HomeMy WebLinkAbout2560454 - Other Assessments
CORLEA, BALLYBAY, CO. MONAGHAN – A75 EK26
info@moffettarchitectural.ie
T: 042 97 56912 M: 087 661 0834
2
Planning Section,
No. 1 Dublin St.,
Monaghan
Co. Monaghan
Ref: 953
22/8/25
Statement on compliance with Policy AGP 1 (a) – (k)
and Section 15.13.1 of the Monaghan County
Development Plan 2025-2031
Development Description:
planning permission to; a) convert existing poultry house to use by laying-hens;
b) construct extension onto southern extent of existing poultry house & c)
construct a new laying-hen type poultry house with wash water tank, vertical
meal bin & other associated ancillary site works, at Tullyshelferty, Dunraymond,
Co. Monaghan.
a) It is demonstrated that the development is necessary for the running of the agricultural
enterprise.
This application is for the conversion of an existing turkey poult rearing house to laying hens,
along with the proposal to construct a second laying house. There are no other suitable
buildings available to the applicant.
b) It is located within or adjacent to existing agricultural buildings, unless it has been
clearly demonstrated that the development must be located elsewhere for essential
operational or other reasons.
The proposal is clustered in the same farmyard, with the proposed house being alongside the
existing poultry house.
RECEIVED: 12/11/2025
2
c) The appearance, design, scale and materials are appropriate to its location and
sympathetic to the locality and adjacent buildings.
The proposed shed will be of the same size & finish as existing turkey housing within the same
farmyard complex. See site layout plan drawing for location of same.
d) The proposal visually integrates into the local landscape and additional landscaping is
provided where necessary.
The proposal will be located on the site of an existing poultry house. There is existing natural
screening of the site to the North West of the site which will minimise the view of the proposed
shed from the public road to the West. The existing hedgerows will be fully retained.
e) The proposal will not have an adverse impact on the natural or built heritage.
There are no known listed buildings within the vicinity of the proposal. There are no natural
features of note or significance or note in the vicinity of the site. There is therefore no impact
envisaged on any natural or built heritage due to this proposal.
f) The proposal will not result in a detrimental impact on the amenity of residential
dwellings (for example, noise, smell and pollution impacts) outside of the holding.
The proposal is located within 100m of one third party dwelling only. See attached letter of
consent from owner of same. The next nearest third party dwelling is over 300m away from the
proposed shed. The nature of the proposal is similar to that already existing on site.
g) Where a development is proposed within 100m of any residential property not located
on the holding within the rural area (i.e. outside of a designated settlement) written
consent from the adjoining property owner stating there is no objection to the proposal
and witnessed by a Solicitor or a Peace Commissioner must be provided.
See letter attached.
h) The proposal will not result in a pollution threat to sources of potable water, water
courses, aquifers, or ground water.
The proposal will be constructed so that no soiled water enters ground / surface water. All
soiled & wash water will be directed to the proposed underground reinforced, watertight
concrete tank, via underground pipes. Storm drainage is piped underground to a bypass
separator. RECEIVED: 12/11/2025
3
i) Proper provision for disposal of liquid and solid waste is provided.
All soiled & wash water will be directed to the proposed underground reinforced, watertight
concrete tank, via underground pipes. Storm drainage is piped underground to a bypass
separator.
j) Adequate machinery parking and circulation areas are provided.
Area available for manoeuvring of goods/delivery vehicles is increasing (vs existing
arrangement), see extent of proposed new concrete yard / apron on site drawings attached.
k) Where a new access is proposed and/or where there is an intensification of use of an
existing access, sight visibility splays shall comply with Table 15.4 Minimum Visibility
Standards of Section 15.27 of the Development Plan.
The proposed development is utilizing an existing agricultural access, as previously granted
planning permission. Existing entrance arrangement is unchanged from subsequent planning
applications on same site.
If you have any queries relating to any of the above, please do not hesitate to get in contact.
Many Thanks,
______________________________________
Stephen Moffett
BSc.Hons.Arch.Tech.&Mang.,Dip.Ind.
ARCHITECTURAL TECHNOLOGIST RECEIVED: 12/11/2025
Water Management Solutions
Bypass separators are
used when it is considered
an acceptable risk to not
provide full treatment for
very high ows, such
as, where the risk of a
large spillage and heavy
rainfall occurring at
the same time is small.
Typical applications
include surface
carparks, roadways and
lightly contaminated
commercial areas.
Performance & Compliance
› Fully compliant and tested to
EN 858-1.
› Bypass separators are
tested by British standards
institute (BSI).
› Certied ow and process
performance assessing
euent qualities to the
requirements of EN 858-1.
› The unit is designed to treat
the ‘rst ush’ - 10% of
peak ow. The calculated
drainage areas served by
each separator are indicated
according to the formula
given by PPG3 NSB =
0.0018A(m2).
› Class I separators are
designed to achieve a
concentration of less than
5mg per litre.
Klargester
Bypass
Separators
NSB RANGE
Model
Reference
Flow
(l/s)
Peak
Flow
Rate
(l/s)
Drainage
Area(M2)
Based on UK
rainwater ow
Storage
Capacity (Ltrs)Length
(mm)
Diameter
(mm)
Access
Shaft
Diameter
(mm)
Base
Inlet
Invert
(mm)
Base to
Outlet
Invert
(mm)
Standard
Fall Across
(mm)
Min
Inlet
Invert
(mm)
Standard
Pipework
Diameter
(mm)**Silt Oil
Polyethylene Chamber Construction
NSBP003 3 30 1670 300 45 1700 1350 600 1420 1320 100 500 160
NSBP004 4.5 45 2500 450 60 1700 1350 600 1420 1320 100 500 160
NSBP006 6 60 3335 600 90 1700 1350 600 1420 1320 100 500 160
GRP Chamber Construction
NSBE010 10 100 5560 1000 150 2069 1220 750 1450 1350 100 700 315
NSBE015 15 150 8335 1500 225 2947 1220 750 1450 1350 100 700 315
NSBE020 20 200 11111 2000 300 3893 1220 750 1450 1350 100 700 375
NSBE025 25 250 13890 2500 375 3575 1420 750 1680 1580 100 700 375
NSBE030 30 300 16670 3000 450 4265 1420 750 1680 1580 100 700 450
NSBE040 40 400 22222 4000 600 3230 1920 600 2185 2035 150 1000 500
NSBE050 50 500 27778 5000 750 3960 1920 600 2185 2035 150 1000 600
NSBE075 75 750 41667 7500 1125 5841 1920 600 2235 2035 200 950 675
NSBE100 100 1000 55556 10000 1500 7661 1920 600 2235 2035 200 950 750
NSBE125 125 1250 69444 12500 1875 9548 1920 600 2235 2035 200 950 750
* Some units have more than one access shaft – diameter of largest shown | ** Larger pipework available on request.
† Achieves concentration of less than 5MG/L
Technical Specications
Concentration
Less Than
5
MG/L
—
26
Product Benets
∙ Light and easy to install.
∙ Inclusive of silt storage volume.
∙ Fitted inlet/outlet connectors.
∙ Vent points within necks.
∙ Oil alarm system available (required by
EN 858-1 and PPG3).
∙ Extension access shafts for deep inverts.
∙ Maintenance from ground level.
∙ GRP or polyethylene construction
(subject to model).RECEIVED: 12/11/2025
RECEIVED: 12/11/2025
Directors: A. McCartney, M. McCartney
Co. Reg. No: 238468 Ireland VAT Reg. No: IE 8238468 B
McCartney Contractors Ltd.
Rosehill
Mullagh
Kells
Co. Meath
A82 E6F3
Tel: 046 924 4444
www.drydoc.ie
27th August 2025
Declan McEntee
To Whom It May Concern,
This is to confirm that McCartney Contractors Ltd. removes poultry litter from Declan McEntee’s
exiting poultry unit and will remove litter from any new unit as required. Litter is transported and
delivered to arable sites in accordance with Animal By-Product Regulations.
Our DAFM registration number for the activities is HAC 2338.
If you require any further information, please let me know.
Yours Sincerely,
AMcCartney
Andrew McCartney
RECEIVED: 12/11/2025
RECEIVED: 12/11/2025
RECEIVED: 12/11/2025
RECEIVED: 12/11/2025