Loading...
HomeMy WebLinkAbout2560415 - Chief Executives AI OrderMONAGHAN CO. COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (as amended) Chief Executive's Order No: P1289-25ai Reference Number: 25/60415 Name of Applicant: Dermot Mooney Address: Peter Culleton Mullabrack Shercock Co. Cavan A81 PN24 Nature of Application: Permission will consist of the re -contouring of existing undulating agricultural farmland to include the importation of soil, subsoil and inert material in order to raise the levels of part of the land together with all ancillary site development works. The lands will be recovered with topsoil and reseeded with ryegrass upon completion of the re -contouring works Location of Development: Binmore Castleblayney Co. Monaghan ORDER: I hereby order that pursuant to the provisions of the Planning and Development Act 2000 (as amended) and Article 33 of the Planning and Development Regulations 2001 (as amended), the further information set out on the attached schedule be requested from the applicant. SENIOR PLANNER DATE 25/60415 Dermot Mooney Binmore, Castleblayney, Co. Monaghan ADDITIONAL INFORMATION Note: You and/or your assigned agent should liaise with Planning Section and Environment Section prior to the preparation and submission of this Further Information. The submission should take a coherent account of any issues that overlap/interlink. Should the Further Information materially/significantly alter the proposed development, you are obliged to re -advertise same in accordance with Article 35 of the Planning and Development Regulations 2001 (as amended). The submission of Further Information does not imply that the proposal is acceptable in principle. The Planning Authority reserves the right to refuse permission should the issues identified remain unresolved or if other concerns arise. 1. Notwithstanding planning file number 25/60415, and the updated site layout plan and the noise impact assessment submitted, concerns remain regarding potential noise and general disturbance impacts on the surrounding area, particularly the adjacent residential properties along the roadside. Accordingly, please submit: a) Confirmation that all mitigation measures recommended in the noise impact assessment (including acoustic barriers/fencing) are incorporated into the site design, with their location clearly shown on the revised layout plan. b) Details for continuous noise monitoring during the operational phase, including what steps will be taken if noise levels go above the agreed limits. c) A community liaison plan, to inform nearby residents (and to keep them informed) about the works and about who they can contact if issues arise. 2. Sections 15.13 and 15.32 of the County Development Plan 2025-2031 cover agricultural development and the infilling of lands. In the interest of clarity and to allow for a fully informed decision, please demonstrate (i) why the development is necessary for the running of your farm enterprise, and (ii) how the infilling of the land would meet current farm management requirements. 3. The information submitted is insufficient with regards environmental protection and the proper planning and sustainable development of the area. Accordingly, the following is needed: a) The applicant shall clarify if this development will be filled by Article 27 National By Product declaration for greenfield soil and stone or by application for facility authorised under S.I. No. 821/2007 - Waste Management (Facility Permit and Registration) Regulations 2007. b) If a waste authorisation is required the applicant shall: i. Provide clarification on the classes of activity requested in accordance with the Third Schedule Part II of the Waste Management (Facility Permit and Registration) Regulations 2007 (as amended). ii. Identify surface water drainage ditches on -site and in close proximity to the site, including dry drainage ditches that have the potential to hold surface water. iii. Demonstrate an adequate buffer zone from drainage ditches identified on the development site and surrounding lands. iv. The applicant shall demonstrate on the revised site layout plan the location of the wheel wash structure —if applicable as per point 2(c) — and a waste quarantine area on -site. c) If Article 27 consent is required the applicant shall: i. Identify surface water drainage ditches on -site and in close proximity to the site, including dry drainage ditches that have the potential to hold surface water. ii. Demonstrate an adequate buffer zone from drainage ditches identified on the development site and surrounding lands. d) Demonstrate the suitability of the proposed development site for the importation of the proposed waste material. Details shall include an assessment on the impact this development and the proposed waste type will have on groundwater, surface water, and air, including identification of potential pathways to groundwater and surface water and any nearby drinking water supply sources and wells and identify proposed mitigation measures to protect groundwater and surface water from activities associated with this development. This information shall be completed by a qualified environmental consultant. e) Submit a revised tonnage of waste or greenfield soil and stone material proposed to be imported and infilled on -site taking into account a reduced infill area on -site because of buffer zones. This to include a topographical survey using ARC 3D or similar modelling. f) Submit an agricultural improvement plan demonstrating no net loss to biodiversity or water quality following completion of infilling. 4. The information submitted is insufficient with regards traffic safety and access standards. Consequently, please submit a detailed Traffic Management Plan (TMP) addressing HGV routing, timing, signage, and measures to minimise disruption to local road users. In the interest of clarity and to allow for a fully informed decision, please confirm the intended working hours. The planner dealing with this application is Ben Clerkin