Loading...
HomeMy WebLinkAbout2560358 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT To: Planning From: Martina Smith, Environment Date: 16/10/25 Re: 25/60358 Yvonne Mohan, Sheetrim, Monaghan, Co. Monaghan Agent: ESARCH _________________________________________________________________________________________ permission consisting of the construction of an extension to the rear of an existing storey and a half type dwelling house, internal and external alterations to dwelling house, conversion of existing attached shed to living accommodation, new/modified entrance, boundary walls, piers and fencing, decommissioning of existing septic tank and replace with proprietary sewage treatment unit and percolation area and all ancillary site works. The proposed development is located on a poor aquifer in an area of extreme groundwater vulnerability. The development site is located within the Shambles_10 sub-basin which has been assigned Poor status under the Water Framework Directive status (2019 - 2024) with an objective of Restore to Good Status by 2027. Urban Wastewater and Urban Run-off have been identified as significant pressures on this waterbody. A Site Characterisation Form has been submitted with the application. I recommend the file is referred to the EHO for assessment & comments in relation to the DWWTS. The application states that storm water will discharge to the adjacent watercourse. The Shambles_10 runs along the boundary of the site it is imperative that mitigation measures are in place for the construction phase to ensure no polluting discharges to the watercourse. A water protection checklist has not been included with the application. It is recommended that a CEMP is requested prior to commencement of development. Recommendation I have no objection to planning permission subject to the following conditions: 1. One month prior to commencement of development submit a fully completed water protection plan checklist. 2. One month prior to the commencement of development, the applicant shall submit a Construction and Environmental Management Plan (CEMP) for agreement. This plan shall be sufficient to demonstrate that adequate measures will be in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any waters. The Construction and Environmental Management Plan shall take account of best practice and the guidance produced by Inland Fisheries Ireland titled “Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters 2016”. The CEMP shall include the location details of the monitoring points where daily visual checks shall be carried out. 3. The developer shall ensure that mitigation measures in the CEMP are implemented and that adequate measures and precautions are in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters discharging from the site to any watercourse. These measures shall take account of the Guidance produced by Inland Fisheries Ireland titled “Requirements for the Protection of Fisheries Habitat during Construction and Development Works at River Sites”, available to download at https://www.fisheriesireland.ie/documents/624-guidelines-on-protection- of-fisheries-during-construction-works-in-and-adjacent-to-waters/file.html 4. Monaghan County Council and Inland Fisheries Ireland shall be informed immediately of an accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge which may threaten the quality of any watercourse or groundwater body. 5. The applicant shall ensure completely separate foul and surface water drainage systems are in place. 6. The onsite wastewater treatment system and infiltration area shall be maintained in accordance with manufacturers specifications. 7. Waste arising from the desludging of the wastewater treatment system shall be collected by a suitably permitted collector in accordance with the Waste Management Act, 1996 as amended. 8. Material storage, fuel handling, parking areas and other yard activities shall be managed in a manner which prevents the discharge of polluting matter to ground or surface water. 9. Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. 10. If infilling material is required to be imported onsite the applicant or economic operator shall: (a) Utilise EPA By-Product Regulation 27 in moving soil infill material from one site to another. Official correspondence demonstrating Article 27 Registration with the EPA shall be submitted to the Planning Authority prior to commencement of development. or (b) If using waste material as infill and prior to acceptance of material a valid permit must be issued by Monaghan County Council in accordance with the Waste Management (Facility Permit and Registration) Regulations 2007 as amended. or (c) Buy topsoil material as a product for final landscaping purposes only. Documentation demonstrating purchase shall be submitted to Planning Authority. 11. Prior to commencement of development submit to Environment services, (a) A site-specific Construction & Demolition Resource Management plan for approval. Applicant to consider Best Practice Guidelines for the preparation of Resource & Waste Management Plans for construction and demolition projects. (b) An Asbestos survey and removal plan for the proposed development works. 12. All waste oils and any other hazardous waste materials shall be stored appropriately and collected, recovered or disposed of in accordance with the Waste Management Act 1996 as amended, and records of such shall be kept on site. 13. (i) All hazardous liquid waste or oil/fuel storage containers, temporary or otherwise, shall be bunded. (ii) All bunds will be designed to contain 110 % of the capacity of the largest storage container located within the bund. (iii) There shall be no overflow drain facility from any bunds on site and all filling and off - take points shall be located within a bund. 14. Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act, 1996 as amended. Signed: Date: 16/10/25