Loading...
HomeMy WebLinkAbout2560432 - Report Received from Internal Staff - Public Lighting No 2 1 Planning Report To: Planning Section Reference: PR139 From: Kevin Carney Subject: 25-60432 Geda Construction Company Ltd, Tully, Monaghan, Co.Monaghan – Public Lighting Review Date: 18th November 2025 The Public Lighting Team have reviewed this application and request that further information be submitted in order for an informed decision to be made. Confirmation is required that the junction onto the public road has been designed to BS5489, Lighting Design Standards. The lighting report states that the Grid 1 has been designed to P3, confirmation is required that this is sufficient. Also, the results table on the lighting report for the junction are not fully legible as this is cut off in the submitted document on file. Confirmation is also required that the landscape plans have been reviewed and do not affect the proposed street lighting. ➢ A new junction onto a public road should be designed to BS5489, Lighting Design Standards, the position of all new and existing lighting columns should be considered regarding the sightlines on the junction onto the public road. ➢ Submit a Lighting Design Report for the development showing the new junction and road connecting it to the existing public road taking into account; the conflict area lighting requirements at the entrance with the public road, the footpath lighting requirements, the existing street lighting in place, ensure uniformity of lighting, minimise light spill into neighbouring private properties. ➢ Any concerns in the RSA regarding lighting should be incorporated into the lighting design. ➢ Include individual grid lighting reports for; the whole project, the development only, the road connecting it to the development and the junction with the existing road, and new footpath to be constructed on the public road. The Lighting Design Report shall be carried out by a competent, qualified Lighting Designer. The applicant must liaise with Monaghan County Council’s Public Lighting Officer regarding the specification of the existing street lighting in place. ➢ All lighting columns shall be placed on the inside/rear of footpaths to minimise physical obstruction to pedestrians and reduce risk of impact from vehicles and shall be placed in line with property boundaries or building lines. No lights, to be considered for future adoption by Monaghan County Council, shall be mounted on walls of any buildings ➢ All lanterns shall be accessible for maintenance purposes from hoist parked on the public road. In situations where this is not possible, then collapsible columns, capable of safe operation by one operator, shall be used. ➢ Submit a planting layout drawing clearly indicating exclusion zones where no planting of trees or shrubs will take place, i.e. there shall not be any mature tree within 6m horizontal distance of a 6m lighting column or within 8m horizontal distance of an 8m lighting column, etc. 2 Regards, Roads Section Kevin Carney Assistant Engineer