Loading...
HomeMy WebLinkAbout2560386 - Report Received from Internal Staff - MDMMOONNAAGGHHAANN CCOOUUNNTTYY CCOOUUNNCCIILL CCAARRRRIICCKKMMAACCRROOSSSS //CCAASSTTLLEEBBLLAAYYNNEEYY MMUUNNIICCIIPPAALL DDIISSTTRRIICCTT Planning Application No. 25/60386 Previous Ref.No’s. Applicant: 24/60162 Cavan & Monaghan Education Training Board Address: Connabury/Onomy, Castleblayney, Co. Monaghan Proposed Development: Permission to extend existing GAA pitch to include excavation of in-earth material and re-use of same on site to remodel playing pitch, new goal posts, new enclosed ball wall playing area, new generator room, new ball stopping nets, new cowled floodlighting, a new retaining wall and demolition of old ticket box building together with all ancillary and associated site works. Location: Connabury/Onomy, Castleblayney, Co. Monaghan Adjoining Road No. R-938 Site Notice: Yes 17/10/2025 Engineer’s Report No Objection Subject to the Following Conditions: 1. Provision to be made within the site for surface water drainage and no surface water to be allowed flow onto the public roadway. 2. Before any work is commenced on this development a security, by way of a cash deposit, in the sum of €2,250.00 is to be paid to the Planning Authority by the developer. To ensure the satisfactory completion of all surface water drainage/boundary work within and abutting the site area, to prevent runoff of surface water onto the public roadway and to ensure that no damage is caused to public roadway and any such damage is repaired satisfactory. MMOONNAAGGHHAANN CCOOUUNNTTYY CCOOUUNNCCIILL CCAARRRRIICCKKMMAACCRROOSSSS //CCAASSTTLLEEBBLLAAYYNNEEYY MMUUNNIICCIIPPAALL DDIISSTTRRIICCTT 3. The applicant will be required to put in place a Traffic Management Plan (TMP) for the duration of the construction works in accordance Chapter 8 of the Department of the Environment’s Traffic Signs Manual 2010, the contractor shall also implement monitoring measures to confirm the effectiveness of the mitigation measures outlined in the TMP. On finalisation of the TMP, the contractor shall adopt the plan and associated monitoring measures. The final TMP shall address the following issues: -  Site Access & Egress;  Traffic Management Signage;  Routing of Construction Traffic  Timings of Material Deliveries to Site;  Traffic Management Speed Limits;  Road Cleaning;  Road Condition;  Enforcement of Traffic Management Plan; 4. Site Access and Egress: - The contractor shall provide advanced warning signs, in accordance with Chapter 8 of the Department of the Environment’s Traffic Signs Manual 2010, on the approach to proposed site access locations a minimum of one week prior to construction works commencing at the site. 5. Road Cleaning: - the contractor will be required to carry out road sweeping operations to remove any project related dirt and material deposited on any length of the road network by construction / delivery vehicles. Road Sweepers will be required to dispose of material following sweeping of road network, to licensed waste facility. 6. Vehicle Cleaning: - The contractor will be required to provide wheel washing facilities, and any other necessary measures to remove mud and organic material from vehicles exiting site. In addition, the cleaning of delivery trucks such as concrete delivery trucks shall be carried out within the new site development and not in the existing residential area. MMOONNAAGGHHAANN CCOOUUNNTTYY CCOOUUNNCCIILL CCAARRRRIICCKKMMAACCRROOSSSS //CCAASSTTLLEEBBLLAAYYNNEEYY MMUUNNIICCIIPPAALL DDIISSTTRRIICCTT 7. Road Condition: -The extent of the heavy vehicle traffic movements and the nature of the works may create problems of such as fugitive losses from wheels, trailers or tailgates and localised areas of subgrade and wearing surface failure. The contractor shall ensure that:  Loads of materials leaving each site will be evaluated and covered if considered necessary to minimise potential dust impacts during transportation and the transportation contractor shall take all reasonable measures while transporting waste or any other materials likely to cause fugitive loses from a vehicle during transportation to and from site, including but not limited to: Covering of all waste or material with suitably secured tarpaulin/ covers to prevent loss and Utilisation of enclosed units to prevent loss. Signed: Niall Cadden DATE: 29/10/2025 Niall Cadden Assistant Engineer Carrickmacross/Castleblayney MD