Loading...
HomeMy WebLinkAbout2560469 - Other Assessments - Planning Report FIND Proposed 850 kW Wind Turbine Connolly Meats Co. Monaghan, Ireland November 2025 Energy next to you PLANNING REPORT RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 Table of Contents 1. INTRODUCTION .......................................................................................................................................... 4 2. PROJECT RATIONALE AND NEED .................................................................................................................. 4 2.1 Overview ............................................................................................................................................................... 4 2.2 The Role of Wind Energy in Ireland ...................................................................................................................... 5 2.3 Site Wind Resource ............................................................................................................................................... 5 2.4 Company Context and Sustainability Commitments ............................................................................................ 6 2.5 National and Local Policy Alignment .................................................................................................................... 7 2.6 Planning Justification ............................................................................................................................................ 8 3. LEGISLATIVE AND POLICY FRAMEWORK..................................................................................................... 10 3.1 European Policy Framework ............................................................................................................................... 10 3.2 National Legislative and Policy Framework ........................................................................................................ 10 3.3 Regional Policy Framework ................................................................................................................................. 11 3.4 Local Policy Framework ...................................................................................................................................... 11 3.5 Compliance Summary ......................................................................................................................................... 11 3.6 Landscape Character and Visual Context ........................................................................................................... 12 3.7 Summary of Relevant Local Policies ................................................................................................................... 13 4. PROJECT DESCRIPTION .............................................................................................................................. 13 4.1 Overview of the Proposed Development ........................................................................................................... 13 4.2 Site Location and Context ................................................................................................................................... 13 4.3 Site Selection Process ......................................................................................................................................... 15 4.4 Construction and Installation Process ................................................................................................................ 16 4.5 Overhead Power Lines ........................................................................................................................................ 16 4.6 Drainage and Surface Water Management ........................................................................................................ 17 4.7 Ancillary and Ground Works ............................................................................................................................... 17 4.8 Wind Turbine Specifications ............................................................................................................................... 17 4.9 Operational Phase .............................................................................................................................................. 18 4.10 Decommissioning .............................................................................................................................................. 19 4.11 Background Site History .................................................................................................................................... 19 5. TECHNICAL AND ENVIRONMENTAL ASSESSMENTS ..................................................................................... 20 RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 5.1 Noise ................................................................................................................................................................... 20 5.2 Shadow Flicker effect .......................................................................................................................................... 22 5.3 Visual impact (ALVI) ............................................................................................................................................ 27 5.4 Ecology ................................................................................................................................................................ 33 5.5 Flood Risk ............................................................................................................................................................ 34 5.6 Traffic and Delivery ............................................................................................................................................. 35 5.7 Archeology in the Vicinity ................................................................................................................................... 37 5.8 Electromagnetic interference ............................................................................................................................. 38 5.9 Operation and Maintenance............................................................................................................................... 38 6. ENVIRONMENTAL MANAGEMENT SYSTEM, WASTE AND SAFETY ................................................................ 39 6.1 Environmental Management System ................................................................................................................. 39 6.2 Waste Management ........................................................................................................................................... 39 6.3 Safety Systems .................................................................................................................................................... 39 6.4 Decommissioning Plan ........................................................................................................................................ 40 7. GRID CONNECTION ................................................................................................................................... 40 8. PLANNING COMPLIANCE & BENEFITS ........................................................................................................ 41 9. CONCLUSION ............................................................................................................................................ 42 RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 1. INTRODUCTION Connolly Meats Limited seeks planning permission for the erection of a single 850 kW wind turbine within its operational lands at Dundrumman, Scotstown, County Monaghan (H18 KW18). The proposal has been prepared in accordance with the Planning and Development Acts 2000 (as amended) and the Monaghan County Development Plan 2019–2025. The proposed turbine will be located approximately 315 metres north of the existing Connolly Meats food - processing facility, about 4.2 kilometres north of Scotstown village and 11 kilometres west of Monaghan Town. This report presents a full and updated planning submission for the project, incorporating technical refinements and clarifications developed following the earlier 2024 planning application and subsequent engagement with the Planning Authority.It has been prepared to reflect the current legislative framework under the European Union (Planning and Development) (Renewable Energy) Regulations 2025 (S.I. No. 274 of 2025), which transpose the Renewable Energy Directive (RED III) into Irish law and es tablish a presumption in favour of renewable-energy developments serving the public interest. The purpose of the proposed development is to generate renewable electricity for on -site consumption, supporting Connolly Meats’ transition toward energy self-sufficiency and contributing to Ireland’s legally binding decarbonisation and climate-action targets. The forthcoming Monaghan County Development Plan 2025–2031, expected to come into effect in early 2026, continues this policy direction by reinforcing support for renewable -energy projects within established industrial landholdings. 2. PROJECT RATIONALE AND NEED 2.1 Overview The proposed development consists of a single 850 kW wind turbine to be installed within the operational lands of Connolly Meats Limited at Dundrumman, Scotstown, Co. Monaghan. The primary objective of the project is to generate renewable electricity for direct on-site use, thereby reducing dependence on grid-supplied energy and eliminating the current reliance on diesel backup generation. This initiative forms part of Connolly Meats’ long-term sustainability strategy to reduce its carbon footprint, improve energy efficiency, and secure a stable and predictable energy supply for its production operations. The proposed turbine is expected to supply a substantial portion of the facility’s annual electricity demand, contributing to a reduction of up to 30% in site -related CO₂ emissions. The project aligns with Ireland’s legally binding national targets under the Climate Action and Low Carbon Development (Amendment) Act 2021, including a 51% reduction in greenhouse gas emissions by 2030 and RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 carbon neutrality by 2050. It also supports the Climate Action Plan 2024, which promotes on -site renewable generation for industrial and commercial users as a means to achieve energy self -sufficiency and grid decarbonisation. Beyond its environmental benefits, the development provides long -term economic resilience to the company. By stabilising electricity costs and ensuring supply security, the project strengthens Connolly Meats’ competitiveness as a major local employer and food producer. The proposed wind turbine represents a balanced and sustainable investment that supports both national climate objectives and local economic development. Its integration within an established industrial site ensures efficient land use, minimises visual and environmental impacts, and demonstrates leadership in responsible energy management within the agri -food sector. 2.2 The Role of Wind Energy in Ireland Wind energy is Ireland’s most significant and cost -effective renewable electricity resource. It plays a central role in achieving national and European decarbonisation targets and in securing a stable, low -carbon energy supply. Electricity generation from wind produces no air or water pollutants and requires no water for cooling, making it one of the cleanest and most sustainable energy sources available. It also reduces dependency on imported fossil fuels, thereby strengthening national energy security and insulating consumers from international price volatility. According to the Sustainable Energy Authority of Ireland (SEAI), renewable electricity generation avoided approximately 6.2 million tonnes of CO₂ in 2021, of which around 4 million tonnes were attributed to wind energy alone. Wind power currently accounts for over one-third of Ireland’s total electricity demand and remains the primary driver of the State’s progress toward the national goal of 70% renewable electricity by 2030, as set out in the Climate Action Plan 2024. Technological advances in turbine design have made wind energy viable even in moderate -wind regions, improving efficiency and reducing operating costs. As a result, small to medium -scale turbines, such as the proposed 850 kW unit, can now deliver substantial on-site energy generation with minimal environmental impact. The proposed Connolly Meats turbine contributes to this national transition by producing clean electricity at source, directly offsetting fossil-fuel-based energy consumption. It represents a local implementation of Ireland’s wider renewable strategy, achieving measurable emission reductions while ensuring that economic and environmental benefits are retained within the community. 2.3 Site Wind Resource Wind resource data for County Monaghan confirms that the proposed site benefits from suitable and RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 consistent wind conditions to support small-scale renewable generation. Long-term measurements from the Met Éireann network indicate an average wind speed of approximately 7.5 metres per second at the site, which is appropriate for the efficient operation of the proposed 850 kW turbine. Prevailing winds are predominantly from the southwest, south, and west, with additional secondary flows from the northwest and southeast. This wind pattern ensures a steady and balanced resource, allowing the turbine to operate efficiently throughout the year. The wind rose diagram below prepared for Monaghan illustrates this directional distribution and confirms that the selected turbine orientation optimises energy capture under typical local conditions. The positioning of the turbine within the northern section of the Connolly Meats lan dholding was chosen to maximise exposure to the prevailing winds while maintaining appropriate separation distances from the factory, internal infrastructure, and public road boundaries. This assessment demonstrates that the site provides a technically sound and operationally efficient location for a single wind turbine development, capable of delivering reliable renewable electricity generation over its 25-year design life. The Wind Rose 2.4 Company Context and Sustainability Commitments Connolly Meats Limited is a long-established, family-run meat processing company located at Dundrumman, Scotstown, County Monaghan. Founded in the 1980s by Hugh Connolly, the company currently employs approximately 70 people and has become a key local employer and food producer. Its operations are energy- intensive, with high and continuous electricity demand associated with processing, refrigeration, and environmental management systems. In recent years, Connolly Meats has undertaken a series of initiatives aimed at improving resource efficiency RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 and environmental performance. These include the creation of a three-acre constructed wetland for the natural treatment of wastewater, which has enhanced local biodiversity and reduced reliance on mechanical treatment systems. The company has also implemented night-shift operations to optimise energy use during lower-demand periods, and it has received approval from ESB Networks for the installation of a new on-site MV substation, eliminating the need for diesel generators during peak loads. Further measures under development include the installation of roof-mounted solar panels and participation in Origin Green and Enterprise Ireland’s Green Start Programme, which focus on energy management, waste reduction, and carbon performance tracking. Through these programmes, the company is mapping its Scope 1 and 2 carbon emissions and developing performance indicators for energy and water efficiency. The proposed wind turbine forms a central component of this broader sustainability strategy. It will provide a direct source of renewable electricity to power the processing facility, thereby stabilising energy costs, reducing dependence on the national grid, and lowering greenhouse gas emissions. By integrating wind generation within its operational footprint, Connolly Meats demonstrates leadership in industrial decarbonisation and alignment with both national and EU renewable energy policy. The initiative also contributes to the long-term resilience and competitiveness of the business while supporting local employment and sustainable rural industry. 2.5 National and Local Policy Alignment The proposed development aligns fully with Ireland’s national and local policy objectives for renewable energy generation, energy security, and carbon reduction. It responds directly to the policy framework set out under the European Union (Planning and Development) (Renewable Energy) Regulations 2025 (S.I. No. 274 of 2025), which transpose the Renewable Energy Directive (EU) 2023/2413 (RED III) into Irish law. These regulations establish a presumption in favour of renewable energy developments of public in terest and require planning authorities to facilitate their timely assessment and delivery. National Policy Context The project supports the objectives of the Climate Action and Low Carbon Development (Amendment) Act 2021, which mandates a 51% reduction in greenhouse gas emissions by 2030 and carbon neutrality by 2050. It is consistent with the Climate Action Plan 2024, which calls for increased deployment of on-site renewable generation for industrial and commercial facilities to enhance energy resilience and reduce pressure on the national grid. The National Energy and Climate Plan (NECP) 2021–2030 and the Renewable Electricity Support Scheme (RESS) further reinforce Ireland’s commitment to expanding renewable generation capacity and promoting local participation in the transition to a low-carbon economy. The integration of wind energy within existing industrial facilities is explicitly encouraged as part of this strategy, supporting both decarbonisation and RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 regional competitiveness. Regional Policy Context At the regional level, the project aligns with the Regional Spatial and Economic Strategy (RSES) for the Northern and Western Region, which seeks to strengthen the region’s role in achieving renewable energy and climate adaptation targets. Policy Objective 7.3 promotes investment in renewable energy infrastructure to support balanced economic growth and reduce reliance on imported fuels. Local Policy Context Within the Monaghan County Development Plan 2019–2025, Policy ENP 2 supports the development of renewable energy projects that reduce greenhouse gas emissions, enhance energy efficiency, and contribute to a sustainable energy mix, provided that environment al, residential, and visual amenity considerations are appropriately addressed. The forthcoming Monaghan County Development Plan 2025–2031 continues this policy direction, reinforcing support for renewable generation within established industrial and commercial landholdings. While not yet adopted, the Draft has been published and continues the same policy direction as the current Plan, including strong support for small- and medium-scale renewable energy developments within existing industrial and commercial landholdings. The proposed development is therefore consistent with both the current statutory plan and the emerging policy framework. Technological and Industry Context Advancements in wind turbine technology now allow medium -scale turbines, such as the proposed 850 kW unit, to operate efficiently in moderate-wind locations, producing consistent power at reduced noise levels and with improved safety and reliability. Globally, wind energy has become one of the most cost -competitive forms of electricity generation, reflecting economies of scale, improved materials, and enhanced grid integration technologies. By combining on-site generation, environmental responsibility, and proven technology, the proposed development exemplifies the type of renewable infrastructure encouraged by current legislation and planning policy at all administrative levels. 2.6 Planning Justification The proposed development represents an appropriate, well-considered, and policy-aligned form of renewable energy infrastructure. Its design, siting, and purpose demonstrate clear compliance with both national and local planning policy objectives and with best-practice environmental and technical standards. The following factors underpin its suitability: - Appropriate Use within an Established Industrial Site RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 The turbine will be located within the operational boundary of a long -established meat processing facility. It does not introduce a new or incompatible land use but rather complements existing industrial activity. This ensures the development remains consistent with the functional character of the site and avoids intrusion into residential or agricultural lands. - Optimised Visual and Spatial Context The surrounding landscape already contains vertical and industrial features such as buildings, lighting columns, and utility poles, which help the proposed turbine integrate visually within its setting. Existing vegetation and on-site screening further mitigate its visibility from surrounding viewpoints, as confirmed by the Landscape and Visual Impact Assessment (ALVI). - Alignment with Climate and Energy Policy The development directly supports the objectives of Ireland’s Climate Action Plan 2024 and the Climate Action and Low Carbon Development (Amendment) Act 2021. It also aligns with Monaghan County Council’s Climate Adaptation Strategy 2019–2024, promoting renewable generation within the county to reduce vulnerability to energy price fluctuations and improve local energy security. - On-Site Renewable Generation and Grid Relief Electricity generated by the turbine will be consumed entirely on-site. This distributed generation model reduces pressure on the national grid, minimises transmission losses, and supports government objectives for self-sufficient renewable energy use in industrial operations. - Minimal Environmental and Community Impact Comprehensive noise, shadow flicker, and visual assessments confirm full compliance with national guidance thresholds. No sensitive receptors such as schools, hospitals, or protected habitats are located within the immediate vicinity. In addition, landowners within the small potential shadow zone have provided written consent, demonstrating awareness and local support for the project. - Reversibility and Decommissioning The turbine is a fully reversible form of development. At the end of its operational life (approximately 25 years), it will be decommissioned in accordance with the Construction and Environmental Management Plan (CEMP) and best-practice standards. Above-ground structures will be removed and the site reinstated to its original condition. - Monitoring and Operational Mitigation Connolly Meats will implement a programme of environmental monitoring post-construction, including verification of operational noise and shadow flicker performance. The turbine’s control system allows for curtailment if required to prevent or mitigate any potential adverse impact. - Local Economic and Employment Benefits The development supports the long-term viability of one of Monaghan’s key local employers. It will generate economic activity during construction and operation while reducing energy costs, improving competitiveness, RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 and contributing to Ireland’s low-carbon industrial transition. can be very cost-effective compared to conventional electricity suppliers, remains unaffected by price fluctuations, and offers substantial environmental benefits over traditional fuel sources. 3. LEGISLATIVE AND POLICY FRAMEWORK The proposed wind turbine development has been designed and assessed in accordance with the relevant European, national, regional and local planning policies that promote renewable energy generation, energy security and carbon reduction. The following framework outlines the main legislation and policy documents that support the project. 3.1 European Policy Framework The European Green Deal (2019) and the Renewable Energy Directive (EU) 2023/2413, known as RED III, establish binding commitments for Member States to accelerate the deployment of renewable energy and to achieve climate neutrality by 2050. In Ireland, these provisions are implemented through the European Union (Planning and Development) (Renewable Energy) Regulations 2025 (S.I. No. 274 of 2025), which introduce an expedited consent process and create a presumption in favour of renewable energy developments that serve the public interest. 3.2 National Legislative and Policy Framework At national level, the project supports the following key instruments: • Planning and Development Acts 2000, as amended, which provide the legal framework for assessing renewable energy proposals. • Climate Action and Low Carbon Development (Amendment) Act 2021, which sets a legally binding target of a 51 percent reduction in greenhouse gas emissions by 2030 and net zero by 2050. • Climate Action Plan 2024, which promotes on site renewable generation for industrial and commercial users and supports medium scale wind projects that improve energy resilience. • National Energy and Climate Plan 2021–2030, which identifies wind energy as a core component of Ireland’s renewable electricity pathway. • Renewable Electricity Support Scheme (RESS), which encourages the diversification of renewable energy ownership and local participation in generation. • National Planning Framework (NPF), which under National Policy Objective 55 seeks to promote renewable energy use and sustainable patterns of settlement and infrastructure. Noise, shadow flicker and visual impact have been assessed in accordance with current national standards and best practice for renewable energy development. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 3.3 Regional Policy Framework The Regional Spatial and Economic Strategy for the Northern and Western Region recognises renewable energy as a key element of regional development. Regional Policy Objective 7.3 encourages investment in wind energy infrastructure to strengthen the regional energy mix, reduce dependency on imported fuels and promote balanced rural growth. The proposed turbine contributes to these goals by generating low carbon electricity within an existing industrial site, supporting both regional economic activity and env ironmental objectives. 3.4 Local Policy Framework Within the Monaghan County Development Plan 2019–2025, the following policies are directly relevant: • Policy ENP 1 encourages renewable energy projects at suitable locations where visual and residential amenity are protected. • Policy ENP 2 promotes energy efficient measures in all new developments. • Policy ENP 3 supports renewable generation integrated with existing industrial and infrastructural uses. The forthcoming Monaghan County Development Plan 2025–2031, expected to take effect in 2026, maintains this policy direction and continues to promote renewable energy projects within established industrial and commercial landholdings. 3.5 Compliance Summary The proposed 850 kW wind turbine meets the intent of all relevant policy frameworks by: • Contributing directly to national and EU renewable energy and emissions reduction targets. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 • Integrating renewable generation within an existing industrial facility to optimise land use. • Complying fully with environmental assessment standards and amenity safeguards. • Demonstrating leadership in sustainable industrial development at local and regional levels. 3.6 Landscape Character and Visual Context The proposed site lies within Landscape Character Type 4, known as Farmed Foothills, as identified in the Monaghan County Development Plan 2019–2025. This landscape is characterised by gently rolling terrain, pasture and mature hedgerows with intermittent areas of coniferous forestry. The Landscape and Visual Impact Assessment concluded that the turbine would be well integrated within this working rural setting. It benefits from the existing vegetation, the varied topography and the presence of other industrial and vertical features in the surrounding area. The development is therefore consistent with the capacity and sensitivity of the local landscape character area. Landscape Character Assessment - LCT no 4 – Farmed Foothills RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 3.7 Summary of Relevant Local Policies The proposal accords with the Monaghan County Development Plan 2019–2025, particularly: • Policy ENP 1: Encourage renewable energy projects at suitable locations where visual and residential amenity are protected. • Policy ENP 2: Promote energy-efficient measures in development design. • Policy ENP 3: Support renewable generation integrated with existing industrial and infrastructural uses. The project satisfies these objectives by locating within an existing industrial site, maintaining appropriate setbacks and implementing mitigation measures for visual, noise and shadow -flicker impacts. It also supports the objectives of Chapter 8, Environment, Energy and Climate Change, which promote renewable energy as a means of reducing greenhouse-gas emissions while safeguarding landscape and community amenity. 4. PROJECT DESCRIPTION 4.1 Overview of the Proposed Development The proposed development comprises the erection of a single Vestas V52 wind turbine with a rated capacity of 850 kW, a hub height of 65 m, and a rotor diameter of 52 m, giving a maximum tip height of 91 m. The turbine will operate as a private embedded generation system, supplying renewable electricity directly to the Connolly Meats processing facility at Dundrumman, Scotstown, Co. Monaghan. There will be no export to the national grid. The development also includes all associated civil and electrical infrastructure: • Reinforced concrete turbine foundation. • Crane hardstanding area • Underground ducting and electrical cabling • Connection to the existing on-site ESB substation • Temporary construction compound and internal access track The project has been designed to meet the base electrical demand of the facility, supporting Connolly Meats’ transition to on-site renewable generation. 4.2 Site Location and Context The proposed turbine will be located approximately 350 m north of the existing Connolly Meats production plant, within the company’s landholding at Dundrumman, Scotstown, Co. Monaghan. The site lies within a rural working landscape characterised by gently rolling farmland, mature hedgerows and dispersed farmsteads. The immediate surroundings include existing industrial buildings and agricultural lands. This location was selected following a detailed assessment of wind conditions, topography, visual context and proximity to the existing substation. It offers: • A strong and consistent wind resource (average 7.5 m/s). • Adequate separation from residential dwellings, in compliance with all setback and safety RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 requirements. • Direct connection potential to the existing on -site substation (approx. 218 m). • 24-hour continuous electrical demand at the facility, ensuring efficient energy use. The turbine’s position ensures a minimum setback distance of 100.1 m from the adjoining public road (LT 60111), exceeding the safety guideline of a distance equal to the full turbine height plus 10 %. Proposed Site Location Map RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 Proposed Site Layout (Scale 1:500) 4.3 Site Selection Process The location was chosen after comparative evaluation of alternative positions within the Connolly Meats landholding. The selected site provides optimal wind exposure while minimising visual, noise and ecological impacts. Key considerations included: • Residential Amenity: All nearby dwellings are outside the identified noise and shadow-flicker thresholds. Letters of consent from adjacent landowners confirm their awareness and support. • Environmental Protection: The turbine avoids interference with hedgerows, watercourses or habitats RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 of ecological value. • Infrastructure Efficiency: The short distance to the existing substation minimises underground cabling and associated disturbance. • Operational Integration: The turbine will be fully contained within the industrial site boundary, maintaining the visual coherence of the facility. 4.4 Construction and Installation Process Pre-Construction: • Final surveys, permits, and contractor mobilization. • Traffic and environmental management plans implemented in line with the CEMP. Civil Works: • Excavation and construction of the reinforced concrete foundation. • Installation of underground ducting and cabling between the turbine and substation. • Preparation of the crane hardstanding and temporary access road using permeable gravel. Turbine Erection: • Assembly and erection of the tower, nacelle and rotor using cranes under suitable weather conditions. • Commissioning by certified engineers from the turbine supplier. Electrical Works: • Underground cabling to the existing ESB substation. • System integration with internal distribution to the processing plant. • Connection fully compliant with ESB Networks and EirGrid requirements. Commissioning: • Electrical, mechanical and safety testing. • Performance optimization and certification prior to handover. During operation, the turbine will be remotely monitored through a SCADA-based control system, allowing automatic curtailment if required for noise or shadow-flicker mitigation. Figure 4.3: Typical Construction Layout and Crane Hardstanding Figure 4.4: Cable Route to Existing Substation 4.5 Overhead Power Lines The relocation of existing overhead power lines within the application site is incorporated into the design. All works will be undertaken in coordination with ESB Networks, following the safety standards of ENA EREC L44 and all relevant national regulations. This ensures that the final configuration meets the safety objectives for clearance distances and eliminates any risk associated with turbine fall distance relative to electrical infrastructure. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 4.6 Drainage and Surface Water Management No changes to the site’s natural drainage pattern are anticipated. The turbine foundation and access track will have minimal impermeable area. Surface water runoff will be directed to surrounding grassed areas for natural infiltration. Detailed drainage design will be finalised post-planning approval in accordance with Sustainable Urban Drainage Systems (SuDS) principles. 4.7 Ancillary and Ground Works Ancillary works include a temporary hardcore access road for turbine delivery and construction activities. This road will also facilitate maintenance access during operation and will be removed during decommissioning, with the land reinstated to its original condition. Ground works include: • Turbine foundation • Underground ducting and cable installation • Crane hardstanding area • Minor grading and reinstatement work. Figure 4.5: Proposed Access Route and Visibility Splays 4.8 Wind Turbine Specifications The Vestas V52 is a proven, medium-scale wind turbine designed for onshore applications. Key specifications include: • Rated Power: 850 kW. • Hub Height: 65 m • Rotor Diameter: 52 m • Maximum Tip Height: 91 m • Rotor Speed: Variable (14–28 rpm) • Cut-in Wind Speed: 4 m/s. • Cut-out Wind Speed: 25 m/s Structural Components: • Reinforced concrete foundation. • Steel tower sections (four segments) • Nacelle housing gearbox, generator and control systems • Three-blade rotor with aerodynamic pitch regulation RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 Safety and Control Systems: • Triple-redundant hydraulic pitch system for each blade. • Mechanical rotor brake and rotor lock for maintenance • Active yaw control for optimal wind alignment • SCADA-based monitoring and automatic shutdown in adverse conditions • Integrated lightning protection and surge suppression Vestas V52 Turbine Elevation (Scale 1:200) 4.9 Operational Phase Once operational, the turbine will be remotely monitored by the supplier and Connolly Meats’ facility team. Routine maintenance will occur monthly, with major service inspections twice per year. No permanent lighting is proposed other than aviation lighting required by the Irish Aviation Authority (IAA). All maintenance waste will be removed from site to licensed facilities. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 4.10 Decommissioning The turbine has an expected lifespan of 20–25 years. Decommissioning will follow the Construction and Environmental Management Plan (CEMP) and the Operational Environmental Management Plan (OEMP). This process will involve: • Disconnecting and dismantling the turbine under controlled conditions • Removing cables and equipment where feasible • Backfilling the foundation and reinstating the site using imported topsoil • Restoring the land to agricultural use Approximately 85 percent of the turbine materials (steel, copper, electronics) can be recycled or reused. 4.11 Background Site History Connolly Meats has an established planning history at Dundrumman, including: File Number Application Status Decision Code Development Address Development Description 97319 APPLICATION FINALISED CONDITIONAL Dundrumman Td, Scotstown, Co Monaghan erect a Cold Store complete with office, canteen, toilet and septic tank 03881 APPLICATION FINALISED CONDITIONAL Dundrumman Td, Scotstown, Co Monaghan Retention of (1) new entrance on to public road north of site (2) front boundary consisting of low wall with brick piers (3) external roofing and wall finish of unit, white cladding with blue ridge and corners (4) alteration to front elevation which includes associated offices and stairwell (5) first floor plan and all associated site works 1273 APPLICATION FINALISED CONDITIONAL Dundrumman Td, Scotstown, Co Monaghan a) Retain internal changes/modifications which include increased office space at first & second floor level (b) Retain all elevational changes (c) Retain new free standing portal frame storage structure to northern boundary of site (d) Retain modifications to site boundary as previously approved under P03/881 together with all ancillary site works. The site boundary and site area have been modified / increased. 20235 APPLICATION FINALISED CONDITIONAL Dundrumman Td, Scotstown, Co Monaghan Permission to construct an MV electricity supply substation together with all ancillary site works on their site This planning record confirms the site’s long-standing industrial use and suitability for on-site renewable generation. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 5. TECHNICAL AND ENVIRONMENTAL ASSESSMENTS 5.1 Noise Nature of Noise from Wind Turbines Noise emissions from a wind turbine arise from two main sources: • Aerodynamic noise, produced by the interaction between the blades and air, which is broadband in nature and may have a soft “swish” character. • Mechanical noise, generated by the internal components within the nacelle, such as the gearbox or generator, which is minimal in modern turbines and generally masked by aerodynamic noise. Noise levels increase slightly with wind speed, but background noise (from vegetation and local environment) rises at a faster rate, meaning turbine sound becomes progressively less perceptible under higher wind conditions. Assessment Methodology A detailed Noise Impact Assessment was undertaken by MKO Environmental Consultants, using ISO 9613 - 2:2024 Acoustics – Attenuation of sound during propagation outdoors. The study modelled predicted turbine noise levels at all noise-sensitive receptors within 1 km of the turbine. Assessment criteria were based on the Wind Energy Development Guidelines (DEHLG, 2006), which remain the operative national guidance. The following fixed limits were applied, representing a conservative scenario: • Daytime (07:00–23:00): 45 dB(A), or 5 dB above background noise, whichever is greater. • Night-time (23:00–07:00): 43 dB(A), or 5 dB above background noise, whichever is greater. Ground absorption, terrain, and meteorological factors were included to simulate real -world conditions in accordance with best practice. Proposed Wind Turbine Location Proposed Entrance RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 Predicted Results The results of the Updated Noise Impact Assessment (MKO, September 2025) confirm that: • At all receptors, predicted noise levels are below the 45 dB(A) daytime and 43 dB(A) night-time thresholds. • The only exception is Receptor R07, where a marginal exceedance of up to 2 dB is predicted during a narrow band of mid-range wind speeds. • At higher wind speeds, ambient background levels from vegetation and local topography increase substantially, masking any potential turbine noise. • The updated model now includes all receptors and replaces the conservative assumptions from the earlier 2024 submission. A signed consent agreement has been provided by the occupants of R07. This dwelling is directly associated with Connolly Meats (family-owned and occupied by members of the business). While this ownership context is noted, it is not relied upon for compliance, the mitigation commitments described below ensure that no adverse amenity impact will arise under any circumstances. Mitigation and Control Measures To provide complete assurance of compliance, Connolly Meats will implement the following measures: 1. Reduced-Noise Operating Mode: The turbine will initially operate in the manufacturer’s Mode 100 dB(A), which represents a 2 dB reduction in sound power relative to the standard setting. This ensures compliance even under conservative modelling assumptions. 2. Post-Commissioning Noise Survey: Within three months of operation, an on-site noise survey will be carried out. Measured sound levels will be correlated with hub-height wind speeds to verify compliance with planning limits. 3. Operational Curtailment: The turbine’s SCADA system allows automatic control and curtailment if real-time monitoring indicates any exceedance. Curtailment will occur at pre-programmed wind speeds to prevent non-compliance. 4. Ongoing Maintenance: Regular servicing will maintain aerodynamic efficiency and prevent tonal noise from mechanical wear or imbalance. 5. Monitoring and Reporting: All monitoring data will be retained and made available to Monaghan County Council upon request. Compliance Statement RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 The independent MKO Noise Impact Assessment confirms that: • All noise-sensitive receptors meet national limits under realistic operating and environmental conditions. • The turbine’s single-unit, industrial-site context means background noise from the existing facility provides a natural acoustic buffer. • Even the conservative model predicts only marginal exceedance at one receptor, fully mitigated by reduced-noise operation and automatic curtailment. When combined with the post-construction verification and ongoing operational controls, it is demonstrated conclusively that the proposed turbine will not give rise to any significant noise impact or loss of residential amenity. On the basis of the updated MKO assessment, the inclusion of all receptors, and the operational controls committed to above, it is concluded that the proposed turbine will not result in any significant noise impacts or loss of residential amenity. The findings confirm full compliance with national guidance, and the issue previously raised in relation to noise has been fully resolved. 5.2 Shadow Flicker effect Nature of the Effect Shadow flicker is the temporary modulation of light levels caused when the rotating blades of a wind turbine pass between the sun and an observer, creating an intermittent shadow effect. This phenomenon only occurs under very specific conditions: • The sun must be shining and at a low angle (typically early morning or late afternoon). • The turbine must be directly aligned between the sun and the affected window. • The blades must be rotating at sufficient speed to cast distinct shadows. As a result, shadow flicker can only occur intermittently and is dependent on both weather and turbine operation. Irish planning guidance establishes a maximum exposure threshold of 30 minutes per day or 30 hours per year for any dwelling. Assessment Methodology A Shadow Flicker Impact Assessment was prepared by Entrust Ltd. using WindPRO 4.0.540, applying the full Vestas V52 turbine specifications (hub height 65 m, rotor diameter 52 m, tip height 91 m). All dwellings within 850 metres of the turbine were modelled to determine potential shadow flicker durations. The initial stage of the model used a “bare earth” worst-case scenario, assuming: RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 • Constant sunlight from sunrise to sunset, with no cloud cover. • Continuous wind above the cut-in speed, ensuring the turbine rotates at all times. • Rotor always perpendicular to the sun–receptor line. • No screening from vegetation, topography, or buildings. • North-, south-, east-, and west-facing windows of 1 m² at 2 m above ground level, fully uncovered and occupied. These conditions intentionally overestimate the potential effect and are standard practice for first-stage modelling. To establish a more realistic prediction, long-term sunshine data from the Met Éireann weather station at Clones, Co. Monaghan was applied. Records show that the sun shines on average during 26% of daylight hours annually, meaning actual exposure durations are approximately 74% lower than theoretical worst-case outputs. Table 1: Average Monthly Sunshine Hours at Clones Weather Station (1978–2007) Jan Feb Mar Appr May Jun Jul Aug Sep Oct Nov Dec Annual Sunshine Hours: Mean Daily Duration (i) 1.5 2.2 3.0 4.6 5.6 4.6 4.4 4.2 3.6 2.8 1.8 1.2 3.3 Daylight Hours (ii) 8.0 9.44 11.49 14.0 15.57 17.0 16.29 14.46 12.39 10.30 8.31 7.26 12.04 % Sunshine 19% 23% 26% 33% 36% 27% 27% 29% 29% 27% 22% 17% 26% Based on meteorological data from Clones 1978-2007 (https://www.met.ie/climate-ireland/1981- 2010/clones.html) ii Based on sunrise and sunset times for Muine Bheag 2020 (https://www.sunrise-and- sunset.com/en/sun/ireland/muine -bheag/2020) Results Eight receptors were analysed, including six residential dwellings (A, C, D, F, G, H), one financially involved property (B), and one non-residential poultry unit (E). RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 The table below summarises both the theoretical worst-case and sunshine-corrected results. Table 2: Shadow Flicker predicted Levels by Receptor Receptor ID Easting (ITM) Northing (ITM) Theoretical Worst-case Scenario Realistic Scenario (26% of Total Hours) Total Theoretical Days Per Year Maximum Theoretical Minutes Per Day Total Hours Compliance A (Residential dwelling) 656,796 836,742 0 0:00 0:00 0:00 Yes B (Financially involved) 656,644 836,770 0 0:00 0:00 0:00 Yes C (Residential dwelling) 656,540 836,970 0 0:00 0:00 0:00 Yes D (Residential dwelling) 656,298 837,065 53 0:36 24:08 6:16 Yes E (Non- Residential dwelling) 656,600 837,385 84 0:45 55:53 14:32 Not sensitive F (Residential dwelling) 657,011 837,071 46 0:33 19:32 5:05 Yes G (Residential dwelling) 656,880 836,963 0 0:00 0:00 0:00 Yes H (Residential dwelling) 656,369 837,261 50 0:39 24:54 6:28 Yes TOTALS Number of Receptors that may Experience: 0 > 30 Hours/Year 0 0 Interpretation The updated analysis confirms that all residential dwellings comply with the national limits for shadow flicker exposure, even under conservative worst-case conditions. Key findings include: • Property H, which was inadvertently omitted in the original 2024 submission, has now been assessed and records 24 hours 54 minutes per year under the theoretical model, and only 6 hours 28 minutes per year once sunshine correction is applied. • Property D shows similar theoretical results but remains fully compliant under realistic conditions. • Property E, a poultry unit, records the highest theoretical exposure but is not a residential receptor and therefore not considered sensitive for planning purposes. • When corrected using regional sunshine data, no residential property exceeds 30 hours per year or 30 RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 minutes per day. The previous refusal reason was based on uncorrected worst-case outputs and omission of one receptor. These issues have now been addressed comprehensively, with a complete receptor inventory, updated modelling, and verification by Entrust. Figures 5.2.1–5.2.3 (appended to this report) illustrate: 1. The annual total hours of potential shadow flicker under worst -case conditions. 2. The maximum daily duration per receptor. 3. The revised receptor map with full coverage, including property H. Shadow Flicker Receptors and Occurrence Windows (Entrust, Sept 2025) RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 See maps identifying all supporting residential properties within 500m of the turbine, along with the names of their owners/occupiers below. Mitigation Measures While the updated modelling demonstrates full compliance with national thresholds, Connolly Meats commits to implementing the following mitigation and monitoring measures to provide additional assurance: 1. Automated Control System The Vestas V52 turbine will include a programmable SCADA control feature that allows automatic shutdown during predicted exceedance periods. This system will operate based on real -time solar geometry and turbine position. 2. Vegetation and Screening Existing hedgerows will be preserved and reinforced, where appropriate, to further reduce potential line-of-sight exposure from nearby dwellings. 3. Post-Construction Verification A monitoring exercise will be undertaken during the first operational year to confirm the actual duration and frequency of shadow flicker at the identified receptors. Results will be reported to Monaghan County Council. 4. Planning Condition Compliance RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 The applicant accepts a standard condition requiring full compliance with the 30-hour-per-year and 30- minute-per-day limits, with curtailment or operational adjustment as required. The updated Entrust (2025) analyses conclusively demonstrate that the proposed turbine will not give rise to unacceptable shadow flicker effects. All residential dwellings are comfortably below the guideline thresholds, and the only non -residential property with higher exposure is not a sensitive receptor. The correction of the previous receptor omission and application of realistic meteorological data resolve the issues identified in the refusal. With the inclusion of automated control and monitoring commitments, the development ensures continued protection of residential amenity. It is therefore concluded that the reason for refusal relating to shadow flicker has been fully addressed and overcome. 5.3 Visual impact (ALVI) A comprehensive Assessment of Landscape and Visual Impact (ALVI) was carried out to evaluate the interaction between the proposed 850 kW wind turbine and its receiving environment. The assessment included photomontage visualizations from twelve representative viewpoints within 5 km of the site and a Zone of Theoretical Visibility (ZTV) map, both of which form part of the submission. Landscape Context The proposed turbine site lies within the “Hills and Flat Farmland” Landscape Character Area (LCA 4) identified in the Monaghan County Development Plan 2019–2025 and Monaghan County Wind Energy Strategy. This landscape is characterised by gently undulating topography, medium-sized pasture fields, and a patchwork of hedgerows, woodlots, and rural buildings. Existing agri-industrial activities such as the Connolly Meats processing plant and other agricultural enterprises contribute to a working landscape where medium-scale built structures are already present. Within this context, the proposed turbine represents a logical and visually coherent addition , a single, slender vertical structure associated with existing industrial activity rather than an isolated element in a pristine rural scene. Assessment Methodology The assessment followed best practice as outlined in: • Landscape Institute & IEMA (GLVIA3); and • Wind Energy Development Guidelines (2006) (and current draft update). Twelve viewpoints were selected to represent public and private receptors at varying distances and RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 orientations, including locations along public roads, nearby dwellings, and elevated ground. Photomontages were produced following industry standards for scale, lens type, and rendering. All visualisations represent a worst-case scenario, assuming full visibility and clear weather conditions, thereby providing a conservative basis for evaluation. Findings of the Assessment Visibility • The turbine is visible from only two of the twelve assessed viewpoints (VP1 and VP2), located within 350 m of the turbine base. • In all other cases, the combination of local topography, tree cover, and existing structures effectively screens the turbine from view. • Even at the closest viewpoints, the turbine appears against an uncluttered sky backdrop, avoiding overlap with buildings, telegraph poles, or other vertical elements. Landscape Integration • The receiving landscape’s pattern of hedgerows and rolling fields provides strong visual containment. • The turbine does not breach skyline ridges or appear above key visual thresholds. • It is visually read as a single, clean structure within a semi-industrial rural setting rather than an intrusive or competing element. • The Vestas V52 model selected has a slender tower and moderate tip height (91 m), proportionate to the local scale of the landscape. Character and Setting • From short-range viewpoints (VP1–VP2), the turbine appears clearly visible but proportionate and visually coherent with the adjacent Connolly Meats complex (see Figures 1 & 2). • From middle-range viewpoints (1–3 km), visibility is intermittent or filtered through vegetation. • At long-range distances (> 3 km), the turbine is imperceptible in the landscape, confirmed by the ZTV and photomontages. • Figure 3 provides a comparative image illustrating typical “visual clutter” in other contexts, a condition not present at this site. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 Figure 1 - Viewpoint 1 Figure 2 - Viewpoint 2 Figure 3 – Example of visual clutter RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 Public Road and Near Receptors • A street-level view from the adjoining local road (Figure 4) shows that the turbine is partially screened by intervening vegetation and built form. • Visibility from road corridors is short in duration due to changes in elevation and boundary vegetation. • No designated scenic routes or viewpoints occur within the ZTV area. Figure 4 Cumulative Effects There are no other wind turbines within five kilometres of the proposed development site; therefore, cumulative landscape or visual effects do not arise. The proposed turbine will appear as a single, legible vertical feature associated with the Connolly Meats complex, rather than as part of a wider cluster or wind farm. Its isolated position, moderate height, and clear spatial relationship with existing industrial buildings ensure that it contributes to the identity of the site without introducing visual clutter or skyline congestion. To illustrate this distinction, Figure 5 below presents a comparative example from the Wind Energy Development Guidelines (2006), Section 6.9.2. The example demonstrates a “visual clutter” scenario where multiple turbines are placed in close proximity to buildings and infrastructure, creating overlapping elements and confused scales. By contrast, the Connolly Meats turbine maintains strong separation from dwellings, roads, and other structures, ensuring a clean visual composition and a coherent relationship with its semi-industrial rural setting. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 Figure 5 – Example of visual clutter in multi-turbine settings (after Wind Energy Development Guidelines, 2006 §6.9.2) Summary of Visual Effects Viewpoint Location Distance from Turbine (m) Turbine Visibility Comments Level of Effect VP1 Connolly Meats Factory, South 320 Visible Visible due to proximity and lack of visual obstruction. Moderate- Substantial VP2 Dundrumman, North 303 Visible Visible due to topography and proximity; industrial setting reduces impact. Slight-Moderate VP3 Skeatry, North 934 Not Visible Not visible due to mature vegetation along road. Imperceptible VP4 Sheskin Crossroads, North 1180 Not Visible Not visible due to forestry and mature vegetation. Imperceptible VP5 St. Joseph’s Church, North 2990 Not Visible Not visible due to trees and 2.99 km distance. Imperceptible VP6 Eshbrack Bog, North 4450 Not Visible Not visible due to 4.45 km distance and vegetation. Imperceptible RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 VP7 Eshbrack Bog, alternative view, North 4160 Not Visible Not visible despite break in roadside vegetation; dense forestry behind. Imperceptible VP8 Sheskin, Northeast 1090 Not Visible Not visible due to mature vegetation and terrain. Imperceptible VP9 Killycarnan South, Northeast 2170 Not Visible Not visible due to vegetation and 2.17 km distance. Imperceptible VP10 Scotstown Outskirts, East 3730 Not Visible Not visible due to distance and mature trees. Imperceptible VP11 Killatten, Southeast 2680 Not Visible Not visible due to mature trees and undulating topography. Imperceptible VP12 Drumloo Lake, Southeast 1310 Partially Visible Partially visible behind trees; blends into existing landscape. Slight Policy Compliance The proposed turbine complies fully with: • Policy ENP 1 of the Monaghan County Development Plan 2019–2025, supporting renewable energy at suitable locations that safeguard visual and residential amenity. • Policy ENP 3, promoting integration of renewable energy within existing industrial and infrastructural contexts. • Section 15.20 of the same plan, ensuring developments respect landscape character and local scale. • The intent of Section 6.9.2 of the Wind Energy Development Guidelines (2006), by avoiding visual clutter, overlap, and skyline congestion. Conclusion The visual and landscape assessment confirms that the proposed 850 kW wind turbine can be readily accommodated within the receiving landscape. Its siting adjacent to existing agri-industrial infrastructure, moderate scale, and clear separation from dwellings ensure that visual effects are limited and acceptable. From most viewpoints, the turbine will be screened or visually contained by topography and vegetation. Where visible, it reads as a coherent and legible structure contributing positively to the rene wable-energy character of the site. The proposed development therefore achieves a balanced integration with its environment and accords with RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 national and local planning policies relating to landscape protection and renewable -energy development. 5.4 Ecology A Screening for Appropriate Assessment (AA) and a Natura Impact Statement (NIS) were undertaken by Veon Ecology (Sara Sheridan, MSc BSc QCIEEM) in accordance with Article 6(3) of the EU Habitats Directive and Part XAB of the Planning and Development Act 2000 (as amended). These assessments were based on field surveys completed on 6 July 2023 and follow best-practice methodologies outlined by the National Roads Authority (NRA, 2008) and the Department of the Environment (DoEHLG, 2010). The study area comprises improved agricultural grassland (GA1) bordered by hedgerows (WL1) and treelines (WL2), used for livestock grazing. The nearest watercourse, the Maghery Stream (EPA code: 36M03), lies approximately 150 m west of the site and is not hydrologically connected to the proposed development. No Annex I habitats, protected flora, or high -impact invasive species were recorded. Similarly, no evidence of protected mammal or bird species was observed during the field survey. Two Natura 2000 sites fall within the 15 km Zone of Influence (ZoI): • Slieve Beagh SPA (004167) – approximately 1.9 km north, designated for the Hen Harrier (Circus cyaneus). • Kilroosky Lough Cluster SAC (001786) – approximately 11 km southwest, designated for aquatic habitats and White-clawed Crayfish (Austropotamobius pallipes). Neither site is hydrologically connected to the project area. The Screening determined that only Slieve Beagh SPA warranted further consideration, leading to Stage 2 Appropriate Assessment. The NIS concluded that: • The proposed turbine site lies entirely outside any European Site. • The habitats present (improved grassland and hedgerows) are of low ecological value and not suitable for Hen Harrier roosting or breeding. • No evidence of Hen Harrier, Merlin (Falco columbarius), Red Grouse (Lagopus lagopus hibernicus), or other protected raptors was found within 1 km of the site. • Construction and operation will not result in loss or fragmentation of qualifying habitats, nor disturbance to qualifying species. • There are no pathways for significant effects to occur, either individually or in combination with other projects. All potential minor effects (e.g., noise, dust, runoff) are addressed through the Construction Environmental Management Plan (CEMP), which includes standard measures for silt control, dust suppression, refuelling protocols, and habitat protection. The Ornithology Report confirmed that the site falls within a “Low Sensitivity” area on the Bird Sensitivity Mapping for Wind Energy (BWI, 2023), with no evidence of raptor territories, roosts, or flight paths within the RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 rotor-swept height (43–87 m AGL). Routine post-construction monitoring (e.g., flight activity and potential mortality surveys) is recommended as good practice but not required under statutory mitigation. The ecological assessments were prepared by a qualified ecologist in line with CIEEM Guidelines (2019) and remain valid, as no material change in land use, habitat condition, or surrounding environment has occurred since the fieldwork was completed. Note on survey validity: Given the site’s stable agricultural use and absence of ecological change since 2023, it is reasonable and consistent with EPA and NPWS practice not to repeat the ecology, AA or ornithology surveys. This is supported by the Letter from Veon Ecology (Appendix H) confirming that the baseline and conclusions remain applicable to the current planning submission. 5.5 Flood Risk The proposed site for the wind turbine is not located within an area designated as being at risk of flooding. This conclusion is based on national flood mapping datasets and hydrological models, as outlined below. CFRAM - River Flood Extents – Present day According to the Catchment Flood Risk Assessment and Management (CFRAM) “Present Day” scenario, no flood risk has been identified at the turbine location. The Present Day maps are derived from historical flood data and modelling of current hydrological conditions, excluding the effects of climate change. A separate climate ch ange scenario has also been reviewed, confirming that no immediate or future flood risk affects the site. National Indicative Fluvial Mapping (NIFM) River Flood Extents - Present Day The National Indicative Fluvial Mapping (NIFM) dataset, which models the extent of land potentially affected by fluvial flooding during a theoretical design flood event, also indicates that the proposed turbine site lies outside any mapped flood extents. The nearest flood risk areas identified are: • Approximately 1 km northeast of the site, associated with the Blackwater (Monaghan) River, and • Approximately 230 m southwest, downhill towards the Maghery River. These findings confirm that while watercourses exist within the broader area, the proposed wind turbine location itself lies on elevated ground, well outside the predicted flood zones under both current and future scenarios. Accordingly, the development poses no flood risk to the site or adjoining lands. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 5.6 Traffic and Delivery This section provides an overview of the intended delivery route, haulage logistics, and expected traffic movements associated with the transport, installation, and operation of the proposed wind turbine. It also assesses the potential effects of construction-related traffic on the surrounding road network. Haul Route and General Access The proposed delivery route from Dublin Port to Dundrumman, Scotstown follows the national road network, minimising disruption and avoiding the need for road alterations. The route is illustrated in Appendix F – Transport Plan and is summarised as follows: • From Dublin Port, turbine components will exit via the Port Tunnel, continue onto the M50, and merge northbound onto the M1 motorway. • At Junction 14, the convoy will exit onto the N33, connecting to the N2 northbound through Carrickmacross and Castleblayney. • Approaching Monaghan Town, vehicles will take the R186 towards Threemilehouse and Scotstown, and then follow local roads to Connolly Meats, approximately 350 m north of the factory. All roads along this route are suitable for heavy goods and abnormal loads. No road modifications are required. The turbine components will be transported on specialised low-loader trailers equipped with independent rear steering, ensuring safe manoeuvrability through junctions and local access roads. Delivery Logistics Transport of turbine components will be undertaken by a specialist haulage contractor experienced in abnormal load management. The main procedures include: RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 • Route surveys and permitting: Carried out in coordination with Monaghan County Council, An Garda Síochána, and the Transport Infrastructure Ireland (TII) abnormal loads unit. • Escort vehicles: Provided to accompany convoys, alerting other road users and ensuring public safety. • Timing: Deliveries scheduled between 00:00 and 07:00, outside peak traffic periods and school transport hours. • Weather and safety monitoring: Transport will be rescheduled if adverse conditions arise. • Delivery site preparation: Adequate crane hardstanding and laydown areas will be available for unloading and assembly. Vehicle Specifications • Blades: Up to 45 m long, transported three per semi-trailer (extendable type). • Tower sections: Delivered in three segments, the longest measuring 26 m. • Other components: Nacelle, hub, and electrical equipment on standard 8-axle articulated flatbeds. All trailers comply with abnormal load regulations and require no road upgrades for access. Construction Traffic Volumes and Timing Subject to planning approval, construction is anticipated to commence in Summer 2024 and last 3–6 months, including foundation works, cabling, turbine erection, and reinstatement. • Material deliveries: Approximately 20 loads over the full construction period, including stone, concrete, reinforcement steel, cabling, and turbine components. • Peak period: During foundation construction, with up to 10 vehicles per day (approx. one vehicle per hour). • Local sourcing: Aggregate and concrete will be sourced locally where possible. • Cranes: Two mobile cranes (80-tonne for unloading and 350-tonne for erection) will be required temporarily. During operation, the turbine will be unmanned, with routine maintenance visits approximately every six months. The predicted operational traffic level is negligible. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 Traffic Management and Safety A Traffic Management Plan will be prepared prior to construction in consultation with Monaghan County Council and An Garda Síochána. Key measures include: • Advance notification to local residents and authorities of delivery dates. • Coordination to avoid school and commuter peak hours. • Submission of abnormal load permit applications at least one week before movement. • On-site personnel to guide vehicles during manoeuvres. Given the existing capacity of the local and regional road network, and the temporary nature of construction activity, the development is expected to have no significant traffic impacts. 5.7 Archeology in the Vicinity A review of the Historic Environment Viewer provided by the National Monuments Service of Ireland confirms that there are no recorded archaeological monuments or protected sites within or immediately adjacent to the proposed turbine location. Given the site’s current use as improved agricultural land and the absence of any recorded archaeological features in the surrounding area, there is no likelihood of significant archaeological impact arising from the proposed development. Should any artefacts or features of archaeological interest be uncovered during construction, works will be halted immediately, and the National Monuments Service (NMS) will be notified in accordance with standard procedures. Sites and Monuments Records Historic Environment Viewer Extract. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 5.8 Electromagnetic interference Electromagnetic Interference (EMI) refers to the potential impact of rotating metallic structures on microwave, radio, and television signals in the surrounding area. Experience from numerous existing wind energy projects has demonstrated that such effects are negligible. VHF and UHF signals are not affected by modern wind turbines, as the relative size of turbine components is small compared to the wavelength of these transmissions. Furthermore, modern turbine blades are constructed primarily from glass fibre and contain only a small- diameter lightning conductor, significantly reducing any conductive interference potential. On this basis, no electromagnetic interference to local telecommunications, radio, or broadcast signals is expected to result from the operation of the proposed turbine. 5.9 Operation and Maintenance Operational lifespan of the proposed wind turbine The proposed wind turbine will have an operational lifespan of approximately 20–25 years. It is designed for durability, with around 85% of its components, including steel, copper wiring, electronics, and gearbox materials, being recyclable or reusable at the end of its life cycle. Monitoring and Routine Maintenance Once operational, the turbine will be remotely monitored by the turbine supplier or a dedicated operations contractor. It will operate continuously whenever wind speeds are sufficient, with brief downtime periods for scheduled maintenance. • Routine maintenance visits will occur approximately once per month, typically undertaken by one or two technicians travelling by car or van. • Major planned maintenance will take place twice annually, involving two maintenance vehicles on site for about three days. • All waste materials or fluids (e.g. oils, filters, general refuse) generated during maintenance will be removed from site and disposed of at licensed facilities, ensuring no discharge or storage occurs onsite. Lighting and Safety During normal operation, the turbine will not be illuminated, except for any aviation safety lighting required by the Irish Aviation Authority (IAA). Occasional Major Works Occasional unscheduled repairs or component replacements may require the temporary return of cranes or large plant to the site. For this reason, the crane hardstanding area will be retained throughout the operational phase and decommissioning period. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 The surface will be grassed over to promote hydraulic absorption and assist in managing surface water runoff while maintaining structural stability for future use. 6. ENVIRONMENTAL MANAGEMENT SYSTEM, WASTE AND SAFETY 6.1 Environmental Management System The construction process for the proposed development is expected to have minimal environmental impact. No fuels or oils will be stored on site, and no hazardous or polluting substances will be used. Concrete for the turbine foundation will be poured in a single controlled twelve-hour operation, with full management of wash water and runoff. A comprehensive Construction and Environmental Management Plan (CEMP) and Decommissioning Plan are provided in Appendix E, setting out environmental controls, monitoring procedures, and mitigation measures to be implemented during both construction and decommissioning. In the unlikely event of accidental spillages on public roads or within the site, the developer will be responsible for immediate containment, clean-up, and reporting, ensuring no contamination of soil or watercourses. 6.2 Waste Management The proposed development will generate limited quantities of waste during construction, primarily: • Approximately 100 m³ of subsoil, • Minor volumes of timber and packaging waste. Subsoil will be reused on site as backfill wherever possible. Any surplus inert material will be removed by a licensed contractor to an approved disposal facility. All other waste (timber, packaging, general refuse) will be segregated, stored in covered skips, and collected for recycling or licensed disposal. A covered skip will be maintained on site for the duration of works. The developer will ensure the site and surrounding roads remain clean and free of debris , with no dust or mud deposition on the public road network. Regular inspections and wheel-washing facilities will be used as required. 6.3 Safety Systems The Vestas V52 wind turbine incorporates multiple safety systems to ensure safe operation under all conditions: • Dual Braking Systems and Locking Mechanism: Mechanical and aerodynamic brakes allow controlled shutdown during maintenance or extreme weather, supported by a rotor-locking mechanism. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 • Lightning Protection System: Integrated conductors safely channel lightning currents away from sensitive electronic components, reducing risk of damage or electrical hazard. • Storm Control System with Sensors: Automatic monitoring of wind conditions triggers turbine shutdown and yaw adjustment during severe weather, protecting both the structure and surrounding environment. 6.4 Decommissioning Plan At the end of the turbine’s operational life, decommissioning will be undertaken by an experienced main contractor, following the CEMP and the Operation & Environmental Management Plan (OEMP). The process will prioritise safety, minimal disturbance, and environmental restoration. Wind Turbine: • Disconnect from the grid in coordination with ESB Networks and EirGrid. • Dismantle and remove components using cranes under suitable weather conditions. • Transport components off-site for reuse, recycling, or licensed disposal. Foundation: • Foundations will remain in place for stability but be backfilled and covered with topsoil. • Revegetation using a native seed mix will restore ground cover and natural drainage. Underground Cabling: • Electrical and fibre-optic cables will be mechanically withdrawn, while ducts remain to minimise soil disturbance. Traffic Management: • A dedicated Traffic Management Plan will be implemented for decommissioning. • Abnormal load movements will be coordinated with Monaghan County Council, Gardaí, and emergency services. These measures ensure that decommissioning will be safe, controlled, and environmentally responsible, restoring the site to its pre-construction condition and leaving no residual environmental impact. 7. GRID CONNECTION The proposed wind turbine will connect to the existing electrical infrastructure within the Connolly Meats facility. All cabling will be installed underground and contained entirely within the site boundaries, ensuring no disruption to public or third-party lands. (Refer to Layout Plan.) The turbine will be linked to the existing on-site substation, which has adequate current-carrying capacity to RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 accommodate the turbine’s output. Connection will be made through a dedicated transformer and cabling system that complies fully with ESB Networks’ technical and safety requirements. The turbine is designed to operate as a private embedded generation system, supplying electricity directly to Connolly Meats’ base load. Given the site’s continuous energy demand, no export of electricity to the national grid is anticipated. This self-supply configuration ensures a reliable, efficient, and sustainable energy source for the facility, reducing reliance on fossil fuels and improving overall energy resilience. 8. PLANNING COMPLIANCE & BENEFITS The proposed wind turbine fully aligns with national and local renewable energy policy and with the objectives of the Monaghan County Development Plan 2019–2025, particularly under Chapter 8: Environment, Energy, and Climate Change. The project promotes clean energy generation, energy efficiency, and the sustainable operation of existing industrial infrastructure, consistent with Policies ENP 1 and ENP 2: • Policy ENP 1: Encourage renewable energy projects at suitable locations where visual and residential amenity are protected. • Policy ENP 2: Promote energy-efficient measures in development design and operation. The turbine directly supports these objectives by providing a low-carbon, on-site renewable energy source for a local employer, reducing dependence on grid electricity and fossil fuels while maintaining full protection of landscape, ecological, and residential amenity. Policy / Objective Compliance Statement National Planning Framework / Project Ireland 2040 Supports on-site renewable generation contributing to Ireland’s transition to a low-carbon economy. Climate Action Plan 2024 Contributes to national renewable electricity targets and greenhouse gas reduction commitments. Monaghan County Development Plan (ENP 1 & ENP 2) Promotes renewable energy and energy efficiency while protecting amenity; the project satisfies both objectives. Wind Energy Development Guidelines (2006) Complies with siting, noise, and shadow flicker limits; visual assessment confirms no undue impact. Appropriate Assessment / Ecology Reports No likely significant effects on European Sites; mitigation fully integrated. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 CEMP & Decommissioning Plan Ensures full environmental control during construction, operation, and end-of-life phases. Company and Community Benefits Connolly Meats is a long-established family business and an important local employer in Scotstown. The project will: • Reduce operational energy costs and exposure to rising electricity prices. • Improve energy security through on-site renewable generation. • Demonstrate leadership in sustainability and responsible business practice. • Contribute to Ireland’s renewable energy and decarbonisation targets. • Maintain local employment and strengthen the long -term viability of the facility. Overall, the proposal delivers economic, environmental, and social benefits, representing a positive contribution to both the local community and the national climate agenda. 9. CONCLUSION The proposed development represents a practical, small-scale renewable energy project designed to serve the electricity needs of Connolly Meats, a key local employer in County Monaghan. It is fully consistent with Project Ireland 2040, the Climate Action Plan 2024, and the Monaghan County Development Plan 2019–2025, each of which promotes renewable generation and energy efficiency where residential and environmental amenity are safeguarded. The turbine’s temporary nature and clearly defined decommissioning plan ensures that the site will be fully restored at the end of its operational life, with no long -term environmental or landscape impact. On this basis, the proposal constitutes proper planning and sustainable development within the meaning of the Planning and Development Act. The applicant therefore respectfully requests that planning permission be granted subject to standard conditions as deemed appropriate. RECEIVED: 25/11/2025 Greenvolt Next www.next.greenvolt.com Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449 Map Identifying Properties RECEIVED: 25/11/2025 To whom it may concern Dundrumman 20/05/2024 I/We �. le,..._ eS,T),, If 7 ------of Dundrumman,Scotstown, Co.Monaghan am/are aware that planning permission is being sought Wind Turbine with a hub height of 65m and a blade diameter of 52m on land adjoining me or close to my land. I/We have no objection to this development. Yours sincerely, Signature (Address)RECEIVED: 25/11/2025 To whom it may concern 20/06/2025 I/We ..... &w.ro ..... f.1� .... ¼..n'Y.:i.� ...................... of Co.Monaghan am/are aware that planning permission is being sought for a 850 kW Wind Turbine with a hub height of 65m and a blade diameter of 52m on land adjoining me or close to my land. I/We have no objection to this development. Yours sincerely, Signature O\JX'\&-IMYlJ'.Y?Y) 'Sco't-sbv0v:1 Cs:,. j�� (Address) RECEIVED: 25/11/2025 To whom it may concern 20/05/2024 I/We __ c\'--_,._<-____ (-'--c..__-,....__�_���+-------------of Co.Monaghan am/are aware that planning permission is being sought for a 850 kW Wind Turbine with a hub height of 65m and a blade diameter of 52m on land adjoining me or close to my land. I/We have no objection to this development. Yours sincerely, Signature (Address) RECEIVED: 25/11/2025 To whom it may concern Dundrumman 20/05/2024 I/We ____ �,\_�_l'""'--. ___ �--�·o--_S_s_:_·�_-_'-------t----------of Dundrumman, Scotstown, Co.Monaghan am/are aware that pla ing permission is being sought kW Wind Turbine with a hub height of 65m and a blade diameter of 52m on land adjoining me or close to my land. I/We have no objection to this development. Yours sincerely, Signature (Address) RECEIVED: 25/11/2025 To whom it may concern 20/05/2024 /1 �1 f-c;_ � I/We ------------------.1':--------------of Co.Monaghan am/areawarhat planning permission is being sought for a 850 kW Wind Turbine with a hub height of 65m and a blade diameter of 52m on land adjoining me or close to my land. I/We have no objection to this development. Yours sincerely, Signature (Address) RECEIVED: 25/11/2025 RECEIVED: 25/11/2025