Loading...
HomeMy WebLinkAbout2560458 - Other AssessmentsMONAGHAN LOCAL AUTHORITIES Water Protection Plan Checklist (To be accompanied by a Site Drainage Plan - Refer to Chapter 4 of Monaghan County Development Plan 2013-2019) General Site and Water Body Details Planning Ref. No. Applicant Brendan & Michelle Finnegan Townland Agheeshal, Broomfield, Castleblayney Water Supply Source X Co-ordinate 1 683361 Y Co-ordinate 1 814636 WMU 2 RWB 2 WB Status 2 Objective 2 Groundwater Vulnerability 3 High to extreme Aquifer Importance 3 Poor Proximity to nearest watercourse (culverted or open), wetland or lake (meters) 0m Proposed Development Is the development entirely or part of one of the following? (tick) Domestic dwelling √ Agricultural (cattle/dairy) Industrial-food related Public Works Agricultural (mushrooms) Industrial-non food Housing Agricultural (poultry) Quarrying/extractive industries Institutional Agricultural (piggery) Transport related Commercial/Retail Other agricultural – specify below Filling station/Fuel depot Mixed Use Development Other Waste Water Production and Treatment Method Domestic type waste waters Public Sewer Waste waters produced from any trade, food, preparation or business 4 n/a Wheel wash, vehicle wash, cooling waters n/a Waste waters produced from quarrying etc 4 n/a Other waste waters 4 none Construction phase waste waters other Frequently asked questions for septic tanks may assist in the “fit for purpose” assessment refer to http://www.monaghan.ie/en/services/environment/water/waterawareness/faqforseptictanks/ Fuel or Outdoor Material Storage for Non Domestic Developments Number of fuel storage tanks existing or proposed on site? n/a Are fuel storage tanks bunded 5? n/a Detail liquid / feedstuffs / organic / chemical / waste oil storage on outdoor sites n/a Hard Surface and Open Yard Areas for Non Domestic Developments Footprint of proposed development including yard areas in m2 n/a Is there potential for soiled yard areas from material, product waste or manure handling, fuel dispensing, silt and soil, yard washing etc. n/a If yes, are silt trap(s), interceptor(s), soiled water tanks or other control measures shown on drainage plan? n/a Has the use of SUDS (Sustainable Urban Drainage Systems – http://www.susdrain.org ) been considered in the design of this n/a RECEIVED: 14/11/2025 development? Development History – All Developments Have previous pollution prevention planning conditions been complied with 6? yes Does existing development have an up to date (as constructed) site drainage plan? yes Is the existing/proposed development sewered or unsewered? sewered If unsewered, is the existing wastewater treatment system fit for purpose7? N/A Has the storm water drainage system been examined and/or surveyed for misconnections? (Information leaflet available from Environment Section) N/A Checklist of items to be included on Site Drainage Plan Location of lakes, watercourse, wells used for water supply, or karst features on or within 25m of domestic or 100m of non domestic development site √ Location of all drainage outfall points √ Foul water drainage system (in Red) √ Storm water drainage system (in Blue) √ Soiled yard area, soiled water drainage and management system, including silt traps, oil interceptor(s) and any SUDS facilities √ Location of waste water treatment facilities √ Location of fuel storage tank(s) √ Stream/Lake/Wetland/Riparian Corridors √ Footnotes and Useful Information 1 Projection in the Irish Grid 2 WMU, RWB, WB status. Objectives available on water maps at www.wfdireland.ie 3 Available in the public mapping section at www.gsi.ie 4 For information leaflets on Business Premises and Proper Use of Drains and information on discharge licensing see: http://www.monaghan.ie/contentv3/services/environment/formsguidesdocumentsdownlands/ http://www.monaghan.ie/contentv3/services/environemtn/water/waterawareness/leaftletsandguidelines/ 5 Guidance: www.envirocentre.ie Best practice for Oil Storage (BPGCS05) 6 Has certification of installation for previously granted wastewater treatment system been required and if so has it been submitted. 7 Refer to EPA Guidance at: http://www.monaghan.ie/contentv3/services/environment/water/waterawareness/faqforseptictanks/ and http://www.monaghan.ie/contentv3/media/monaghanie/content/files/pdf/environment/Water Pollution&DrainageSystems.pdf 8 Refer to Water Body, Sensitive Waters and Sensitive Land Maps in Chapter 4 of the Monaghan County Development Plan 2013-2019 Abbreviations WMU Water Management Unit RWB River Water Body WB Status Water Body Status IPPC Integrated Pollution Prevention Control Licence EIA Environmental Impact Assessment For Office Use: Sensitivity of Location Is the development located upstream of a high river quality site 8? Is the development located within a good status waterbody 8? Is the development located in the catchment of a water supply source 8? Is the development located within the Source Protection Zone (SPZ) of a groundwater supply source 8? Does the development require a discharge licence to surface or ground waters under the Water Pollution Acts? Risk to waters in relation to scale of development, previous planning/environmental history, IPPC or EIA aspects, site management and location in a sensitive area Applicant:_______________________________ 20/08/2024 Agent:_________________________________ Date_____________ RECEIVED: 14/11/2025 Qty.Species Height (cm)Pot Size Density (cg) / (br) / (rb)Quality Specification Trees Mature - Advanced Heavy Standard Trees - Screen Planting 6 Liquidambar styraciflua 'Fastigiata' (Columnar Sweetgum)3 xtr / wrb / 25-30cmg / 4.50-5.00m ht.RB 5 Liriodendron tulipifera 'Fastigiata' (Columnar Tulip Tree)3 xtr / wrb / 25-30cmg / 4.50-5.00m ht.RB 9 Pinus sylvestris (Scot's Pine)3 xtr / wrb / 25-30cmg / 4.50-5.00m ht.RB 9 Acer campestre 'Elsrijk' (Field Maple)3 xtr / wrb / 25-30cmg / 4.50-5.00m ht.RB 29 36 Semi-mature Multi-stemmed Trees + Large Shrubs 4 Betula nigra 'Heritage' (River Birch)multi-stem / 3 x tr. / wrb / 2.50-3.00m ht RB 4 Hamamelis intermedia 'Jelena' (Witch Hazel)multi-stem / 3 x tr. / wrb / 2.00-2.50m ht RB 4 Amelanchier canadensis (Serviceberry)multi-stem / 3 x tr. / wrb / 2.50-3.00m ht RB 4 Arbutus unedo (Strawberry Tree, evergreen)multi-stem / 3 x tr. / wrb / 2.00-2.50m ht RB 4 Syringa vulgaris (Lilac)multi-stem / 3 x tr. / wrb / 1.50-2.00m ht RB 20 Transplant, Container Grown and Whip Hedgerow Planting H3 Nutting + Fruit Hedging/Copse (mainly native broadleaf species, primarily Hawthorn, with naturalised Lilac and Field Maple for biodiversity reasons) 52 m2 area 49 linear metres 13 Malus sylvestris (Crab Apple)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks 104 Crataegus monogyna (Hawthorn)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks 13 Prunus avium (Wild Cherry)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks 13 Viburnum lantana (Wayfarer Tree)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks 13 Syringa vulgaris (Lilac)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks 13 Corylus avellana (Hazel)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks 13 Sambucus nigra (Elder)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks 13 Acer campestre (Field Maple)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks 13 Prunus spinosa (Blackthorn)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks 24 Lonicera periclymenum (Honeysuckle)60-80cm planted at 0.5m BR transplant 1+1: branched: 2 breaks 24 Rosa rubiginosa (Eglantine Rose, Sweetbriar)60-80cm planted at 0.5m BR transplant 1+1: branched: 2 breaks 24 Rosa canina (Dog Rose)60-80cm planted at 0.5m BR transplant 1+1: branched: 2 breaks 24 Rubus fruticosus (Blackberry/Bramble)60-80cm planted at 0.5m BR transplant 1+1: branched: 2 breaks Notes Timescale for Implementation of Soft Landscape Works Abbrevations: xtr.wrb. wire root-balled m.metre cmg. girth of tree in centimeters measured 1m above ground ht.height 2ltr cg. plants supplied in 2 litre volume containers s.spread cvs.cultivated varieties br bare-root transplant subsp. subspecies cg container-grown number of transplants in Exact dates for completion of works will be finalised after the award of the construction programme. The construction of hardworks shall be carried out in tandem with the main construction programme whereby care is taken to avoid unneccessary machinery traffic on completed areas. Any subsoil and/or topsoil stripping and storage shall be done prior to commencement of construction of roads, buildings, services, etc. No works in relation to grading and topsoiling shall be carried out in conditions where materials are wet. Any stockpiling of soil shall not exceed 1.50m in height to avoid compaction. The Landscape Contractor shall execute his works in conformity with a programme to be agreed with the Landscape Architect and shall include in his estimate for working within an agreed time limit. The Landscape Contractor shall allow for keeping individual areas adequately maintained until the whole has been completed. If exceptional weather conditions occur after planting, e.g. heavy frosts, measures shall be taken as approved by the Landscape Architect. Inspect tree ties in spring and autumn and adjust tree ties to prevent constriction of the stem. After two growing seasons the tree should make sufficient root growth to anchor the tree and the stake can be removed. Irish-grown species (not imported) Irish-grown species (not imported) PLANTING SCHEDULE - refer to Planting Details drawings Apply fertiliser a season after planting if the soil is poor or if a boost to growth is required. All excavation, back-filling and top-soiling works to be completed when appropriate during the works programme. Topsoiling shall be carried out in areas where the underground service works and hardworks are complete so that no undue disturbance to topsoiled areas is ensured. Planting is best done between October and April (the planting season), and all soft landscape works should be completed during the next planting season after the completion of the works (if the construction works finish outside the planting season). Landscape work shall take place in the appropriate season and only when the conditions are suitable, i.e. it is dull, moist and mild, without undue risk of frost or drying winds. There shall be no cultivation or planting when the soil is frozen or waterlogged. Bare-root and root-balled trees, transplants and shrubs are only available in autumn and winter. Planting of bare-root and root-balled stock shall take place in the following planting season from the completion of topsoil works; namely November - March. Container-grown stock and grass seeding shall be carried out in the appropriate weather conditions following completion of topsoil works. Container-grown plants can be planted at any time of the year, but are easier to care for if planted in autumn or winter, as they need less watering than ones planted in spring or summer. Excavate proposed planting areas to min. 525mm depth and break up the base of the planter to ensure free drainage. Back-fill with min. 450mm depth multi-purpose grade topsoil to BS:3882 as per Planting Details drawing and top with black 'Weed-Guard' by Terram landscape fabric 90gs/m2 and 75mm depth medium-grade bark mulch topping. Finish top of bark mulch 25mm below adjacent landscape finish. To be planted in species groups of approx 5. Screed existing vegetation and notch plant in a double staggered row, 450mm between rows, 450mm centres, notch planted with rabbit protection and staked. Provide protective fencing to young hedgerows, 1.20m ht sweet Clear-stemmed to min. 2.50m height or multi- stemmed/feathered as per schedule, triple long-staked. Provide 1.00m depth root barrier 'ReRoot 1000' by GreenBlue Urban within 2.00m of walls, services and/or paving. Provide irrigation/ventilation pipe to encircle rootball, Multi-stemmed with min. 3 stems/feathered as per schedule, double-staked as per Planting Details B. Provide irrigation/ventilation pipe to encircle rootball, with 'TreeGator' slow release watering bag. RECEIVED: 14/11/2025