HomeMy WebLinkAbout2560400 - Application - Cover Letter
Directors: Company Registration No. 715360
Barry McGinn BSc(Eng) DipEng DipProjMgmt DipConstLaw&CA DipP&Elaw CEng MIEI Registered Address: 30 Drumcondra Road Upper, Drumcondra, Dublin 9, D09 FT7K
Denise Gallagher
30th September 2025
Monaghan County Council
Planning Offices
1 Dublin Street
Monaghan
H18 X982
By submission to: Monaghan County Council
Page 1 of 5
Re: Planning Application for a Renewable Energy Project in the Townlands of Carneys
Island, Altartate Glebe, Clonavilla, and Legarhill Co. Monaghan.
Mable Ref: 22790-Cover Letter-250930
Dear Sir / Madam,
On behalf of our Client, ART Generation Limited, please find enclosed a planning application for for a 10-year
planning permission for development at a site within the townlands of Carneys Island, Altartate Glebe, Clonavilla,
and Legarhill Co. Monaghan.
The development will consist of the construction of a Single Turbine Wind Farm development on a 7.64-hectare
site consisting of:-
a) A single 4.8-megawatt (MW) wind turbine with an overall tip height of 143.8 metres, comprising a rotor
diameter of 133.2m and a hub height 78m;
b) Wind turbine foundation, crane hardstanding and assembly area;
c) Temporary Construction Compound;
d) Upgrade of an existing field entrance to new wind farm site entrance;
e) Upgrading and widening of existing access tracks;
f) New access tracks;
g) A new 10.5m clear span bridge crossing an existing stream;
h) Demolition of the ruinous remains of two old stone buildings;
i) An on-site 20kV electrical substation;
j) Electrical and communication cabling within private lands;
k) Underground 20kV grid connection within private lands and within the R183 public road connecting to
the existing ESB Clones 38kV Substation;
l) Tree felling, landscaping and reinstatement works; and
m) All associated ancillary works.
The operational lifespan of the development will be 35-years from the date of commissioning.
This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)
and it is important to note that the planning application may be subject to section 34D of the Planning and
Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of
article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
RECEIVED: 07/10/2025
Page 2 of 5
Requirements for EIA
Following the Environmental Impact Assessment (EIA) Screening, it was concluded that the Proposed
Development is unlikely to result in any significant effects on the environment. Consequently, a full Environmental
Impact Assessment Report (EIAR) was deemed as not required. However, a detailed Environmental Report has
been submitted in support of this application.
Consultation
Preplanning drawings were submitted to Monaghan County Council (MCC) along with a request for a pre-
planning meeting. Pre-planning feedback was received from MCC by way of email dated 13/05/2024.
Landowners
A list of the consenting landowners and their folios are outlined below.
Landowner Folio(s)
Paul Harte
Edward Treanor
Thomas Treanor
Water Protection Checklist
Monaghan County Councils water protection checklist has been filled out and is enclosed with this letter.
Application Documents
Accordingly, we attach the following documents and drawings for your consideration:
1. Copy of the Site Notice
2. Copy of the Planning Advert
3. Planning & Environmental Report
4. Planning Drawings (Drawing List Enclosed)
5. Construction & Environmental Management Plan
6. Preliminary Traffic Management Plan
7. Archaeological Impact Assessment Report
8. Noise Impact Assessment Report
9. Landscape and Visual Impact Assessment Report
10. AA Screening Report
11. Landowner Consent Letter
12. Applicant letter of consent to agent
13. The requisite fee made payable to Mayo County Council paid by EFT.
A detailed list of the planning documents & drawings is enclosed with the application.
We look forward to receiving your formal acknowledgment of this Planning Application in due course. In the
meantime, do not hesitate to contact Mr. Eoin Roche should you require any further clarification or information on
the Planning Application.
Yours Sincerely,
____________________________________
Eoin Roche
Project Engineer RECEIVED: 07/10/2025
Page 3 of 5
For Mable Consulting Engineers Ltd.
Enclosed:
• Planning Document List – Enclosed Separately with this Planning Application
• Planning Drawing List – Enclosed Separately with this Planning Application
• Monaghan County Council Water Protection Plan Checklist
MONAGHAN LOCAL AUTHORITIES
Water Protection Plan Checklist
(To be accompanied by a Site Drainage Plan - Refer to Chapter 4 of Monaghan County
Development Plan 2013-2019)
General Site and Water Body Details
Planning Ref. No. Applicant ART Generation Ltd.
Townland Carneys Island Water Supply Source N/A
X Co-ordinate 1 652228 Y Co-ordinate 1 826431
WMU 2 N/A RWB 2 N/A
WB Status 2 N/A Objective 2 N/A
Groundwater
Vulnerability 3
N/A Aquifer Importance 3 N/A
Proximity to nearest watercourse (culverted or open), wetland or lake
(meters)
0m
Proposed Development
Is the development entirely or part of one of the following? (tick)
Domestic dwelling Agricultural
(cattle/dairy)
Industrial-food related
Public Works Agricultural
(mushrooms)
Industrial-non food
Housing Agricultural (poultry) Quarrying/extractive
industries
Institutional Agricultural (piggery) Transport related
Commercial/Retail Other agricultural –
specify below
Filling station/Fuel depot
Mixed Use
Development
Other: Single Wind Turbine
Development
X
Waste Water Production and Treatment Method
Domestic type waste waters N/A
Waste waters produced from any trade,
food, preparation or business 4
N/A
Wheel wash, vehicle wash, cooling waters N/A
Waste waters produced from quarrying
etc 4
N/A
Other waste waters 4 N/A
Construction phase waste waters
Frequently asked questions for septic tanks may assist in the “fit for purpose” assessment refer
to http://www.monaghan.ie/en/services/environment/water/waterawareness/faqforseptictanks/
Fuel or Outdoor Material Storage for Non Domestic Developments
Number of fuel storage tanks existing or proposed on site? 0
Are fuel storage tanks bunded 5? Yes RECEIVED: 07/10/2025
Page 4 of 5
Detail liquid / feedstuffs / organic
/ chemical / waste oil storage on
outdoor sites
N/A
Hard Surface and Open Yard Areas for Non Domestic Developments
Footprint of proposed development including yard areas in m2 76400
Is there potential for soiled yard areas from material, product waste
or manure handling, fuel dispensing, silt and soil, yard washing etc.
No
If yes, are silt trap(s), interceptor(s), soiled water tanks or other
control measures shown on drainage plan?
Yes
Has the use of SUDS (Sustainable Urban Drainage Systems –
http://www.susdrain.org ) been considered in the design of this
development?
Yes
Development History – All Developments
Have previous pollution prevention planning conditions been complied with 6? N/A
Does existing development have an up to date (as constructed) site drainage plan? N/A
Is the existing/proposed development sewered or unsewered? N/A
If unsewered, is the existing wastewater treatment system fit for purpose7? N/A
Has the storm water drainage system been examined and/or surveyed for
misconnections? (Information leaflet available from Environment Section) N/A
N/A
Checklist of items to be included on Site Drainage Plan
Location of lakes, watercourse, wells used for water supply, or karst features on or
within 25m of domestic or 100m of non domestic development site
Yes
Location of all drainage outfall points Yes
Foul water drainage system (in Red) N/A
Storm water drainage system (in Blue) N/A
Soiled yard area, soiled water drainage and management system, including silt
traps, oil interceptor(s) and any SUDS facilities
N/A
Location of waste water treatment facilities N/A
Location of fuel storage tank(s) N/A
Stream/Lake/Wetland/Riparian Corridors Yes
Footnotes and Useful Information
1 Projection in the Irish Grid
2 WMU, RWB, WB status. Objectives available on water maps at www.wfdireland.ie
3 Available in the public mapping section at www.gsi.ie
4 For information leaflets on Business Premises and Proper Use of Drains and information on
discharge licensing see:
http://www.monaghan.ie/contentv3/services/environment/formsguidesdocumentsdownlands/
http://www.monaghan.ie/contentv3/services/environemtn/water/waterawareness/leaftletsandguidelines/
5 Guidance: www.envirocentre.ie Best practice for Oil Storage (BPGCS05)
6 Has certification of installation for previously granted wastewater treatment system been
required and if so has it been submitted.
7 Refer to EPA Guidance at:
http://www.monaghan.ie/contentv3/services/environment/water/waterawareness/faqforseptictanks/ and
http://www.monaghan.ie/contentv3/media/monaghanie/content/files/pdf/environment/Water
Pollution&DrainageSystems.pdf
8 Refer to Water Body, Sensitive Waters and Sensitive Land Maps in Chapter 4 of the
Monaghan County Development Plan 2013-2019
Abbreviations
WMU Water Management Unit
RWB River Water Body
WB Status Water Body Status
IPPC Integrated Pollution Prevention Control Licence
EIA Environmental Impact Assessment RECEIVED: 07/10/2025
Page 5 of 5
For Office Use: Sensitivity of Location
Is the development located upstream of a high river quality site 8?
Is the development located within a good status waterbody 8?
Is the development located in the catchment of a water supply source 8?
Is the development located within the Source Protection Zone (SPZ) of a groundwater
supply source 8?
Does the development require a discharge licence to surface or ground waters under the
Water Pollution Acts?
Risk to waters in relation to scale of development, previous planning/environmental history,
IPPC or EIA aspects, site management and location in a sensitive area
Applicant:Art Generation limited
Agent: Mable Consulting Engineers Limited
RECEIVED: 07/10/2025
Project Title:Clones Single Turbine Wind Farm, Co. Monaghan Created By:ER
Applicant:ART Generation Limited Checked By:BMG
Project No.:22790 Date Created:07/10/2025
Page:1 of 1 Status:Planning
Document Reference
22790-Site Notice-251004
22790-Newspaper Ad-251007
22790-PER-P1
22790-CEMP-P1
22790-TMP-P1
22790-Landowner Consent Letters-P1
22790-Art Generation Consent Letter-250904
General Planning Documents
Other Consultant Documents
Carneys Is. Ass. (Final)
Clones Noise Report
20240719_Clones_Turbine_LVIA_(REV_A)
7234 Clones Shadow Flicker 01
2025.07.07 Clones SWT Screening Report V1
2025.07.07Clones SWT EcIA
DOCUMENT LIST
Copy of Site Notice
Landowner Consent Letter
Document Title
Archaeological Impact Assessment Report
Noise Impact Assessment Report
Landscape and Visual Impact Assessment Report
Traffic Mangement Plan
Copy of Newspaper Ad
Applicant letter of consent to agent
Construction Environmental Mangement Plan
Planning and Enviornmental Report
Mable Consulting Engineers Documents
The Planning Drawings (Separate List Provided) - Reference is for List 22790-Planning Drawings List-250920
List of Landowners 22790-Landowners-P1
Shadow Flicker Assessment Report
Ecological Impact Assessment Report
AA Screening Report RECEIVED: 07/10/2025
Project Title:Clones Wind Farm, Co. Monaghan Created By:ER
Applicant:ART Generation Limited Checked By:BMG
Project No.:22790 Date Created:07/10/2025
Page:1 of 1 Status:Planning
Drawing Number Scale Page Size
100
100 1:2500 A0
101-105
101 1:2000 A0
102 1:500 A0
103 1:500 A0
104 1:500 A0
105 1:500 A0
110
110 1:500 A0
Proposed Drainage Details 150 Series
150 As Shown A1
151 As Shown A2
152 As Shown A3
153 1:50 A3
154 1:50 A1
Detailed Drawings 200 Series
200 1:200 A0
201 1:200 A0
202 1:200 A0
203 1:100 A1
204 1:50 A1
210 1:50 A3
211 As Shown A3
212 1:10 A2
213 As Shown A3
214 As Shown A3
215 As Shown A2
250 1:100 A3
Planning Issue
Planning Issue
Existing Derelict Buildings To Be Demolished Planning Issue
Typical Culvert/Service Over Crossing Planning Issue
Typical Culvert/Service Under Crossing Planning Issue
Typical Horiziontal Directional Drilling Under Watercourse Planning Issue
Planning Issue
Site Layout Map "C"
Site Entrance and Sightline
Drainage Details 1 of 4 Planning Issue
Drainage Details 3 of 2 Planning Issue
Proposed Bridge Details Planning Issue
Drainage Details 4 of 4 Planning Issue
Drainage Details 2 of 4 Planning Issue
Site Entrance And Sight Lines
Planning Issue
Typical Hardstand Foundation Planning Issue
Typical Access Track Details Planning Issue
Typical Private Lands Ducting Details
Planning Issue
Turbine Details 1 of 2
Planning Issue
Proposed 20kV Substation Building Planning Issue
DRAWING LIST
Site Location
Site Layout Maps
Planning Issue
Typical Public Area Ducting Details Planning Issue
Turbine Details 2 of 2 Planning Issue
Typical Hardstand Details
Site Layout Map - Key Plan Planning Issue
Drawing Title Description
Site Layout Map "D"Planning Issue
Site Layout Map "A"Planning Issue
Site Layout Map "B"
Site Location Map RECEIVED: 07/10/2025