RECEIVED: 29/10/2025
Page 1 of 25
Consulting Engineers
Building Surveyors
Architects
Site Description
The site is located at Tully, Co. Monaghan and is accessed off the main R188 Cootehill Road.
The site is a green field infill site located between two existing housing developments: Manor Wood
and Tully Estate.
The proposed site is approx. 2.39 Hectares in size and has sloping topography from North to South.
The development will consist of the provision of 49 no residential units, parking, access road, site
services and all ancillary and associated site works.
Site constraints
1. Existing housing backing onto the North of the Site.
2. Existing Housing backing on to the South of the Site.
3. Steep Topography.
4. Restricted access width to main site.
5. Viability of Main Public Services in the locality.
1
3
2
4
2 RECEIVED: 29/10/2025
Page 2 of 25
Consulting Engineers
Building Surveyors
Architects
SITE ANALYSIS – FEATURES
SITE ANALYSIS – VEHICULAR/ PEDESTRIAN MOVEMENTS
RECEIVED: 29/10/2025
Page 3 of 25
Consulting Engineers
Building Surveyors
Architects
SITE ANALYSIS – VIEWS RECEIVED: 29/10/2025
Page 4 of 25
Consulting Engineers
Building Surveyors
Architects
Site Design Approach
The overriding design intention is to create an inclusive and coherent community based on best
practice urban planning principles, giving residents a sense of place, ownership and identity.
The following key design aspirations have underpinned the design process of the layout to date:
• Creation of a high-quality living environment for residents and enhancement of the social,
environmental and visual quality of the area as a whole.
• Design of the layout to discourage antisocial behaviour, particularly by ensuring that all
access ways and public areas are overlooked by dwellings.
• Elimination of barriers to accessibility for all users.
• Promoting the concepts of enclosure, clear separation of public/private realm and good
permeability as the means to achieve a high-quality living environment.
Proposed Development
Public Open Space
There is a large main public open space 2565m² central to the site as well as smaller passive
open space amounting to 1020m² which brings the total site open space over 3585m². This is
around 15% of the total site area which is in accordance with Sustainable Residential
Development and Compact Settlements Guidelines for Planning Authorities 2024.
Streets, Roads and Footpaths
The proposed site is accessed off the main R188 Cootehill Road. This road layout has been
assessed by a Road Safety Auditor and the estate road is being constructed in accordance with
the recommendations outlined therein. All parking for the dwellings has been provided to the front
or to side of each dwelling and is located so they will be overlooked by the residents and in close
proximity of each individual dwelling. Given the location of the parking spaces and the use of
boundary fences etc there is a clear demarcation of parking spaces for each unit also.
Boundary Treatments
There will be two no. boundary treatments used throughout this development as follows:
• Concrete posts with treated timber boards 150x25mm 2m high between rear gardens,
• Concrete posts with treated timber boards 150x25mm 1m high between front gardens,
• There are also a number of retaining walls which will be a dry segmental type wall of
varying heights. RECEIVED: 29/10/2025
Page 5 of 25
Consulting Engineers
Building Surveyors
Architects
A tree survey was undertaken along the Eastern boundary of the site. There is a mix of t rees with
varying species and maturity. Heights range from 13.77m to 23.08m. It is proposed to retain and
protect these trees and hedgerow along the boundary. See survey below:
Topography
The site is of a steep sloping nature around 1:7 from North to South. The houses and associated
access roads have been positioned along the natural contour of the land as far as possible at a
reduced formation level.
Views
The surrounding area comprises housing developments to the North and South with agricultural
land to the west. Predominant views will be toward the proposed central green open space.
Dwelling Types
A range of dwelling types and scales have been developed to avoid a monotonous arrangement
lacking in character. RECEIVED: 29/10/2025
Page 6 of 25
Consulting Engineers
Building Surveyors
Architects
A mix of houses for range of users has been provided to meet the specific housing need identified
in the local community.
The housing is of two, three and four bed nature varying from semi-detached, single storey and two
storey. See below:
The following residential mix will be provided within the development:
• 8 No. Type A1 - Two Storey 3 Bed Semi-detached Units
• 12 No. Type A2 - Two Storey 3 Bed Semi-detached Units
• 2 No. Type A3 - Two Storey 3 Bed Semi-detached Units
• 4 No. Type B1 - Two Storey 4 Bed Semi-detached Units
• 4 No. Type B2 - Two Storey 4 Bed Semi-detached Units
• 4 No. Type C1 – Single Storey 2 bed Semi-detached Unit
• 2 No. Type C2 - Single Storey 4 Bed Semi-detached Units
• 3 No. Type D1 - Two Storey 2 Bed 3 block Terraced Units
• 8 No. Type D2 - Two Storey 2 Bed 4 block Semi-detached Units
• 2 No. Type E1 - Two Storey 2 Bed 4 block Semi-detached Units
Total: 49 No. Units.
The single storey dwellings are intended for elderly residents or residents with disabilities and are
intentionally located at the lower end of the site where footpath gradients are flatter.
Given the development is of a linear nature, a mix of dwelling styles have been utilised to provide
variation in the building line and street scape. The use of dwelling designs with varying elevations
affords scope for Architectural expression to create a varied and balanced streetscape.
House Design
The variety of house types are designed with a similar depth to allow ease of interchange of types
within a cohesive streetscape and efficient layout.
Space standards for all the dwellings are in accordance and often exceed the requirements set out
in the Design Manual for Quality Housing 2022 document and the relevant sections of the
Monaghan County Council Development Plan 2025-2031.
Use of natural daylight and sunlight has been maximised, with all windows sized to allow good
daylight penetration and benefit from solar gain year round. RECEIVED: 29/10/2025
Page 7 of 25
Consulting Engineers
Building Surveyors
Architects
The arrangement of living/ kitchen/ dining spaces to the rear of the dwellings affords privacy and
also encourages interaction with the gardens to the rear with generous French doors giving ease
of access and continuity between inside and outside for the building occupants.
Practical aspects of access and use have been considered in detail, with particular reference to
part M of the Building Regulations.
Storage spaces are distributed throughout the circulation areas, living spaces and bedrooms, with
kitchen cupboard spaces and worktops being provided to meet (or exceed where possible) the
requirements set out in table 5.2 of the Design Manual for Quality Housing 2022 document.
Refuse storage is out of sight to the rear of the dwellings with all dwellings having side access
without the need to bring the refuse bin through the house to the front.
The front curtilage includes lawns with low level Box Hedging along the party line which is of low
maintenance and contributes to a well landscaped streetscape. Driveways are envisaged to be
tarmacadam with concrete footpaths which will match the landscaping used in phase 1 of this
development.
Private open space to each of the dwellings is provided by way of a secure garden to the rear of
each house or in some isolated instances to the side of the dwelling. Access to the gardens is
secured by a timber gate from the side of the dwelling The garden sizes provided well exceeds the
space requirements outlined in the Design Manual for Quality Housing 2022 and Sustainable
Residential Development and Compact Settlements Guidelines for Planning Authorities 2024.
All dwellings will be of contemporary design with standard forms and pitched tile roofs, with smooth
render finish.
All houses have been designed so the occupants of one dwelling can enjoy their own dwelling
without nuisance being caused by neighbours with private amenity space located to the rear of the
dwelling.
RECEIVED: 29/10/2025
Page 8 of 25
Consulting Engineers
Building Surveyors
Architects
Concept Site Plan
RECEIVED: 29/10/2025
Page 9 of 25
Consulting Engineers
Building Surveyors
Architects
Part V Requirement
This application has a Part V requirement which the provision of 10 No. dwellings. It is proposed to
satisfy the requirements of Part V of the Planning and Development Act as outlined below:
See Site Layout for locations.
Costings
Indicative costings outlined below for Part V dwellings subject to future agreement with Monaghan
County Council:
Site Services
This development will require the provision of all required services including Foul, Storm
(including suitably sized attenuation system), Watermain, ESB & EIR. Pre-connection enquires
have been made with the relevant service providers who have confirmed adequate capacity to
service the site. The foul and watermain are feasible with some upgrades to existing infrastructure
to ensure capacity. This will include the diversion of storm water away from the public foul sewer
and to a new standalone storm sewer which will discharge to watercourse along Glen Road. A
proposal for this has been prepared that will create sufficient comparative capacity in the main
House
Type
No.
Houses
Description Gross Floor
Area (m²)
Site Cost
Per Unit
Construction
Cost per M²
Development
Cost per Unit
Net Cost per
Unit
VAT @ 13.5%Total Cost
(Incl. VAT)
A2 2 3 Bed, 5 Person
Dwelling
97.44 25,000.00€ 1,850.00€ 33,890.00€ 239,154.00€ 32,285.79€ 271,439.79€
C1 5 2 Bed, 3 Person
Dwelling
66.9 25,000.00€ 1,850.00€ 33,890.00€ 182,655.00€ 24,658.43€ 207,313.43€
C2 1 4 Bed Dwelling 110.5 25,000.00€ 1,850.00€ 33,890.00€ 263,315.00€ 35,547.53€ 298,862.53€
D2 2 2 Bed, 4 Person
Dwelling
84.96 25,000.00€ 1,850.00€ 33,890.00€ 216,066.00€ 29,168.91€ 245,234.91€
Total 10 RECEIVED: 29/10/2025
Page 10 of 25
Consulting Engineers
Building Surveyors
Architects
sewer to take the proposed wastewater from this development. See proposal enclosed in
application.
Any new infrastructure required will meet the requirements of the relevant utility providers.
Childcare Provision
This development does not meet the minimum threshold of 75 units required to provide a
childcare facility under Section 15.8.15 of the Monaghan County Development Plan 2025–2031
nor has there been any developments commenced in the last 3 years in the vicinity that would
bring the cumulative total to over 75 units which would require a childcare facility in the area.
National Planning Framework
This section looks at planning policies on a National level.
The National Planning Framework 2040 states:
“A New Strategy for Managing Growth
From an administrative and planning point of view, Ireland is divided in to three regions: the
Northern and Western, Southern, and Eastern and Midland Regional Assembly areas. We need
to manage more balanced growth between these three regions because at the moment Dublin,
and to a lesser extent the wider Eastern and Midland area, has witnessed an overconcentration
of population, homes and jobs. We cannot let this continue unchecked and so our aim is to see
a roughly 50:50 distribution of growth between the Eastern and Midland region, and the Southern
and Northern and Western regions, with 75% of the growth to be outside of Dublin and its
suburbs.”
The proposed development is in line with this policy as the development of this site allows for a
more balanced regional growth in instances where they can be readily serviced such as this one.
The framework goes on to say that:
“A major new policy emphasis on renewing and developing existing settlements will be required,
rather than continual expansion and sprawl of cities and towns out into the countryside, at the
expense of town centres and smaller villages. The target is for at least 40% of all new housing
to be delivered within the existing builtup areas of cities, towns and villages on infill and/or
brownfield sites. The rest of our homes will continue to be delivered at the edge of settlements
and in rural areas.” RECEIVED: 29/10/2025
Page 11 of 25
Consulting Engineers
Building Surveyors
Architects
This development is considered an infill site in an otherwise built up area with existing housing
developments on each side; Tully estate and Manor Wood.
The framework has other relevant objectives to this development:
• Objective 3A - Deliver at least 40% of all new homes nationally, within the built-up footprint
of existing settlements.
• Objective 15 - Support the sustainable development of rural areas by encouraging growth
and arresting decline in areas that have experienced low population growth or decline in
recent decades and by managing the growth of areas that are under strong urban influence
to avoid over-development, while sustaining vibrant rural communities.
• Objective 18b - Develop a programme for ‘new homes in small towns and villages’ with local
authorities, public infrastructure agencies such as Irish Water and local communities to
provide serviced sites with appropriate infrastructure to attract people to build their own
homes and live in small towns and villages.
• Objective 32 - To target the delivery of 550,000 additional households to 2040.
Considering the site is within an existing settlement, can be easily serviced with water, wastewater,
esb and broadband, the proposed development is in line with the objectives outlined above and
supports the sustainable development of the area which will direct population into the settlement
rather than dispersed development throughout the surrounding rural countryside.
The framework states that “The key issue addressed in this Framework is where best to plan for
our growing population and economy. In doing so, it is necessary to learn from past experiences
and outline a new way forward that can channel future growth. The NPF will be aligned with and
supported by new and improved investment and governance arrangements. As a strategy, all
aspects are to be implemented together and are mutually complementary”.
Ireland’s Rural Fabric Reversing town/village and rural population decline, by encouraging new
roles and functions for buildings, streets and sites. Supporting the sustainable growth of rural
communities, to include development in rural areas. Implementing a properly planned local
authority led approach to identifying, meeting and managing the real housing needs arising in
countryside areas. Improving local connectivity to principal communication (broadband), energy,
transport and water networks. Promoting new economic opportunities arising from digital
connectivity and indigenous innovation and enterprise as well as more traditional natural and
resource assets (e.g. food, energy, tourism), underpinned by the quality of life offering.
RECEIVED: 29/10/2025
Page 12 of 25
Consulting Engineers
Building Surveyors
Architects
Making better use of under-utilised land and buildings, including ‘infill’, ‘brownfield’ and publicly
owned sites and vacant and under-occupied buildings, with higher housing and jobs densities,
better serviced by existing facilities and public transport.
The Rebuilding Ireland Action Plan has five pillars to address shortage in housing 4 of which are
relevant to this development are outlined below:
“Pillar 1 – Address Homelessness
Provide early solutions to address the unacceptable level of families in emergency accommodation;
deliver inter-agency supports for people who are currently homeless, with a particular emphasis on
minimising the incidence of rough sleeping, and enhance State supports to keep people in their
own homes.
Pillar 2 – Accelerate Social Housing
Increase the level and speed of delivery of social housing and other State supported housing.
Pillar 3 – Build More Homes
Increase the output of private housing to meet demand at affordable prices.
Pillar 4 – Improve the Rental Sector
Address the obstacles to greater private rented sector delivery, to improve the
supply of units at affordable rents.”
The supply of residential units on this site is consistent with the pillars outlined above.
It is apparent that this development located in an existing settlement which is fully serviced and also
a gap site between existing housing which will provide housing to the local area is in line with
policies outlined in the National Planning Framework.
The Regional Spatial and Economic Strategy (RSES) 2020-2032 Northern and Western Regional
Assembly Section 1.6 states: “What is immediately striking about the region is that it comprises
many of the areas that would traditionally be considered ‘rural’ within Ireland. That is to say, the
entire province of Connacht and Cavan, Donegal and Monaghan from the province of Ulster are
contained within the region.”
From the graph below (Figure 8) it becomes clear that Galway has been the primary beneficiary of
population growth within the region over the last two decades. It comprises approximately 38%
of the total increase or 69,204 persons. Donegal accounted for 16% of the total, Cavan saw 13% RECEIVED: 29/10/2025
Page 13 of 25
Consulting Engineers
Building Surveyors
Architects
and Mayo 11%. Roscommon, Monaghan, Sligo and Leitrim accounted for 7%, 6%, 5% and 4% of
the total increase respectively. All eight counties saw their pattern of growth stunted during the 2011
to 2016 period, although perhaps worryingly both Donegal and Mayo recorded decreases in their
population during this spell.
Monaghan’s 6% increase in the region’s population demonstrates that the county is regarded as a
rural area. This development will aid in increasing the county’s apportionment in the region’s
population increase.
The regional policy objective RPO 3.1 states:
• “Delivering on the population targets for the Metropolitan and Regional Growth Centres
through compact growth:
• Delivering significant compact growth in Key Towns; and
• Developing derelict and underutilised sites, with an initial focus within town cores”
The proposed development is an underutilised infill site which can be serviced with local
infrastructure.
Population growth within Monaghan shall be targeted at delivery of compact growth and also at the
cohort of the population that have historically sought to build individual houses in the countryside.
Thus, a mix of housing densities and plot ratio’s shall be targeted and consideration shall be given
to the difficult drumlin topography of Monaghan Town.
RECEIVED: 29/10/2025
Page 14 of 25
Consulting Engineers
Building Surveyors
Architects
This proposed development delivers compact growth within a settlement which provides alternative
accommodation to on-off single houses dispersed in the surrounding countryside.
Section 3.5 REGENERATION AND REVITALISATION
The future role and function of our large network of smaller towns and villages across the region
need to be re-imagined, addressing economic, physical and social decline issues. The regeneration
of our smaller towns and villages is now a major priority action for our region, which provides an
opportunity to address legacy issues and to turn around their fortunes. The health of our villages
and towns can be significantly influenced through the delivery of new housing through the utilisation
of existing buildings, brownfield/infill sites or otherwise. The NPF target for at least 40% of all new
housing to be delivered within the existing built-up areas of cities, towns and villages on infill and/or
brownfield sites is an important opportunity for our smaller towns and villages to be re-imagined
and therefore it is included as a key objective.
Additionally, given the extent of vacant and derelict buildings within the countryside, it is appropriate
to set a target that 20% of rural housing to be delivered on brownfield sites, subject to planning
considerations including those outlined above.
The utilisation of this infill site accords with the above policies of regenerating towns and villages
through the utilisation of brownfield/infill sites.
The Guidelines for Planning Authorities on Sustainable Residential Development in Urban Areas
2024 sets out relevant National Policy in respect of Sustainable Residential Development in Urban
Areas.
The guideline section 4.3 (i) “The design process should start with analysis and appraisal to
establish the characteristics of the area and its surrounds, including information on the function,
form and qualities of an area… However, it will usually be necessary to undertake more detailed/up-
to-date surveys and assessments to get a full understanding of the site. This information will support
an analysis of options and inform decisions in relation to how the features of the area should shape
future development and how new development will integrate within its context.’
A detailed and through assessment has been carried out in preparing this planning application.
This development has been designed in a harmonised way considering ecological, physical and
socio-economic characteristics of the area resulting in a housing development which is easily
navigated, spacious private and public open space which is overlooked by all dwellings given it a RECEIVED: 29/10/2025
Page 15 of 25
Consulting Engineers
Building Surveyors
Architects
sense of security as well as a cluster of housing with a good mix of houses types which creates a
diverse and intergenerational housing community and a development that easily integrates into the
existing surrounding built environment.
The Guidelines encourages densities of 40-100 dwellings per hectare for Key towns/ large towns
(>5,000 population) – suburban/ urban extension and 40-100 dwellings per hectares for centre and
urban neighbour hoods.
The design of the proposed development has an overall density of 21 dwellings per hectare. This
scheme provides a good alternative to dispersed one off houses in the rural countryside.
Monaghan County Council Development Plan 2025-2031
Monaghan town is an established Tier 1 Principal/ key town. The site is within the designated
settlement envelope and is currently zoned a Residential A.
The Principal Town Objective SHO 1 is ‘To facilitate the development of Monaghan Town in order
to maintain its position as the Principal/Key Town in the County at the top of the settlement
hierarchy and to ensure that its population and development growth takes place
in an orderly and sustainable manner.’
It is considered that this development is sustainable in that it is utilising a zoned infill site that will
compliment and enhance the existing surrounding built environment.
The councils core strategy is set out below in table 2.5: RECEIVED: 29/10/2025
Page 16 of 25
Consulting Engineers
Building Surveyors
Architects
It is clear that the scale and nature of this proposed housing development will help achieve the
desired housing levels of the area but not to an extent that would be contrary to the above Core
Strategy Policy.
RECEIVED: 29/10/2025
Page 17 of 25
Consulting Engineers
Building Surveyors
Architects
Urban Design Assessment
The following sections demonstrate how the proposed development corresponds to the 12 criteria
of best architectural practice as listed in the Urban Design Manual (2009).
1. Context
The site is located to the west of Monaghan town centre and is an infill site within two existing
residential settlements to the North and South, Manor Wood and Tully Estate. This ensures zoned
gap site is ultilised rather than on the outer edge of the settlement envelope of the town aiding
urban sprawl.
Monaghan with a town and environs population of 7,894 is the largest town in the County and is
strategically located at the intersection of the N2 Dublin – Derry/Letterkenny route and N12/N54
routes which link Belfast to Galway and the Midlands.
The land use zoning is ‘Residential A’ as defined on the Monaghan Town (Map MTDP1) of
Monaghan County Development Plan 2025 -2031. The adjacent lands to the West is of the site is
agricultural lands zoned as ‘Strategic Residential Reserve’. To the east of the site is the N2
Monaghan Town bypass, beyond which the adjacent land is in agricultural use. To the West there
is private residential dwellings.
It is an objective of the Proposed Residential A zone within the plan to ‘Provide for new residential
development and for new and improved ancillary services.’
The site comprises 2.39 Hectares of greenfield site. Constraints exist such as steep sloping site
and surrounding residential developments.
The dwelling proposed are a mix of single and two storey detached and terraced style units. Each
dwelling has its own parking spaces, private amenity space and is of sufficient size to meet all
relevant space requirements.
Principles dictating the layout and quality of the design are based on delivering a well-integrated
housing development respectful of the town’s existing characteristics and respectful of the existing
adjacent development. All residential units are dual or triple aspect. RECEIVED: 29/10/2025
Page 18 of 25
Consulting Engineers
Building Surveyors
Architects
2. Connections
The location of the development within Monaghan Town will provide residents with good
connections to a wide range of local facilities and the public transport network. Town centre living
promotes walking and cycling among residents which reduces the impact of vehicular traffic on
local roads in the area.
The proposed access vehicular road through the proposed development, is accessed via from the
Glen Road R188 through the existing housing development and has been designed in accordance
with DMURS requirements with traffic calming measures in place to deter speeding and prioritise
and encourage pedestrian movement. A traffic and transport assessment has been undertaken and
can be referred to within the Further Information submission. The proposed site is less than 15-
minute walking distance of Monaghan’s town centre. There are proposed pedestrian footpaths on
site to connect to existing footpaths along the Dublin Road providing access to the centre. The site
is within 9-minutes walking distance to the Ulster Canal Greenway.
The proposed site is also in walking distance of local and regional bus routes as show below:
RECEIVED: 29/10/2025
Page 19 of 25
Consulting Engineers
Building Surveyors
Architects
3. Inclusivity
There is a broad mix of proposed dwellings from single storey to two storey, detached and
terraced and 2 bedrooms to 4 bedrooms. These mixed housing units are proposed to meet the
aspirations of a range of people and households.
The scheme has been developed with due regard to the principles of universal design to achieve
a layout enabling easy access by all. All dwellings have level access and any changes in level
have been designed in accordance to the recommendations of TGD Part M. The design and
layout of all public areas is Part M compliant and easily negotiated internally on foot or by bicycle
so that the scheme is accessible and open to all. There is a clear definition between amenity
spaces, footpaths and roads to provide good separation of pedestrian and vehicular traffic. Where
a shared surface is proposed around the public open space there are pedestrian step-off zones
providing safe access to each of the dwellings. Unit types A and J are bungalows they are
designed to universal design with elderly or less abled bodied people in mind.
The public open space is accessible and open to all of the occupants and will help to promote
social interaction. The general layout of the housing has been considered so that dwellings are RECEIVED: 29/10/2025
Page 20 of 25
Consulting Engineers
Building Surveyors
Architects
orientated to provide passive surveillance over the public amenity spaces, access road and
footpaths within the development. Good passive surveillance is proven to negate anti-social
behaviour. New dwellings present a positive aspect to passers-by, with no unnecessary physical
and visual barriers.
4. Variety
The mix of dwellings proposed will compliment the limited number of existing housing stock within
the vicinity of the site and wider town setting.
Mixed communities can be created by providing a range of unit types as the proposed units will
be suitable for both young and old tenants including different familiy sizes. This housing
development proposes 10 no. varied house types with a range of number of bedrooms and
overall capacity and is in line with Monaghan County Development Plan 2025 – 2031 Dwelling
Soft landscaping will incorporate a range of planting of herbaceous plants, shrubs, tree’s and
lawns. This aims to promote biodiversity value and visual amenity and variety all year round.
5. Efficiency
The site comprises 2.39 ha of greenfield land and is currently zoned as Proposed Residential A
within the current Monaghan County Development Plan 2025 – 2031. There are 49 no. units
proposed, mainly semi-detached. Overall, the proposed site density is 21 dwellings per hectare
(49 units in 2.39ha).
The proposed density within the scheme takes into account proximity to the town centre as well
as the objectives of good design. We feel that this level of density is appropriate for this site so as
not to detract from the quality of living of the residents and protect the established character and
amenities of adjacent residential area. The development of this site considered a gap site
between existing residential developments should be looked favourably on over a new greenfield
site on the outskirts of the town.
All units within the scheme are designed with efficient use of plot area and in respect of building
regulations so that they meet the highest design standards. Gardens have been positioned to the
rear of the units to provide maximum privacy for the tenants. Landscaped public open space area
and biodiversity corridor is designed to provide amenity and biodiversity, protect buildings and
spaces from the elements and incorporate sustainable urban drainage systems. RECEIVED: 29/10/2025
Page 21 of 25
Consulting Engineers
Building Surveyors
Architects
The windows particularly to living spaces have been sized to make the most use of solar gain and
all units are either dual or triple aspect which makes the best use of solar gain throughout the
day.
6. Distinctiveness
The scheme makes the most of existing landform to create a distinctive layout that establishes a
strong identity for the area and is a positive addition to the locality. The public open space
including the formal play area will provide an excellent amenity for the residents. A variety of
house types in different configurations make for a diverse streetscape within the development but
are also very different to the existing surrounding residential developments this ensures that
residents can form an emotional attachment to their own home within the wider built environment.
The proposed materials are a mixture of brick and white render and will add variety and
distinctiveness to the different house types and units. The proposed varied pitched roofscapes
compliment the roofscapes of the adjacent neighbours’ dwellings to the North and South of the
site and thus provides a positive addition to the identity of the locality. When completed it is
anticipated that the scheme will become a distinct residential community with a prominent sense
of place unique to this site.
7. Layout
The Layout has been directly informed by planning policy and guidelines in relation to creating
vibrant community neighbourhoods. Integration into the wider urban context is achieved through a
considered design response to the existing adjacent neighbouring dwellings and site specific
conditions such as views, topography, and all other design influencing factors.
The layout of the scheme focuses activity on the proposed access route by creating active
frontages with front doors directly serving the parking area and also directly addressing the public
open green space to the centre of the site. Generous footpaths are proposed and landscaped
spaces so that residents have places to stop and talk to neighbours with space to step in with
prams etc. The vehicular access routes have traffic calming features, this will discourage high
speeds and prioritise pedestrian movement with sufficient crossings some of which are raised for
speed reduction at junctions. The public open space will be accessible by all. This space will be
clearly distinguished from the private amenity space for each resident which are all located
predominantly to the rear of the proposed dwellings to maximise their privacy from surrounding
properties.
RECEIVED: 29/10/2025
Page 22 of 25
Consulting Engineers
Building Surveyors
Architects
8. Public Realm
The built environment has been designed to be attractive and safe for residents. There is a clear
definition between public, semi private, and private space. High quality materials are chosen to
define the interfaces between these areas to enhance the overall perception of public realm.
The proposed new access road joins the Glen Road R188. This new access road connects the
new dwellings to the existing neighbourhood. Pedestrian footpaths and connections are provided
leading into and throughout the site.
All publicly accessible areas are overlooked by other residents (natural surveillance from
windows) who would be able to intervene or raise the alarm to prevent crime and maintain public
safety.
The public open space includes pathways following the desire lines of the site. Roads and parking
areas are considered as an integral landscaped element in the design of the public realm and
have been assessed within the Traffic and Transport Assessment and Quality Audit included
within the Further Information Response. The public open space that is proposed provides 15%
public open space which is at the upper end of that specified in Sustainable Residential
Development and Compact Settlements Guidelines for Planning Authorities 2024 and a formal
play area where more than 40no. units are proposed as per Monaghan County Council
Development Plan 2025-2031.
The public amenity space will be appropriately landscaped and allow for pedestrian connections
across the site. The open spaces are overlooked by proposed dwellings for passive surveillance.
9. Adaptability
The layout of each of the houses are such that future extensions/ adaptations are feasible in
some aspect without ruining the character of the dwellings. All dwellings within the scheme are
designed with regard to minimum space requirements set out in the Design Manual for Quality
Housing (2022), Best Practice Guidelines - Quality Housing for Sustainable Communities, A
Universal Design Approach 2012 as amended and other relevant guidance documents. The
homes are energy-efficient and equipped for challenges anticipated from a changing climate and
suitable for adaption in the future without substantially altering their character or the character of
the development. Different unit types provided allow for lifetime living whereby people can trade RECEIVED: 29/10/2025
Page 23 of 25
Consulting Engineers
Building Surveyors
Architects
up or down within the scheme should the need arise. The units are also designed so that they can
be easily adapted as the needs of the users change over time.
10. Privacy and Amenity
Every dwelling within the scheme has access to an area of useable, private amenity space to the
rear of the property and dedicated parking bays and private landscaping to the front.
Rear gardens are enclosed by 2m high hit and miss treated timber fencing. As noted in the
Proposed layout Plan.
Each garden provides circa 50m² of private open space for the 2 bed units with exception of No.
13 which has 37m² which is still in excess of the min 30m² requirement, circa 70m2 of private
open space for the 3 bed units which is in excess of 40m² requirement and circa 70m² for 4 bed
units which is in excess of the 50m² requirement as outlined in the Sustainable Residential
Development and Compact Settlements Guidelines for Planning Authorities 2024.
The useable private outdoor space is directly accessible via each resident’s kitchen and dining or
living space. In line with Monaghan County Council Development plan 2025-2031 section 15.8.2
houses overlook streets, footpaths, pedestrian paths, cycle routes and open spaces. Houses
have been designed to ensure overlooking and overshadowing of adjoining properties is
minimised.
Under Separation Distances from Sustainable Residential Development and Compact
Settlements Guidelines for Planning Authorities 2024 a minimum separation distance of 16m
between opposing windows serving habitable rooms at the rear or side of houses above ground
floor level as applicable. Where opposing windows are provided this requirement is satisfied.
To the front of each unit there are two no. car parking spaces (dedicated to that unit). Each house
has a concrete footpath to the perimeter of their dwelling for access.
All residential units are dual or triple aspect providing residents with a great level of amenity within
their home. By ensuring that at least part of the unit receives direct sunshine for part of the day,
this typology reduces the need to make use of artificial lighting – thus improving the standard of
living inside and using less energy.
The proposed dwellings will be constructed to accommodate excellent levels of sound insulation,
thermal performance and all conveniences to suit modern day living.
Homes are designed to prevent sound transmission by appropriate acoustic insulation or layout.
The homes are designed to provide adequate storage space not only in bedrooms and stores but
sufficient kitchen storage volumes. RECEIVED: 29/10/2025
Page 24 of 25
Consulting Engineers
Building Surveyors
Architects
11. Parking
Car parking is proposed to be in close proximity of the home’s front door with each unit having 2no.
dedicated parking spaces immediately adjacent to their front doors.
Parked cars are overlooked by each of the housing units to maximise natural surveillance for
improved security.
All the proposed car parking spaces are perpendicular with minimum space dimensions of 2.5 x 5
metres (as per Monaghan CDP). Under the Monaghan CDP communal/ visitor car parking spaces
are not required to this development and electric vehicle charging points are only required (at a rate
of 1no. min space as per MCDP ATIP 4 policy) where communal car parking is provided in a
residential area which is not the case in this instance.
For bicycle storage all houses have private gardens for safe storage of these.
12. Detailed Design
The proposed housing is mainly 2 storey semi-detached housing units constructed using traditional
building methods. There are a number of single storey bungalow units these units are located to
the South of the site.
The use of high quality materials, including brick finish, coloured render and concrete roof tiles,
make for a high quality design and also a positive contribution to the locality, facilitate easy and
regular maintenance and reflect the local character of the area.
The landscape design facilitates the use of the public open spaces from the outset with good
pedestrian connectivity provided throughout the development.
Care has been taken over the siting of bin stores which in all cases will be to the rear of the dwellings
out of sight and under supervision of each homeowner. There are no flues proposed and the siting
of vents such as cooker extracts are to the rear of the dwellings in the majority of cases.
RECEIVED: 29/10/2025
Page 25 of 25
Consulting Engineers
Building Surveyors
Architects
Conclusion
The location of the proposed site is in an area with an established pattern of residential development
and is the infilling of an otherwise built up residential area.
In terms of the house designs, contemporary plans have been selected suitable for modern day
living with a contrast in elevations to create a diverse streetscape within the housing development.
Due to the location of the site, there are main public services in the vicinity of the site with service
providers confirming they have capacity for this development.
Notwithstanding the site constraints, we have endeavoured to provide a development which is of
high-quality design in relation to configuration, density, safety, privacy and private open space.
We hope that this report clearly demonstrates how the development will contribute to the town and
the local area and that there is more than sufficient infrastructure, community services, schools etc
to sustain this development.
The proposed development accords with the policies and objectives of the ‘Monaghan County
Development Plan’, the ‘National Planning Framework’, the ‘Regional Spatial and Economic
Strategy’, ‘Urban Design Manual- A Best Practise Guide’ as well as the ‘Sustainable Residential
Development and Compact Settlements Guidelines for Planning Authorities 2024’ and therefore
allows for the proper planning and sustainable development of the area.
I trust this will suffice all the information you require,
Yours sincerely,
________________________________________________
Nathan Anscombe BSc. (Hons) Build. Surv. SCSI, SEAI
Register Building Surveyor
For and on behalf of CS Pringle