HomeMy WebLinkAbout2560458 - Other AssessmentsMONAGHAN LOCAL AUTHORITIES
Water Protection Plan Checklist
(To be accompanied by a Site Drainage Plan - Refer to Chapter 4 of Monaghan County
Development Plan 2013-2019)
General Site and Water Body Details
Planning Ref. No. Applicant Brendan & Michelle
Finnegan
Townland Agheeshal,
Broomfield,
Castleblayney
Water Supply Source
X Co-ordinate 1 683361 Y Co-ordinate 1 814636
WMU 2 RWB 2
WB Status 2 Objective 2
Groundwater
Vulnerability 3
High to extreme Aquifer Importance 3 Poor
Proximity to nearest watercourse (culverted or open), wetland or lake
(meters)
0m
Proposed Development
Is the development entirely or part of one of the following? (tick)
Domestic dwelling √ Agricultural
(cattle/dairy)
Industrial-food related
Public Works Agricultural
(mushrooms)
Industrial-non food
Housing Agricultural (poultry) Quarrying/extractive
industries
Institutional Agricultural (piggery) Transport related
Commercial/Retail Other agricultural –
specify below
Filling station/Fuel depot
Mixed Use Development Other
Waste Water Production and Treatment Method
Domestic type waste waters Public Sewer
Waste waters produced from any trade,
food, preparation or business 4
n/a
Wheel wash, vehicle wash, cooling waters n/a
Waste waters produced from quarrying
etc 4
n/a
Other waste waters 4 none
Construction phase waste waters other
Frequently asked questions for septic tanks may assist in the “fit for purpose” assessment refer
to http://www.monaghan.ie/en/services/environment/water/waterawareness/faqforseptictanks/
Fuel or Outdoor Material Storage for Non Domestic Developments
Number of fuel storage tanks existing or proposed on site? n/a
Are fuel storage tanks bunded 5? n/a
Detail liquid / feedstuffs / organic
/ chemical / waste oil storage on
outdoor sites
n/a
Hard Surface and Open Yard Areas for Non Domestic Developments
Footprint of proposed development including yard areas in m2 n/a
Is there potential for soiled yard areas from material, product waste
or manure handling, fuel dispensing, silt and soil, yard washing etc.
n/a
If yes, are silt trap(s), interceptor(s), soiled water tanks or other
control measures shown on drainage plan?
n/a
Has the use of SUDS (Sustainable Urban Drainage Systems –
http://www.susdrain.org ) been considered in the design of this
n/a RECEIVED: 14/11/2025
development?
Development History – All Developments
Have previous pollution prevention planning conditions been complied with 6? yes
Does existing development have an up to date (as constructed) site drainage
plan?
yes
Is the existing/proposed development sewered or unsewered? sewered
If unsewered, is the existing wastewater treatment system fit for purpose7? N/A
Has the storm water drainage system been examined and/or surveyed for
misconnections? (Information leaflet available from Environment Section)
N/A
Checklist of items to be included on Site Drainage Plan
Location of lakes, watercourse, wells used for water supply, or karst features on
or within 25m of domestic or 100m of non domestic development site
√
Location of all drainage outfall points √
Foul water drainage system (in Red) √
Storm water drainage system (in Blue) √
Soiled yard area, soiled water drainage and management system, including silt
traps, oil interceptor(s) and any SUDS facilities
√
Location of waste water treatment facilities √
Location of fuel storage tank(s) √
Stream/Lake/Wetland/Riparian Corridors √
Footnotes and Useful Information
1 Projection in the Irish Grid
2 WMU, RWB, WB status. Objectives available on water maps at www.wfdireland.ie
3 Available in the public mapping section at www.gsi.ie
4 For information leaflets on Business Premises and Proper Use of Drains and information on
discharge licensing see:
http://www.monaghan.ie/contentv3/services/environment/formsguidesdocumentsdownlands/
http://www.monaghan.ie/contentv3/services/environemtn/water/waterawareness/leaftletsandguidelines/
5 Guidance: www.envirocentre.ie Best practice for Oil Storage (BPGCS05)
6 Has certification of installation for previously granted wastewater treatment system been
required and if so has it been submitted.
7 Refer to EPA Guidance at:
http://www.monaghan.ie/contentv3/services/environment/water/waterawareness/faqforseptictanks/ and
http://www.monaghan.ie/contentv3/media/monaghanie/content/files/pdf/environment/Water
Pollution&DrainageSystems.pdf
8 Refer to Water Body, Sensitive Waters and Sensitive Land Maps in Chapter 4 of the
Monaghan County Development Plan 2013-2019
Abbreviations
WMU Water Management Unit
RWB River Water Body
WB Status Water Body Status
IPPC Integrated Pollution Prevention Control Licence
EIA Environmental Impact Assessment
For Office Use: Sensitivity of Location
Is the development located upstream of a high river quality site 8?
Is the development located within a good status waterbody 8?
Is the development located in the catchment of a water supply source 8?
Is the development located within the Source Protection Zone (SPZ) of a groundwater
supply source 8?
Does the development require a discharge licence to surface or ground waters under the
Water Pollution Acts?
Risk to waters in relation to scale of development, previous planning/environmental history,
IPPC or EIA aspects, site management and location in a sensitive area
Applicant:_______________________________
20/08/2024
Agent:_________________________________ Date_____________ RECEIVED: 14/11/2025
Qty.Species Height (cm)Pot Size Density (cg) / (br) / (rb)Quality
Specification
Trees
Mature - Advanced Heavy Standard Trees - Screen Planting
6 Liquidambar styraciflua 'Fastigiata' (Columnar
Sweetgum)3 xtr / wrb / 25-30cmg / 4.50-5.00m ht.RB
5 Liriodendron tulipifera 'Fastigiata' (Columnar Tulip
Tree)3 xtr / wrb / 25-30cmg / 4.50-5.00m ht.RB
9 Pinus sylvestris (Scot's Pine)3 xtr / wrb / 25-30cmg / 4.50-5.00m ht.RB
9 Acer campestre 'Elsrijk' (Field Maple)3 xtr / wrb / 25-30cmg / 4.50-5.00m ht.RB
29
36
Semi-mature Multi-stemmed Trees + Large
Shrubs
4 Betula nigra 'Heritage' (River Birch)multi-stem / 3 x tr. / wrb / 2.50-3.00m ht RB
4 Hamamelis intermedia 'Jelena' (Witch Hazel)multi-stem / 3 x tr. / wrb / 2.00-2.50m ht RB
4 Amelanchier canadensis (Serviceberry)multi-stem / 3 x tr. / wrb / 2.50-3.00m ht RB
4 Arbutus unedo (Strawberry Tree, evergreen)multi-stem / 3 x tr. / wrb / 2.00-2.50m ht RB
4 Syringa vulgaris (Lilac)multi-stem / 3 x tr. / wrb / 1.50-2.00m ht RB
20
Transplant, Container Grown and Whip Hedgerow Planting
H3
Nutting + Fruit Hedging/Copse (mainly native
broadleaf species, primarily Hawthorn, with
naturalised Lilac and Field Maple for biodiversity
reasons)
52 m2 area 49 linear metres
13 Malus sylvestris (Crab Apple)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks
104 Crataegus monogyna (Hawthorn)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks
13 Prunus avium (Wild Cherry)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks
13 Viburnum lantana (Wayfarer Tree)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks
13 Syringa vulgaris (Lilac)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks
13 Corylus avellana (Hazel)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks
13 Sambucus nigra (Elder)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks
13 Acer campestre (Field Maple)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks
13 Prunus spinosa (Blackthorn)40-60cm transplants 4 per m2 BR transplant 1+1: branched: 2 breaks
24 Lonicera periclymenum (Honeysuckle)60-80cm planted at 0.5m BR transplant 1+1: branched: 2 breaks
24 Rosa rubiginosa (Eglantine Rose, Sweetbriar)60-80cm planted at 0.5m BR transplant 1+1: branched: 2 breaks
24 Rosa canina (Dog Rose)60-80cm planted at 0.5m BR transplant 1+1: branched: 2 breaks
24 Rubus fruticosus (Blackberry/Bramble)60-80cm planted at 0.5m BR transplant 1+1: branched: 2 breaks
Notes Timescale for Implementation of Soft Landscape Works
Abbrevations:
xtr.wrb. wire root-balled
m.metre cmg. girth of tree in centimeters measured 1m above ground
ht.height 2ltr cg. plants supplied in 2 litre volume containers
s.spread cvs.cultivated varieties
br bare-root transplant subsp. subspecies
cg container-grown
number of transplants in
Exact dates for completion of works will be finalised after the award of the construction programme. The construction of hardworks shall be carried out in tandem with the main
construction programme whereby care is taken to avoid unneccessary machinery traffic on completed areas.
Any subsoil and/or topsoil stripping and storage shall be done prior to commencement of construction of roads, buildings, services, etc. No works in relation to grading and
topsoiling shall be carried out in conditions where materials are wet. Any stockpiling of soil shall not exceed 1.50m in height to avoid compaction.
The Landscape Contractor shall execute his works in conformity with a programme to be agreed with the Landscape Architect and shall include in his estimate for working within
an agreed time limit. The Landscape Contractor shall allow for keeping individual areas adequately maintained until the whole has been completed.
If exceptional weather conditions occur after planting, e.g. heavy frosts, measures shall be taken as approved by the Landscape Architect.
Inspect tree ties in spring and autumn and adjust tree ties to prevent constriction of the stem. After two growing seasons the tree should make sufficient root growth to anchor the
tree and the stake can be removed.
Irish-grown species (not imported)
Irish-grown species (not imported)
PLANTING SCHEDULE - refer to Planting Details drawings
Apply fertiliser a season after planting if the soil is poor or if a boost to growth is required.
All excavation, back-filling and top-soiling works to be completed when appropriate during the works programme. Topsoiling shall be carried out in areas where the underground
service works and hardworks are complete so that no undue disturbance to topsoiled areas is ensured.
Planting is best done between October and April (the planting season), and all soft landscape works should be completed during the next planting season after the completion of
the works (if the construction works finish outside the planting season).
Landscape work shall take place in the appropriate season and only when the conditions are suitable, i.e. it is dull, moist and mild, without undue risk of frost or drying winds.
There shall be no cultivation or planting when the soil is frozen or waterlogged.
Bare-root and root-balled trees, transplants and shrubs are only available in autumn and winter. Planting of bare-root and root-balled stock shall take place in the following planting
season from the completion of topsoil works; namely November - March.
Container-grown stock and grass seeding shall be carried out in the appropriate weather conditions following completion of topsoil works. Container-grown plants can be planted
at any time of the year, but are easier to care for if planted in autumn or winter, as they need less watering than ones planted in spring or summer.
Excavate proposed planting areas to min. 525mm depth and break up the base of the planter to ensure free drainage. Back-fill with min. 450mm depth multi-purpose grade
topsoil to BS:3882 as per Planting Details drawing and top with black 'Weed-Guard' by Terram landscape fabric 90gs/m2 and 75mm depth medium-grade bark mulch
topping. Finish top of bark mulch 25mm below adjacent landscape finish. To be planted in species groups of approx 5. Screed existing vegetation and notch plant in a double
staggered row, 450mm between rows, 450mm centres, notch planted with rabbit protection and staked. Provide protective fencing to young hedgerows, 1.20m ht sweet
Clear-stemmed to min. 2.50m height or multi-
stemmed/feathered as per schedule, triple
long-staked. Provide 1.00m depth root barrier
'ReRoot 1000' by GreenBlue Urban within
2.00m of walls, services and/or paving. Provide
irrigation/ventilation pipe to encircle rootball,
Multi-stemmed with min. 3 stems/feathered as
per schedule, double-staked as per Planting
Details B. Provide irrigation/ventilation pipe to
encircle rootball, with 'TreeGator' slow release
watering bag. RECEIVED: 14/11/2025