Loading...
HomeMy WebLinkAbout2572 - Report Received from Internal Staff - Environment No 225/72 ENVIRONMENTAL REPORT To Planning From: Lisa Smith, Environment Section Ref: 25/72 Tydavnet Community Creche, Mullanarockan, Tydavnet, Co. Monaghan Agent: Niall McKenna permission to insert adapted prefabricated unit as temporary classrooms for proposed creche, connect to existing public sewer and exit on to public road by existing laneway an all associated works. The site is located within the Blackwater (Monaghan)_030 waterbody which has been classified as Good Status, with an WFD objective of Protect. The site is located on an area of low groundwater vulnerability which is underlain by a locally important Aquifer. An incomplete water protection plan checklist has been submitted; it should be noted this is the old Water Protection Checklist Plan Checklist and not the updated version as per the new County Development Plan 2025-2031. Drinking water is a new connection to Tydavent Group Water Scheme. Wastewater treatments proposals are to connect to the public sewer. A pre-connection enquiry has been acknowledged by Uisce Eireann. The applicant would be able to connect to the public sewer. A connected application should be submitted and granted prior to development. Surface water to discharge via a soakpit. 6 car parking spaces are to be provided. No further details have been submitted. I recommend that the following additional information is requested from the applicant: • Submit a completed Water Protection Plan checklist for the proposed development. Please note & use the new Water Protection Checklist Plan as per the new County Development Plan 2025- 2031. • Submit proposals for the storm water drainage system to take account of the Department of Housing, Local Government and Heritage guidance document on Nature-based solutions for the management of rainwater and surface water run-off in urban areas. Proposal should include design details for a petrol interceptor for the car park area. • Submit a revised site layout plan clearly showing the following: o the storm water drainage system (in blue) and foul drainage (in red) o location of interceptor and/or any nature-based solutions o the storm water outfalls o location of any watercourses within the vicinity of the site. 25/72 Signed: A/Assistant Scientist Date: 17/10/2025 Approved: Date: 17/10/25