fox (Vulpa vulpa), rabbit (Oryctolagus cuniculus), hedgehog (Erinaceus europaeus), wood mouse (Apodemus sylvaticus), brown rat (Rattus norvegicus), and pygmy shrew (Sorex minutus). Foxes are likely to hunt widely across the surrounding hinterland. 4.4.2 BATS NBDC & Batlas Records No records for bats species within the immediate vicinity (i.e. within the area of search as shown on Figure 2.1) of the proposed wind turbine location are held by the NBDC or the BCI Batlas. Habitat Classification A review of the bat landscapes published by Lundy et al. (2011) indicates that the proposed wind turbine site does not overlap with core areas for bats occurring in Ireland. The habitat suitability for all bats in the area surrounding the proposed turbine scores a rating of 33.22, indicating a medium-high sensitivity for bats. The landscape surrounding the proposed wind turbine site is comprised of open and exposed fields with a well established hedgerow network occurring at and in the surrounding landscape. High value foraging habitat for bats occur to the south of the proposed turbine location at Bishops Lough and at Altartate Lough and the surrounding wetland habitat. Bat Roost Inspection Survey The ruined structure to the southeast of the proposed turbine location is of low potential to support bats. The structure is now comprised of a remain gable wall and stone rubble along former side walls. Mature cedar and sycamore trees occur surrounding the ruin. These trees did not support preferred roost features for bats and are considered to be of low roost potential for bats. Bat Activity Survey RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 34 03/09/2025 The results of the bat activity monitoring completed at the proposed turbine location are detailed in Table 4.2 below. Approximately 72 hours of bat monitoring was completed at the proposed turbine location. The location of the monitoring point is shown on Figure 2.2 above. A minimum of four species of bats were recorded during monitoring. These include a Myotis species, Leisler's bat, Common pipistrelle and Soprano pipistrelle. Table 4.2: Results of Bat Activity Monitoring adjacent to the proposed turbine location Date MYOSPP NYCLEI PIPPIP PIPPYG PLEAUR Total/Night 20240501 0 148 116 435 0 699 20240502 0 305 63 265 0 633 20240503 0 327 287 176 0 790 20240504 0 160 208 149 0 517 20240505 3 267 420 198 0 888 20240506 0 106 246 106 0 458 20240507 0 209 140 74 0 423 20240508 0 206 232 22 0 460 20240509 0 1 17 2 0 20 Total/Species 3 1729 1729 1427 0 4888 A total of 4,888 bat passes were recorded in the vicinity of the proposed turbine location during monitoring. The dominant species recorded during monitoring was Common pipistrelle and Leisler's bat, followed by Soprano pipistrelle Myotis species were recorded at very low levels during the monitoring session whilst no activity for Nathusius pipistrelle or brown long-eared bat was recorded. There are varying methods to quantity bat activity recorded during automatic static monitoring. Matthews et al. (2016) provided an arbitrary threshold for levels of low, medium and high bat activity. Kepel (2011) used the bat passes recorded per hour as a metric against which activity levels can be assigned. The Mammal Society established EcoBat, an online database that compares bat activity recorded at a monitoring point against all other bat activity held by the database for the surrounding area. However the EcoBat application tool is currently unavailable for use to analyse bat data recorded during automatic monitoring sessions. As such the bat activity recorded on site has been categorised in line with the method described by Kepel (2011). Kepel (2011) assigned bat activity based on bat passes per hour as follows: RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 35 03/09/2025 Pipistrelle species and Leisler's bat: Low = <3.5 passes; Moderate = 3.6 – 6.5; High = >6.5 All Other Bat species: Low = <4.0 passes per hour; 4.1 to 10 passes per hour; high = >10 passes per hour. The overall median nightly bat activity levels, as per Kepel (2011) recorded for each taxa during the monitoring survey are provided in Table 4.3 below. As can be seen on Table 4.3 bat activity for Common pipistrelle was high, whilst activity for all other species was low. Table 4.3: Bat Activity Categorisation Species Median Bat Pass/Hour Activity Category Common pipistrelle 26 High Soprano pipistrelle 18.62 High Leisler's bat 25.75 High Myotis species 0 Low Brown long-eared bat 0 Low 4.4.3 BIRDS The project site is not an important area for sensitive bird species (i.e. species listed as Red and Amber on the Birds of Conservation Concern in Ireland) and has not been identified by BirdWatch Ireland as being located within a sensitive bird area for wind energy development. The BirdWatch Ireland Sensitivity Mapping for the surrounding area has identified it to be of low sensitivity for barn owl (sensitivity score of 14.8). Bird species recorded during bird surveys completed for the proposed turbine include Buzzard, Chaffinch, Robin, Wren, Gold crest, Linnet, Chiffchaff, Pied Wagtail, Great Tit, Mute Swan, Wood Pigeon, Great crested Grebe, Hooded Crow, Jackdaw, Grey Heron, Herring Gull and Mallard. 4.4.4 HERPETOFAUNA No frogs, Common Lizards nor Smooth Newt were observed during the site surveys. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 36 03/09/2025 4.4.5 INVERTEBRATES No previous records for rare, threatened or protected invertebrates have been recorded at or in the vicinity of the proposed development. No such invertebrate species were observed during field surveys. 4.5 Aquatic Fauna 4.5.1 FISH The water quality of the Legarhill Stream flowing through the project site is perturbed as a result of excessive nutrient inputs and limits the fisheries value of this river. The River Finn downstream is similarly affected by nutrient inputs. This river was formerly considered to be one of the best brown trout fisheries in Ulster, but chronic pollution over years destroyed this status. Previous IFI fisheries surveys along the River Finn have recorded a total of 9 fish species. Gudgeon was the most abundant species, followed by roach, brown trout, perch, pike, European eel, stone loach, three-spined stickleback, and juvenile lamprey. 5.0 SITE EVALUATION 5.1 Designated Conservation Areas The European Sites occurring in the wider surrounding area are of international importance (Rating A). 5.2 Habitats No rare or protected flora species were recorded during the current habitat surveys within or adjacent to the footprint of the proposed wind turbine site. The improved agricultural grassland and buildings and artificial surfaces occurring within the project site are considered to be of low value (Rating E). The hedgerows occurring within the project site are of local importance (higher value) (Rating D). The Legarhill Stream is local importance (higher value) (Rating D). RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 37 03/09/2025 5.3 Fauna 5.3.1 NON-VOLANT MAMMALS The lands occurring and in surrounding the proposed turbine and development footprint are not considered to play an important role in supporting significant populations of mammals. No evidence of non-volant mammals breeding or resting places were identified during field surveys and no field signs indicating the presence of protected non-volant mammals species were noted during the surveys. Based upon the findings of the field surveys the site is of low value (Rating E) for non-volant mammals. 5.3.2 BATS In line with Kepel’s approach to quantifying bat activity, very low levels of bat activity for all species was recorded at and in the vicinity of the proposed turbine location. The presence of Common pipistrelle, Soprano pipistrelle and Leisler's bat foraging at high levels surrounding the proposed turbine location is not unexpected. These species are widespread and commonly occurring throughout the country and are “commonly encountered during bat surveys” (NPWS, 2019). These species are also “very general in their habitat preference, foraging in woodland, riparian habitats and parkland, along linear features in farmland, and in towns and cities” (NPWS, 2019). The national population of these three species is increasing and no existing pressures or threats to the conservation status of this species at a national level have been identified. Overall the future prospects for this species in terms of range, population and habitat are ‘Good’ (NPWS, 2019). In light of the above, the absence of any roosting opportunities within the vicinity of the proposed turbine location and the high median levels of activity for these species recorded during monitoring the project site is considered to be representative of a site of local importance (higher value) (Rating D) for Common pipistrelle, Soprano pipistrelle and Leisler's bat. 5.3.3 AQUATIC FAUNA The Legarhill Stream is considered to be of limited fisheries value and is of Local importance (lower value) (Rating E) for aquatic fauna. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 38 03/09/2025 6.0 DO NOTHING IMPACT In the absence of the proposed development the available land-holding and the footprint of the proposed development will continue to be used for conifer plantation. 7.0 POTENTIAL IMPACTS OF THE DEVELOPMENT Potential impacts associated with the proposed development will arise during both the construction and operation phases. The installation of the wind turbine and associated infrastructure such as hard standing, access road and a grid connection route will result in direct and permanent habitat loss under the footprint of the development. A further temporary loss of habitat associated with areas for construction work will arise during the construction phase. However, with the employment of best practice construction methods, this will be limited and will be closely associated with the development footprint. Sections 7.1 and 7.2 describe the impacts associated with habitat loss, severance/fragmentation and disturbance that may arise during the construction and operation of the proposed development. It is anticipated that direct impacts associated with the loss of habitats will generally be restricted to the construction phase. 7.1 Construction Phase The activities associated with the construction phase that will have the potential to affect habitats and species include: • The excavation of soils and sub-soils at the turbine-base location and hardstand area • The upgrade and/or construction of an access road • The construction of a 20 KV substation • The construction of a cable duct from the turbine to the substation. • The operation of heavy plant and machinery • The management of excavated areas, excavated soil and construction materials stored onsite. 7.1.1 IMPACTS TO DESIGNATED NATURE CONSERVATION AREAS The Screening Report for Appropriate Assessment provided with this application examines the potential impact of the proposed development to European Sites (i.e. SAC and SPAs). No NHAs or pNHAs are connected to the project and there will be no potential for the project to result in impacts to such sites in the wider surrounding area. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 39 03/09/2025 7.1.2 CONSTRUCTION PHASE IMPACTS OF THE PROPOSED TURBINE TO HABITATS Direct habitat loss during the construction stage of the proposed development will be confined to areas occurring under the footprint of the turbine location, hardstand, access road, cable trenches and substation. Table 7.1 outlines the extent of habitat loss for each habitat occurring within the available land-holding, along with the elements of the development that will result in habitat loss and the significance of the impacts of such habitat loss. Other potential indirect impacts to habitats within and surrounding the proposed site are outlined in Table 7.2. Note that specific details with regard to impact to the Lough Oughter And Associated Loughs SAC and overlapping conservation areas are provided in the Screening Report for Appropriate Assessment. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 40 03/09/2025 Table 7.1: Direct Habitat Loss resulting from the Infrastructural Elements of the Proposed Development Habitats Element or Wind Farm Infrastructure Feature Responsible for Habitat Loss Approximate Area of Habitat Loss (m²) to the Proposed Development Site Significance of Habitat Loss Improved agricultural grassland Turbine Base; Hard- stand; Access track; Substation; Cable trenches 12000 The project will result in the loss of approximately 12000m2 of improved agricultural grassland. This represents a negligible fraction of the area of improved agricultural grassland occurring in the surrounding area (i.e. <1% of the area of improved agricultural grassland). Furthermore the improved agricultural grassland to be lost to the footprint are representative of habitat of Local importance (lower value) (Rating E). The loss of a negligible area of improved agricultural grassland to the proposed development footprint will represent a negligible magnitude impact. A negligible magnitude impact to this habitat of local ecological value (Rating E) will result in an impact of imperceptible significance. Buildings and artificial surfaces Access track 157 A discrete area of existing buildings and artificial surfaces occurs under the footprint of the project. The project will result in the retention of this habitat type at the location and as such will be representative of a neutral effect. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 41 03/09/2025 Hedgerow Site Entrance Sight Lines 125m Approximately 125m of hedgerow will be removed to provide site access site and the proposed turbine hardstand. The removal of a discrete area of hedgerow, which is of local value, will represent and impact of low magnitude and a an effect of minor significance. Hedgerow Bat Buffer mitigation measures 215m As part of the mitigation measures for bats a buffer will be implemented around the proposed turbine that will require the removal of all hedgerow habitat within the buffer. The buffer will extend for 91 m around the turbine hub. This will amount to circa 240 of hedgerow habitat within the buffer area that will be required to be removed. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 42 03/09/2025 Table 7.2: Significance of Indirect Impacts to Habitats Arising from the Different Elements of the Proposed Development Element Details Potential Impact Receptors Affected Value Potential Significance of Impact without mitigation Access track and construction vehicle movements During the initial stages of the construction phase vehicles will have to cross over grassland and peatland habitats Removal of surface vegetation, till and peatland overburden along access roads. Slippage of materials to drainage ditches and conveyance downstream to watercourses. Drainage ditch and Legarhill Stream and River Finn downstream and associated aquatic fauna D Short to long-term; minor to moderate negative impacts RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 43 03/09/2025 Element Details Potential Impact Receptors Affected Value Potential Significance of Impact without mitigation Minor disturbance impacts to fauna occurring in the vicinity of the access road and cable trench. Fauna E, D; Minor, temporary negative impact RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 44 03/09/2025 Element Details Potential Impact Receptors Affected Value Potential Significance of Impact without mitigation Excavations and the installation of a turbine foundation, access track foundation, hardstand and a substation foundation. Excavations will be undertaken at the turbine base. Foundations for the turbine have to be founded on rockhead, which requires the excavation of peat soils and mineral soils where present. Once Sediment pollution and associated hydrological impacts to surface watercourses. It is noted that standard best practice measures will be implemented during the construction phase of the project and with such measures in place the potential for the loss of suspended solids to receiving watercourses will be low and not significant. Legarhill Stream and River Finn and aquatic fauna D Short to long-term; minor to moderate negative impacts RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 45 03/09/2025 Element Details Potential Impact Receptors Affected Value Potential Significance of Impact without mitigation excavation is complete, the turbine is generally secured by a piled or rock anchored platform. While reinstatement of vegetation post construction will reduce the area of hard standing to that occupied by the turbine platform, the area of ground required for base excavation will include an area for crane hard-stand. Oil and chemical contamination of surface waterbodies from machinery and materials associated with excavations and the installation of the turbine foundation. The discharge of such contaminants to surface waterbodies will have the potential to negatively affect water quality and protected fauna associated with the waterbodies downstream of the proposed site. It is noted that standard best practice measures will be implemented during the construction phase of the project and with such measures in place the potential for the loss of such materials to receiving watercourses will be low and not significant. Legarhill Stream and River Finn and aquatic fauna D Short to long-term; minor to moderate negative impacts RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 46 03/09/2025 Element Details Potential Impact Receptors Affected Value Potential Significance of Impact without mitigation Minor disturbance impacts to fauna occurring in the vicinity of the turbines and hardstand location. Fauna E, D; Minor, temporary negative impact RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 47 03/09/2025 Element Details Potential Impact Receptors Affected Value Potential Significance of Impact without mitigation Site Access road and Cable Trenches A site access track is necessary to access the turbine location as well as the substation and control building. The access road is also required during construction, turbine delivery and for ongoing operation and maintenance of the wind farm. A cable trench will also be developed and incorporate excavation work. Limited potential for indirect impacts given the absence of watercourses in the vicinity of these habitats. Fauna E, D; Minor, temporary negative impact RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 48 03/09/2025 7.1.3 CONSTRUCTION PHASE IMPACTS TO FAUNA Potential negative impacts to otters and aquatic fauna of the Legarhill Stream and River Finn have been considered in Table 7.2 above. 7.1.3.1 Badgers No breeding sites or resting places of protected terrestrial non-volant mammals such as badgers were noted within or immediately adjacent to the project site. As such the construction phase of the project will not have the potential to result in significan t disturbance to non-volant terrestrial mammals. 7.1.3.2 Bats The construction phase of the proposed development will not result in the loss of, or disturbance to any structures with the potential to support roosting bats. No trees with potential to support roosting bats will be felled as a result of the construction phase. The proposed wind turbine development will result in the loss of discrete areas of hedgerow that will be negligible in the context of the mapped area and wider surrounding area of such habitats. As such the project will not result in a perceptible change to the availability of potential bat foraging habitat. Therefore, the potential for negative impacts to bat species as a result of the loss of these habitats or disturbance during the construction phase is considered to be negligible to minor and insignificant. 7.1.3.3 Birds Habitat Loss The construction phase will result in the loss of minor section of hedgerow that could be used by birds for nesting. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 49 03/09/2025 No sensitive species were identified as occurring at or in the vicinity of the project footprint and the loss of minor area of hedgerow habitat will represent an impact of very low significance for bird species. Areas of higher value habitat for birds in the surrounding locality such as at Bishops Lough and Altartate Lough and the surrounding wetland will not be affected by the project. In terms of impacts to other passerine species, it is noted that these species are typically short- lived with high reproduction rates and are not generally considered to be sensitive to construction effects (Langston et al., 2012). However, the absence of appropriate mitigation measures and consideration of birds during the breeding season, construction works could result in disturbance to breeding territories of other bird species that may use scrub habitat within the footprint of the proposed development. Potential impacts include disturbance to nest and injury to eggs and chicks and the loss of nesting and foraging habitat. 7.1.3.4 Aquatic Fauna Earthworks associated with the construction phase of the project will necessitate the denuding of surfaces. In the absence of appropriate mitigation measures such activities will have the potential to generate silt-laden runoff from the works area and for this runoff to be discharged via existing preferential surface water flow pathways and drainage channels crossed by the project. As part of the project one new crossing of the Legarhill Stream will be required. During the construction phase standard best practice measures will be implemented on site to eliminate the loss of contaminated surface water from construction areas to the surrounding aquatic environment. This in turn will minimise the potential for the project to result in negative effects to aquatic fauna. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 50 03/09/2025 7.2 Operational Phase 7.2.1 IMPACTS TO DESIGNATED NATURE CONSERVATION AREAS DURING THE OPERATION PHASE Refer to the Screening Report for Appropriate Assessment for an examination of potential impacts to designated nature conservation areas. 7.2.2 OPERATION PHASE IMPACTS TO HABITATS The operation phase of the proposed development will not cause additional significant or adverse direct impacts to the quality or functionality of the habitats occurring within the proposed development area. 7.2.3 OPERATION PHASE IMPACTS TO TERRESTRIAL FAUNA 7.2.3.1 Non-volant Mammals No effects to protected non-volant mammals are predicted during the operation phase of the proposed wind farm. As no field signs indicating the presence of such species were noted within or adjacent to the proposed development footprint during field surveys and due to the limited human presence for maintenance works during daylight hours, outside the period of peak badger activity, no significant effects are predicted to affect badgers during the operation of the proposed wind farm. 7.2.3.2 Bats Potential effects to the local bat population include the following: • Effects on bat roosts • Direct habitat loss • Displacement and barrier effects • Fatalities resulting from collision and barotraumas RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 51 03/09/2025 Effects on Bat Roosts No structures with potential to function as bat roosts occur within 200m of the turbine location. No trees with potential to support bat roosts occur within a 200m radius of the turbine location. Due to the absence of a potential roosting opportunities in the vicinity of the proposed turbine location, there will be no direct or indirect impacts to bat roosts. Direct Habitat Loss As outlined in Section 7.1.3.2 the potential for negative impacts to bat species as a result of the loss of these habitats or disturbance during the construction phase is considered to be negligible to minor and insignificant. Displacement & Disruption of Foraging Sites The potential for displacement of bats from foraging habitats due to their avoidance of wind turbines is still poorly understood and is likely to result in species-specific behavioural responses. A number of studies have shown that bats avoid foraging in areas in the immediate vicinity of turbines (Bach 2002). Other studies have shown that pipistrelle species become habituated to the presence of turbines and are in general not displaced from foraging habitats located adjacent to wind turbines (Bach & Rahmael, 2004). In light of the presence of suitable bat habitat in the wider area surrounding the proposed turbine, the potential for the turbine to result in displacement/disruption to bat foraging is predicted to represent an impact of low magnitude and minor significance for the local bat populations occurring in the wider surrounding area. Potential Bat Fatalities Research in Europe, Australia and North America has shown that the operation of wind turbines can resulted in bat fatalities. The research suggests that peak casualties occur during migration (Kunz et al. 2007; Rodrigues et al., 2008) and within extensive forested areas (Brinkmann & Schauer-Weisshahn, 2006). Fatalities at wind farm sites can result from collision with the turbine and turbine blades and barotraumas (i.e. damage to lungs caused by rapid or excessive pressure changes in the vortices of moving turbine blades). Baerwald et al. (2008) suggested RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 52 03/09/2025 that barotrauma may be the overriding cause of bat mortality at wind farm sites. More recent research has questioned this contention with Grodsky et al (2011) concluding that bat fatalities at wind turbine sites are not exclusively or predominantly a result of barotrauma, but a combination of both barotrauma and direct collision. More recently the results of forensic pathology examination of bat corpses at wind farm sites by Rollins et al (2012) goes further in questioning the predominance of barotrauma at wind farm sites. This research “strongly suggests that traumatic injury, due to collision, is the major cause of bat mortality at wind farms and, at best barotrauma is a minor etiology”. With continued research, the understanding of bat fatalities at wind farm site is evolving. While it is widely acknowledged that there is a lack of evidence with regard to collision/mortality at operational wind turbines in Britain and Ireland, it is considered likely that such risks exist due to the presence of the same species that have been shown to experience fatalities at wind farm sites in Europe. In addition to the absence of such evidence, no specific interim guidance is available in Ireland to support the assessment of wind turbine impacts to bats. Due to the lack of national guidance this report refers to Scottish Natural Heritage (SNH, 2019), Natural England’s Technical Information Notes (TIN) 051 and 059 and other recent developments in the research of potential risks posed by operational wind turbines to bats. The NE TIN 059 guidance document facilitates an assessment of the potential impacts of a single wind turbine to bats by identifying: • The sensitivity of individual bats of different species to mortality based on flight characteristics and habitat preference etc. and • The degree of risk to bat populations base on the relative size of the populations of each species. The Natural England TINs provide recommendations for avoiding impacts to foraging bats. This guidance recommends that a 50m buffer should be established between the rotor swept area of the turbine and the nearest vegetation corridor. The application of a 50m buffer is considered to minimise potential impacts to bats. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 53 03/09/2025 Further risk assessment guidance has also been provided by the Bat Conservation Trust (BCT) in their guidance document Bat Surveys: Good Practice Guidelines (2012 & 2016). This guidance sets out a number of factors (see Table 30.1 of the BCT 2012 guidelines) which aim to establish the potential risk to bat species based on the features associated with a proposed site and proposed scheme. With reference to both Table 30.1 of the BCT guidelines and the assessment criteria outlined in the NE TIN 051 Guidelines, the criteria used to establish the fatality risk posed by the proposed turbine to bat species are as follows: • Habitat quality surrounding the proposed development • Presence of bat roosts that may be affected by the proposed development • Habitat loss and/or displacement; • Levels of bat activity recorded; and • Sensitivity of species at the individual and population level to wind turbines Habitat Quality Surrounding the Proposed Development High value bat foraging habitat in the form of hedgerow occur in the vicinity of the proposed turbine location and the wider surrounding area. High value habitat occurs to the south of the proposed turbine location at lake and wetland habitats. The clearance of this vegetation will not significantly alter the habitat quality of foraging bats in the surrounding area. The Natural England guideline for a minimum buffer distance of 50m from the rotor swept area to the nearest example of structured habitat will be implemented as part of the proposed development and this buffer will decrease the risk to bat species. Presence of Bat Roosts that may be Affected by the Proposed Development See Section title ‘Effects of Bat Roosts’ in the early paragraphs of 7.2.3.1 above. Habitat Loss And/Or Displacement See Section titled ‘Displacement & Disruption of Foraging Sites’ above. Levels of Bat Activity Recorded RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 54 03/09/2025 High levels of bat activity have been recorded for Common pipistrelle, Soprano pipistrelle and Leisler's bat at the proposed turbine location. Sensitivity of Bat Species to Wind Turbines The sensitivity of each of these species to turbines is outlined in the SNH Guidance document (2019). Table 7.3 outlines the sensitivity of bats at the individual species level to wind turbines (Source: SNH, 2019). Table 7.3: Species Likely to be at Risk from Wind Turbines Low Risk Medium Risk High Risk Myotis species Leisler’s bat Long-eared bats Nathusius pipistrelle Horseshoe bats Common pipistrelle Soprano pipistrelle Pipistrelles Common, Soprano pipistrelle and Leisler's bat have been classified by the SNH Guidance document as a species at high risk of turbine collision. Based on the assessment of habitats occurring in the vicinity of the proposed turbine and the high levels of activity recorded for Common pipistrelle, Soprano pipistrelle and Leisler's bat at the proposed turbine location, there is, in the absence of appropriate mitigation measures, for this species to interact with the proposed turbine. However the implementation of the recommended 50m buffer distance between the rotor swept area and the nearest structured vegetation will ensure that the probability of interactions will be reduced to a low risk. A low probability of interaction will limit the risk of fatality to individual pipistrelles to a low risk level. Considering the status of these species within the wider geographical context it is unlikely that the turbine will have the potential to negatively affect these species at a local/county/regional/national level. Myotis species, Lesser Horseshoe Bats & Brown Long-eared Bats Myotis species, lesser horseshoe bats and Brown long-eared bat species have been classified by the SNH guidance as species at low risk of turbine impacts. Based on the fidelity of these RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 55 03/09/2025 species to vegetated corridors and woodland edge and their low risk classification; the absence of such habitat features at and immediately surrounding the proposed turbine location; the very low to near absent levels of Myotis species bat activity recorded during monitoring at the proposed turbine location; and the absence of lesser horseshoe bats and brown long-eared bat during monitoring, it is considered that the probability of these species interacting with the proposed turbine will be low. The implementation of the recommended 50m buffer distance between the rotor swept area and the nearest vegetated feature will also ensure that the probability of interactions remains low. A low probability of interaction will limit the risk of fatality to individual Myotis species and Brown long-eared bats to a low risk level. Summary of Potential Risk to Bat Species Tables 7.4 to 7.5 provide a summary of the potential risks posed by the proposed wind turbine to bat species. Each table summarises the risks to bats by presenting the results of each criteria used during the impact assessment. An overall risk is then derived from the results of each of these criteria. Table 7.4: Overall Risk to Pipistrelle Species & Leisler's bat Risk Assessment Criteria Result Habitat Quality High Bat Roosts Low Habitat Loss and/or Displacement Low Sensitivity Low Activity level High Overall Individual Risk Moderate Overall Population Risk Low Table 7.5: Overall Risk to Myotis & Brown Long-eared Bats Risk Assessment Criteria Result Habitat Quality High Bat Roosts Low RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 56 03/09/2025 Habitat Loss and/or displacement Low Sensitivity at Individual level Low Sensitivity at Population level Low Activity level Low Overall Individual Risk Low Overall Population Risk Low 7.2.3.3 Birds Operating wind farms have the potential to affect birds through: • Reduction in habitat extent as a result of displacement • Collision with wind turbines Collision can result in the direct mortality or lethal injury of birds and can result not only from collisions with wind turbine blades but also with other structures associated within wind turbines such as towers, nacelles etc. Collision risk can be influenced by topography and weather, particularly during periods of poor visibility i.e. fog. Other factors influencing collision risk include species-specific flight behaviour and morphology (de Lucas et al, 2008). With the exception of notable examples such as Altamont Pass (California), the majority of studies assessing collision caused by wind farms have recorded relatively low levels of mortality. However, this may be a reflection of the fact that many wind farms are located away from large concentrations of birds. Percival (2003) suggested that wind farms in Ireland are most likely to have serious negative impact to birds where high densities of seabirds, wintering wildfowl or breeding raptors occur. The proposed turbine location was not found to be relied upon by target species during baseline surveys with very low levels of flight activity recorded in the vicinity of the proposed turbine for those target species recorded i.e. Buzzard, Heron, Herring Gull. Research (e.g. Vauk, 1990, Phillips 1994, Percival 2000 & 2005, Devereux et al. 2008, Pearce- Higgins et al. 2012) suggests that most birds are only slightly affected as a result of displacement by the presence of operational wind turbines. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 57 03/09/2025 Corvids and passerines represent the most common and abundant group of species occurring within the vicinity of the proposed turbine. Previous studies have shown that breeding passerines are not significantly disturbed by turbines. For instance Thomas (199 9) studied the effects of 10 wind farms in England and Wales on a range of bird species and observed no significant disturbance to breeding passerines (Thomas, 1999). Ketzenberg et al. (2002) also showed no effects on number or spatial distribution of skylark within 1km of a wind farm and noted that some species of waders were more abundant in the vicinity of wind turbines when compared to pre-installation due to changes in land management. This study also highlights the potential for habitat quality to outweigh potential negative displacement effects associated with turbines. Other studies from Spain have shown that passerine numbers are not negatively affected following wind farm construction (De Lucas et al. 2005) and further evidence comes from a study of winter farmland birds at two wind farm sites in East Anglia (Devereux et al. 2008). This study looked at four functional groups (seed-eaters, corvids, gamebirds and larks) and quantified distribution in five 150m distance bands from turbines (0-150m to 600-750m) as well as examining the closest distance band in more detail to see if there was a difference in distribution between 0- 75m and 75-150m from turbines. The authors found no evidence to suggest that the distribution of wintering farmland birds (with the single exception of pheasant) was affected by wind turbines. Scottish Natural Heritage (SNH) also recognizes the low risk posed by wind turbines to passerines in the guidance document Bird Survey Methods for Assessing Impact of Onshore Wind Farms on Birds (2005 & 2014). The proposed turbine location is situated in an area that is at a remote distance from any important bird area, the nearest being the Slieve Beagh SPA, located approximately 13km to the north/northeast of the project site. Considering the above it is considered likely that the proposed wind turbine will result in a displacement/disturbance effects of low significant to birds. Common resident passerines occurring in the landholding area are not considered to be at risk of collision with the operating wind farm as their flight heights are generally well below the lowest point of a rotating turbine blade. The risk of collision is assessed as being of negligible magnitude and negligible significance. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 58 03/09/2025 The likely grid connection route for the project will connect into the Glencoole 38kV power station at New Birmingham to the north, northwest of the project site. This grid connection route will be an overhead cable line comprised of a 20kV electricity cable. 7.2.3.4 Operation Phase Impacts to Aquatic Fauna Given the separation distance between the proposed turbine hardstand and the Legarhill Stream the operation phase of the turbine will no pose a risk of contaminated surface water runoff to the Legarhill Stream. 8.0 MITIGIATION MEASURES 8.1 Construction Phase Mitigation 8.1.1 MITIGATION BY AVOIDANCE The design of the project has sought to avoid significant negative effects to habitats by minimising the extent of loss of habitats to the footprint of the proposed development and siting the infrastructure elements of the proposed development in habitats of low nature conservation value. The positioning of the turbine to the west of the landholding within an area of industrial cutover bog has minimised the potential for habitat loss as well as disturbance to adjacent habitats and fauna occurring in the landholding. 8.1.2 MITIGATION BY REDUCTION Habitat disturbance during construction work will be confined strictly to within the direct land - take of the proposed wind turbine and associated infrastructure, in accordance with the outlined mitigation measures. A project ecologist will be appointed for the construction phase and the project ecologist will meet with the contractor on site to identify and mark out the required work area. The construction footprint will be kept to a minimum and an impermeable barrier will be installed around the construction area for the turbine base to ensure no surface runoff to surface RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 59 03/09/2025 watercourses. The area of vegetation removal will be kept to a minimum to reduce the exposure of bare soil and peat and the risk of sediment runoff and peat desiccation. An approximate 125m of hedgerow habitat will be removed in order to provide for the proposed turbine hardstand and the access track. An additional 215m of hedgerow habitat will be removed as part of the bat buffer mitigation measure. The loss of this hedgerow habitat will be compensated for by providing a broadleaved hedgerow along the length of the access track from the site entrance to the substation. This will provide for new replacement hedgerow habitat either side of sections of the access track that will at minimum exceed the 340m plus 100% (i.e. the provision of a minimum length of 680m of replacement hedgerow habitat. This will result in a net increase in the extent of this habitat occurring at and in the vicinity of the project site. It is noted that all new replacement hedgerow will be positioned outside the 50m bat buffer of the rotor swept area of the turbine. 8.1.2.1 Water Quality & Aquatic Fauna 8.1.3 CONSTRUCTION AND DECOMMISSIONING PHASE MITIGATION • All site personnel will be made aware of their environmental responsibilities at the site. • Requirements for contractors will include contingency plans to deal with spillages, should they occur. • Land disturbance will be kept to minimum and disturbed areas will be stabilised as soon as possible. • Soil/peat excavation should be undertaken during dry periods whenever possible. • Site visits by a Design Engineer will be agreed in advance and will be undertaken at various stages of the construction process to ensure that the proposed SuDS scheme is being constructed in line with the design. • An Environmental Manager will also be appointed who will have responsibility for ensuring attenuation measures are appropriately maintained. Commented [PD1]: Note recommended extent of replacement – reduce if this amount is not achievable. Note the replacement should at a minimum = to replacement + 10% RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 60 03/09/2025 A minimum 10m construction phase pollution prevention buffer zone (setback) will be applied to the watercourses that flow through (and adjacent to) the project. This will be applied at all location except where the proposed access track will cross the Legarhill Stream. Impositions placed on lands within the buffer zone include no unnecessary construction activities that have the potential to release pollutants such as re-fuelling activities, plant maintenance, spoil heaps, materials/fuels/lubricants storage. The following will therefore apply to the area within the buffer zone: • No stripping/removal of vegetation; • No spoil deposition or stockpiling of excavated material; and • No storage or use of chemicals, fuels, or other lubricants. Buffer zones described above comply with (or exceed) published guidance for works in comparable circumstances. 8.1.4 SITE DRAINAGE Site drainage will be implemented as per the details set out in Section 3.7 above. The implementation of this drainage design will eliminate the risk of pollution to the Legarhill Stream and the surrounding surface water environment during the construction phase of the project. 8.1.5 WORK TO INSTALL CULVERTS CROSSING OF THE LEGARHILL STREAM Work will be cogniscant of weather conditions and planned to coincide with periods of dry channels or low flows. while works in the water are “live”, if conditions require then the channel will be dammed at a point upstream of the work and overpumped downstream of the work. Permanent culverts and the single drainage channel diversion shall be constructed from downstream to upstream to ensure a dry working environment. Upon completion of culvert installation, water shall be permitted to pass from the upstream extent of the existing watercourse through the culvert. Downstream in-channel filtration check dams shall be installed and renewed as necessary in order to trap sediment until any residual washout of sediment from RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 61 03/09/2025 the exposed excavation has stabilised to a normal (pre-construction) level. Temporary scour protection measures will be placed at and downstream of any pumped outlet. Geotextile silt fences shall be installed adjacent to the live watercourses in order to filter contaminated runoff that may be caused by plant movement associated with the diversion. If conditions require, in-channel geotextile check dams will also be installed within the channel downstream of the works. After completion, any temporary scour protection or silt barriers will be removed 8.1.6 CONCRETE, CEMENT & GROUT Concrete, cement and grout are highly alkaline and corrosive and can have a detrimental impact on watercourses. To minimise any impact: • A “record of assessment for low-risk concrete washout discharges” will be completed to assess the risk to receptors based upon site location and volume of concrete washout that will be generated; • Concrete lorries will wash down in designated areas e.g. lined with an impermeable sheet to prevent ground contamination; and, • Any concrete or cement mixing will be sited on an impermeable area, at least 10 m away from a watercourse or surface water drain. 8.1.7 SILT MANAGEMENT • Water containing silt, or any other contaminating material will not be released directly to a watercourse or surface water drain. Silty run-off will be routed either overland or to a suitably designed and sited settlement pond/filter channel. The settlement pond will be inspected daily; • Any temporary stockpiling of materials will be prevented from eroding by rainwater or surface water run-off; and, • Effluent from wheel washers (if required) and plant washing facilities will be contained for proper treatment and disposal. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 62 03/09/2025 8.1.8 DEWATERING / PUMPING AND OVER PUMPING • Excavations that cannot be drained via gravity will require dewatering and pumping out of collected rainwater and/or groundwater during construction. All de-watering will be passed through suitable treatment such as a settlement pond or a mechanical settlement unit for settling suspended materials. • Water from excavations will not be pumped directly to watercourses. Where there is a requirement for over pumping, pumped discharge will be via erosion protection and over suitable vegetation outside of the buffer zone prior to re-entry to the watercourse. 8.1.9 POLLUTION PREVENTION MEASURES The primary source of potentially contributing pollution will be from vehicle, plant and equipment accessing and exiting the site. To prevent pollution of the downstream watercourses (which flow into the designated Dalgan River section of the Lough Corrib SAC), the following measures will be employed: • All work will be carried out in line with GPP 5 “Works and maintenance in or near water” in order to ensure best practice with regard to the protection of water quality; • Concrete lorries will wash down in designated areas e.g. lined with an impermeable sheet to prevent ground contamination; • Any concrete or cement mixing will be sited on an impermeable area, at least 10 m away from a watercourse or surface water drain; • Construction plant will be operated in accordance with the manufacturer’s written recommendations; • Vehicle, plant and equipment maintenance records will be kept on site and these will be made available to the employer’s representative upon request; • Plant to be refuelled in a designated area, on an impermeable base away from drains or watercourses; • Integrally bunded mobile fuel bowsers are to be used; • Drip trays are to be installed under static plant; • A spill kit with sand, earth or commercial products for containment of spillages is to be present during the installation of the headwalls; RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 63 03/09/2025 • Incident response training to be provided to staff and contractors in the event of a spillage; and • Liaison with EPA and OPW to take place prior to the commencement of works. 8.1.10 STORAGE OF HAZARDOUS MATERIAL The Pollution Prevention Guidelines: - GPP26 Safe storage of Drums and Intermediate Bulk Containers (IBCs) will be complied with on this project. COSHH Risk Assessments will be completed for all hazardous chemicals brought onto site. Flammable liquids e.g. petrol, paints and solvents will be stored in secure stores clearly marked with appropriate warning signs. Storage for hazardous substances will be as per the suppliers’ recommendations and will be sited away from sensitive areas of the site. Additionally, the storage area will provide containment in the event of a spillage. 8.1.11 OIL STORAGE & REFUELLING Oil is one of the most common pollutants. Spilt oil can pollute streams, rivers and groundwater supplies which can be used for drinking water. Types of oil to be potentially found on site include: • Petrol; • Diesel; • Lubricating and hydraulic oils; • Synthetic and mineral oils; • Biodegradable and; • Waste oils. Oil will be stored in dedicated areas in the temporary construction compound. These areas will be specifically designed and constructed to be safe and secure. All reasonable measures will be put in place to secure fuel tanks from vandalism. In all cases, storing oil in high-risk locations such as the following, will be avoided: • Where there is a risk of damage by impact or collision e.g. from site traffic; RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 64 03/09/2025 • Within 50 m of a spring, well or borehole; • Within 10 m of a watercourse, ditch or drainage channel; and, • Where spilt oil could enter open drains or soak into unmade ground where it can pollute groundwater. If storing more than 200 litres of oil, a secondary containment system shall be provided. The capacity of the secondary containment system will be either 110% of the largest drum or 25% of the total volume stored (whichever is greater). Additionally, all ancillary equipment will be kept contained within the bund. Any open oil storage areas will be covered in order to prevent rainwater collecting. All oil storage areas, containers and secondary containers will be frequently inspected and checked for signs of damage, corrosion, bulging, leaks or unauthorised use and interference. Any required maintenance, defects or faults will be repaired immediately. A designated refuelling area will be established for the project. This area will consist of an impermeable surface, situated well away from any watercourse. Signage will be erected to indicate the location of the refuelling area and an oil spill kit will also be at hand at this area. All fuel deliveries to site will be supervised by a designated individual. A drip tray, or other secondary containment solution, will be used during refuelling, to prevent oil from spilling onto the ground. Where mobile fuelling is necessary, all bowsers will carry an emergency spill kit. All oil containers (including mobile browsers) will be returned to the designated storage area after use. A dedicated person will be appointed and trained for the purpose of refuelling on site. An ‘appointed persons poster’ will be completed and displayed on site. The operative will also be trained in the use of spill kits. In the absence of the primary appointed person for fuelling, refuelling duties will be delegated to secondary appointed persons. These persons will be trained in the storage and use of fuel and oils. They will also have been trained in the use of spill kits. Refuelling must be carried out by a trained operative. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 65 03/09/2025 8.1.12 SITE COMPOUND The temporary construction and decommissioning phase site compounds will be installed over an impermeable barrier. Either existing areas of concrete apron that occur adjacent to the proposed development footprint will be used or else the foundation of alternative area will be lined with an impermeable membrane prior to the installation of the site compound. This will ensure that surface water draining from the site compound is prevented from draining to ground. Surface water arising from the site compound will be directed to perimeter drains which will bound the compound. The perimeter drains will be fitted with regularly spaced check dams in the form of straw bales and/or stone filter dams. The perimeter drain will convey surface water runoff to a buffered outfall that will discharge waters over peat vegetation. The existing peat overburden along with the prior treatment along the drains will provide for effective treatment of the surface water runoff prior to draining to ground. The site compound will be used to store potentially polluting materials. All potentially polluting materials such as hydrocarbons, oils and other chemical solutions required for the construction phase will be stored in a securely bunded containers within a bunded area. Cement and cement-based products will also be stored in a securely bunded area. 8.1.13 MEASURES TO PREVENT THE SPREAD OF NON-NATIVE INVASIVE PLANT SPECIES 8.1.13.1 Best Practice & Biosecurity The following additional measures will be implemented as standard best practice approach to construction works on site. These measures will be put in place with the aim of avoiding the introduction of other non-native invasive plant species during the construction and decommissioning phase of the project. The potential for importation or introduction of non- native plant species (such as Japanese Knotweed, Himalayan Balsam, etc.) can arise during construction works on development sites. Section 49 of the European Communities (Birds and RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 66 03/09/2025 Natural Habitats) Regulations 2011 prohibits the introduction and dispersal of invasive alien species (particularly plant species) listed on Part 1 (third column) of the ‘Third Schedule’. All construction at the project site will have due regard to the relevant biosecurity measures outlined below: • All plant machinery will be restricted from disturbing known colonies of invasive species. • All plant machinery will avoid unnecessary crossings to adjoining lands. Good site hygiene will be employed to prevent the introduction and spread of problematic invasive alien plant species (i.e. Japanese Knotweed (Lesser Knotweed), Himalayan Balsam (Impatiens glandulifera), Himalayan Knotweed (Persicaria wallichii), etc.) by thoroughly inspecting and washing vehicles prior to entering the works area. The biosecurity measures outlined above are in line with best practice guidelines issued by the National Roads Authority (NRA, 2010) – The Management of Noxious Weeds and Non-native Invasive Plant Species on National Roads and broadly based on the Environm ent Agency’s (2013) – The Knotweed Code of Practice: Managing Japanese Knotweed on Development Sites (Version 3, amended in 2013, accessed on the Environment Agency’s website on the 11th of July 2016). In addition to the above, measures for the prevention and spread of Crayfish plague, as detailed under SI 354/2018, the European Union (Invasive Alien Species) (Freshwater Crayfish) Regulations 2018 will be adhered with throughout all construction works and a ctivities. With regard to such measures the simplest is to implement routine cleaning and drying of equipment once leaving a river, and before using it again. This is especially important as it is known that the crayfish plague organism can be carried on wet equipment to new sites. The ‘Check, Clean and Dry’ protocol is an effective barrier. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 67 03/09/2025 8.1.14 MITIGATION MEASURES FOR SPOIL DISPOSAL Spoil will be generated during excavations for foundations at turbines and along new access roads. Minimisation of the production of this spoil will be treated as a high priority, but it is nevertheless expected that peat will be excavated during site works. Spoil types will be treated separately. Glacial soils and peat will be separated during excavation and these two types of spoil will be disposed of generally as follows: A Glacial soils will be deposited directly on top of other glacial soils. This will require the removal of peat where present to facilitate the process. B Peat can be disposed of either on top of glacial soils, on top of inactive peat or on top of the “Acrotelm” where the “Top Mat” has been removed. 1. Glacial spoil disposal will take place within a 100m radius of each structure. 2. It is intended that spoil movements will be minimised by disposing of the material within or immediately adjacent to the construction footprint of the structure from whence it was excavated. 3. Preparation of the Spoil Disposal site will involve the removal of the “Top Mat” which will be transplanted to an area of inactive bog and maintained for re-use during restoration operations. 4. Spoil will be deposited, in layers of 0.50m and will not exceed a total thickness of 1.50m. 5. Spoil will only be deposited on slopes of < 10 degrees to the horizontal and greater than 10m from the top of a cutting. The exact location of such areas will be determined on consultation with the geotechnical specialist. 6. A Peat Stability Register will record the location of each Spoil Disposal Site used and regular weekly assessment will be made by the construction manager or other suitably qualified individual. 7. Once disposal is complete the disposal sites will be re-vegetated with the “Top Mat” RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 68 03/09/2025 removed at the commencement of disposal operations. Upon commencement of the restoration phase guidance from a suitably qualified ecologist will be sought to provide a suitable methodology and programme of maintenance for the restored areas. 8.1.15 BIRDS The following mitigation measures will be implemented to minimise potential impacts to bird species: • Construction activity such as vegetation stripping will be timed to commence prior to the start of the breeding bird season, which includes the months of March to August inclusive. • A Project Ecologist will be appointed for the duration of construction works to advise the contractor and will visit as necessary when works are in progress to ensure that all mitigation measures are adhered to. The Project Ecologist will be responsible for completing pre-construction transect/walkover surveys over the proposed development site to ensure that disturbance to breeding birds (such as skylarks) is avoided. • The Project Ecologist will be responsible for undertaking ongoing ornithological monitoring during periods of the construction phase that overlap with the breeding bird season. The ornithological monitoring will focus on identifying the presence of sensitive bird species at the proposed development site. In the event that sensitive bird species are identified as nesting at or within a 500m buffer zone of the construction footprint, the timing of works will be scheduled to minimise disturbance to nests and/or an appropriate buffer distance between the works and any nest site will be implemented. 8.1.16 MITIGATION BY REMEDIATION When excavating the access road, peat material will be removed and stored separately. This peat will be stored in designated areas and reinstated along the edges of the completed access road on completion of construction. The surface of this peat will be seeded with heathland species such as Calluna vulgaris, Erica tetralix, Myrica gale etc. that are typical of the surrounding peatland habitats. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 69 03/09/2025 All spoil material excavated during the construction phase will be reinstated following the completion of the construction phase of the proposed development. Suitable temporary storage areas will be identified in advance in association with the site contractors. The Project Ecologist will review any suggested storage areas for possible ecological interests. 8.2 Operational Phase Mitigation 8.2.1 PROTECTION OF BATS The Natural England guidance (2014) and NatureScot (2021) recommends that potential collision to bats from wind turbine developments can be minimised by siting the proposed turbines so that all parts of the turbine rotor swept area are over 50 m from the nearest vegetated feature. The location of the proposed turbine will satisfy this recommendation with no vegetated features occurring within 50 m of a turbine rotor diameter. To this end a “bat buffer” area will be implemented around turbine such that the buffer area will remain free of suitable foraging habitat, consisting of conifer plantation edge and scrub. This will require the clearance of conifer plantation within a 91m radius of the turbine hub. The implementation of this buffer will increase the total extent of hedgerow clearance to a total length of 340m. In order to avoid the potential for future interactions between the now proposed turbine and local bat populations all structures associated with the project (i.e. the substation building) will be built in a manner to ensure no roosting opportunities are present to bats. Also, no structured vegetation will be permitted to establish at these locations during the operational phase of the turbine. 9.0 RESIDUAL IMPACTS OF THE DEVELOPMENT There will be a permanent loss of a discrete area of improved agricultural grassland. The loss of small areas of these habitats will not adversely affect the conservation status of the RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 70 03/09/2025 surrounding ecological resource. Disturbance to fauna will be short-term and will not result in significant impacts. Table 9.1 summarises the residual impacts of the proposed development to the receiving biodiversity. Table 9.1: Residual Impacts of the Proposed Development Habitat Potential Impact Mitigation Residual Impact Habitats Loss of a discrete areas of habitats within the footprint of the proposed development. Minimise habitat loss No significant residual impact predicted Non-volant Minor as only discrete areas of semi- natural habitat will be lost to the footprint of the project. Minimise duration of disturbance. No significant residual impact predicted RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 71 03/09/2025 Habitat Potential Impact Mitigation Residual Impact Bats Risk of collision with turbine blades resulting in fatalities, particularly with respect to Common pipistrelle which was found to be active at high levels in the vicinity of the proposed turbine location. Implement the Natural England guidelines to ensure adverse impacts to bat are reduced The risk of fatalities is reduced further by adhering to the NE 50m buffer distance. A residual risk to individual bats will remain, however in light of the low levels of activity recorded at the site it is unlikely that the wind turbine will pose a significant risk to the conservation status of bat populations. A low residual risk of collision and bat fatalities is predicted for the project. Birds Short-term disturbance Minimise duration of construction phase to minimise associated short- term disturbance to birds. No significant residual impact predicted RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 72 03/09/2025 Habitat Potential Impact Mitigation Residual Impact Clear vegetation during the non- breeding bird season to avoid disturbance to bird nest sites. Operation phase collision risk Undertaken monitoring during the operation phase. The results of monitoring will inform the operation phase of the wind turbine. The completion of operation phase monitoring and the use of the monitoring results to inform the operation phase of the turbine will further reduce the risk of adverse effects to local populations of sensitive species occurring in the wider area surrounding the proposed turbine location. 9.1 Conclusion The proposed Single Wind Turbine at Carney’s Island is not subject to any statutory nature conservation designations. The footprint of the project is dominated by habitats of low nature conservation value. The proposed development site is connected to the Lough Oughter And Associated Loughs SAC via hydrological pathways. The hydrological pathway will not RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 73 03/09/2025 function as an impact pathway and there will be no risk of likely significant effects to this or any other European Sites. A comprehensive approach to the management of surface water drainage will be implemented from the outset as part of the project. The surface water management measures to be implemented are representative of best practice construction methods that aim to avoid contamination of the aquaitc environment. The implementation of such measures will minimise to an insignificant level the likelihood of any event occurring that could impact on the water quality of watercourses at and downstream of the proposed site. A range of mitigation measures have been outlined for the proposed development and with the implementation of these measures the proposed development will not have the potential to result in significant negative residual impacts to habitats or fauna occurring at and in the wider area surrounding the proposed development site. 9.2 References Arnett, E.B. et al (2008). Patterns of bat fatalities at wind energy facilities in North America. Journal of Wildlife Management. 71: pp. 61 – 78. Bach, L. (2002). Auswirkungen von Windenergieanlagen auf das Verhalten und die Raumnutzungen von Fledermausen am Beispiel des Windparks “Hohe Geest” Midlum - Endbericht, unpublished report for Instituts für angewandte Biologie Freiburg/Niederelbe. 46pp. Bach, L. & Rahmal, (2004). Summary of Wind Farm impacts on bats. Bremer Beitrage fur Naturkunde und Naturschutz. 7: pp. 245 – 252. Baerwald, E.F., D’Amours, G.H., Klug, B.J. & Barclay, R.M.R. (2008). Barotrauma is a significant cause of bat fatalities at wind turbines. Current Biology. 18(6): 695 – 696. Bang, P. & Dahlstrom, P. (2006). Animal Tracks and Signs. Oxford University Press. Oxford. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 74 03/09/2025 Bat Conservation Trust (2007). Bat Surveys – good Practice Guidelines. Bat Conservation Trust, London. Bat Conservation Trust (2011). Bat Surveys – Good Practice Guidelines. 2nd Edition: Surveying for Onshore Windfarms – Consultation Draft. Blake, D., Hutson, A.M., Racey, P.A., Rydell, J. & Speakman, J.R. (1994). Use of lamplit roads by foraging bats in Southern England. Journal of Zoology, London. 34: 453 – 462. Bridgham, S.D., Pastor, J., Janssens, J. A., Chapin, C. & Malterer, T. J (1996). Multiple limiting gradients in peatlands: a call for a new paradigm. Wetlands. Vol. 16(1): pp. 45 – 65. Brinkmann, R. & Schauer-Weisshahn, H. (2006). Untersuchungen zu möglichen betriebs - bedingten Auswirkungen von Windkraftanlagen auf Fledermäusse im Regierungsbe - zirk Freiburg. Regierunspräsidium Freiburg, Stiftung Naturschutzfonds Baden- Würtemberg, Grundelfingen. Byrne, A.W., Sleeman, P., O’Keefe, J., Davenport, J. (2012). The ecology of the European Badger (Meles meles) in Ireland: A review. Biology and Envrionment: Proceedings of the Royal Irish Academy. Vol. 112B(1). Royal Irish Academy. Campbell, E., Foy, B., 2008. Lough Melvin Catchment Management Plan. INTERREG Programme: p. 252. http://www.fisheriesireland.ie/fisheries-research-1/49-loughmelvin- cachment-management-plan-executive-summary-1/file. Cordeiro, A, M Mascarenhas and H Costa (2013). Long term survey of wind farms impacts on Common Kestrel’s populations and definition of an appropriate mitigation plan. In Book of Abstracts: Conference on wind power and environmental impacts (CWE), Naturvår dsverket Rapport 6546 p. 47. Stockholm, Sweden. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 75 03/09/2025 de Lucas, M., Janss, G., Whitfield, D.P., Ferrer, M. (2008). Collision fatality of raptors in wind farms does not depend on raptor abundance. Journal of Applied Ecology. Vol 45: p. 1695 – 1703. Dingerkus, S.K. & Montgomery, W.I. (2002). A review of the status and decline in abundance of Irish Hare (Lepus timidus hibernicus) in Northern Ireland. Mammal Review. Vol. 32: pp. 1 – 11. Douglas, D.J.T., Bellamy, P.E. & Pearce-Higgins, J.W. (2011) Changes in the abundance and distribution of upland breeding birds at an operational wind farm. Bird Study, 58, 37–43. Evans Ogden, Lesley J., "Collision Course: The Hazards of Lighted Structures and Windows to Migrating Birds" (1996). Fatal Light Awareness Program (FLAP). Paper 3. Fairley, J. (2001). A basket of weasels. Private Publication. Forrest, J., Robinson, C., Hommel, C. and Craib, J. 2011. Flight activity and breeding success of hen harrier at Paul’s Hill Wind Farm in North East Scotland. Natural Power Conference Paper. Grodsky SM, Behr MJ, Gendler A, et al. Investigating the causes of death for wind turbine- associated bat fatalities. J Mammal. 2011;92:917–925. Hayes, J.P. (2000). Assumptions and practical considerations in the design and interpretation of echolocation-monitoring studies. Acta Chiropterologica 2(2): p225-236. · Heritage Council (2000). A Guide to Habitats in Ireland. The Heritage Council, Kilkenny. Heritage Council (2010). Best practice guidance for Habitat Survey and Mapping. Prepublication Draft. The Heritage Council, Kilkenny. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 76 03/09/2025 Horn J.W., Arnett E.B., Kunz T.H. (2008). Behavioural responses of bats to operating wind turbines. Journal of Wildlife Management. 72(1): 123 – 132. Institute of Ecology and Environmental Management (2006). Guidelines for Ecological Assessment in the United Kingdom. Kepel, A., Ciechanowski, M., Jaros, R. (2011). How to assess the potential impact of wind turbines on bats using bat activity surveys? A case study from Poland, XII European Bat Research Symposium, August 22-26, 2011, Vilinusm Lithuania. Ketzenberg, C., Exo, K.-M., Reichenbach, M., & Castor, M. (2002) Einfluss von Windkraftanlagen auf brütende Wiesenvögel. Natur und Landschaft 77: 144-153. Kunz, T., Arnett, E., Erickson, W.P., Hoar, A.R., Johnson, G.D., Larkin, R.P., Strickland, D., Thresher, R.W., Tuttle, M.D. (2007). Ecological impacts of wind energy development on bats: questions, research needs, and hypothesis. Frontiers in Ecology and Environment. Vol 5(6): p. 315 – 324. Langston, R & Pullan J. (2003). Windfarms & Birds. RSPB Lintott, P., & Mathews, F. (2018). Reviewing the evidence on mitigation strategies for bats in buildings informing best-practice for policy makers and practitioners. Lundy, M.G., Aughney, T., Montgomery, W.I., & Roche, N., (2011) Landscape conservation for Irish bats & species specific roosting characteristics. Bat Conservation Ireland. Marnell, F. (2002). The distribution and habitat of common lizard Lacerta vivipara Jacquin, in Ireland. Bulletin of the Irish Biogeographical Society. Vol 28: pp. 75 – 82. Matthews, F., Richardson, S., Lintott, P. & Hosken, D. (2016). Understanding the risk to european protected species (Bats) at Onshore Wind Turbine sites to inform risk management. final report. University of Exeter. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 77 03/09/2025 Mitchell- Jones T & Carlin C. (2009). Bats and onshore wind turbines: Interim guidance. Technical Information Note 051. Natural England, Sheffield, England. Moorkens, E.A. & Killeen, D. (2009). Mapping of the Distribution of Margaritifera margaritifera in the River Deel (Moy Catchment), Co. Galway. National Parks and Wildlife Service, Department of Environment, Heritage & Local Government, Dublin, Ireland. Neal, E., & Cheeseman, C. (1996). ‘Badgers’. Poyser Natural History, London. Ogden, E. L. J. (1996). "Collision Course: The Hazards of Lighted Structures and Windows to Migrating Birds". Fatal Light Awareness Program (FLAP). Paper 3. Pearce-Higgins, J., Stephen L., Douse, A., Langston, R. (2012). Greater impacts of wind farms on bird populations during construction than subsequent operation: results of a multi-site and multi-species analysis. Journal of Applied Ecology. Vol 49: p 386 – 394. Percival S. (2003). Birds and Wind Farms in Ireland: A review of potential issues and impact assessment. Reynolds, J.D. (1998) Conservation management of the white-clawed crayfish, Austropotamobius pallipes. Part 1. Irish Wildlife Manuals, No. 1. Racey, Speakman & Swift (1987). Reproductive adaptations of heterothermic bats at the northern borders of their distribution. South African Journal of Science. 83: 635 – 638. Rodrigues L., Bach L., Dubourg-Savage M.-J., Goodwin J. & Harbusch C. (2008). Guidelines for consideration of bats in wind farm projects. EUROBATS Publication Series No. 3 (English version). UNEP/EUROBATS Secretariat, Bonn, Germany, 51 pp. Rollins, K.E., Meyerholz, D. K., Johnson, G. D., Capparella, A. P. and Loew, S. S. (2012). A Forensic Investigation Into the Etiology of Bat Mortality at a Wind Farm: Barotrauma or Traumatic Injury? Veterinary Pathology. Vol. 49: p. 362. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 78 03/09/2025 Russ J.M. & Montgomery W.I. (2002). Habitat associations of bats in Northern Ireland: Implications for Conservation. Biological Conservation. 108: 49 – 58. Russ J.M., Briffa M., Montgomery W.I. (2003). Seasonal patterns in activity and habitat use by bats (Pipistrellus spp. And Nyctalus leisleri) in Northern Ireland, determined using a driven transect. Journal of Zoology. London. 259: 289 – 299. Scottish Natural Heritage (SNH) (2009). Monitoring the Impact of Onshore Wind Farms on Birds. Scottish Natural Heritage. Steinborn, V.H. & Reichenback, M. (2011). Kiebitz und Wind kraftanlagen - Ergebnisse aus einer siebenjährigen Studie imsüdlichen Ostfriesland. Nat.sch. Landschaftspl. 43: 261-270 Szewczak, J.M. and Arnett, E.B (2006) Ultrasound Emissions from Wind Turbines as A Potential Attractant to Bats: A Preliminary Investigation. Report prepared for Bat Conservation International. Tierney, D & O’Boyle, S (2016). Water Quality in 2016: An Indicators Report. EPA. Verboom B. & Huitema H. (1997). The importance of linear landscape elements for the Pipistrellus pipistrellus and the serotine bat Eptesicus serotinus. Landscape Ecology. 12(2): 117 – 125. Verboom B. & Spoelstra K. (1999). Effects of food abundance and wind on the use of tree lines by an insectivorus bat, Pipistrellus pipistrellus. Canadian Journal of Zoology. 77: 1393 – 1401. Walsh, A.L. & Harris, S. (1996). Foraging habitat preferences of vespertilionid bats in Britain. Journal of Applied Ecology 33: 508-518. Whilde, A (1993). Irish Red Data Book 2: Vertebrates. Threatened Mammals, Birds, Amphibians, and Fish in Ireland. Published by HMSO. RECEIVED: 07/10/2025 Client: ART Generation Ltd. Project Title: Single Wind Turbine, Carney’s Island Document Title: EcIA Date: July 2025 Document Issue: Final SWT Carney’s Island 79 03/09/2025 RECEIVED: 07/10/2025