HomeMy WebLinkAbout2560474 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT
To Planning Section
From: Martina Smith, A/ Executive Scientist, Environmental Services.
Ref: 25/60474 Waterways Ireland, Clonlura, Clonnagore, Clonoony,, Drumsloe, Roranna-
Clones, Co. Monaghan
The proposed development lies within the Finn_50 river water body catchment area. This waterboidy
has been classified as Poor WFD status 2019-2024 with an objective of Restore to Good status by 2027.
Groundwater Status is Good with A WFD objective of no deterioration. Chapter 8 of the EIAR contains
an assessment of the impacts of the proposed development on the Hydrological and hydrogeological
environment and has proposed mitigation measures to be implemented to protect surrounding and
receiving waters from any deterioration as a result of the proposed development.
An outline CEMP has been included in Appendix 4-2. Section 3.1 of the outline CEMP details the
pollution prevention control measures proposed. It is recommended that a site-specific CEMP is
agreed with Monaghan County Council and Inland fisheries Ireland prior to commencement of
development . Section 4.1 of the CEMP notes that an Environmental Manager will be appointed to
monitor the implementation of the CEMP. It is recommended that the Environmental Manager
provide regular updates on the implementation of the CEMP to Local Authorities and IFI.
Section 2.3.2.1 of the outline CEMP provides details of the water supply for the canal . It is noted that
the abstraction is “from the Finn NI as detailed and consented in the original planning consent,
Department of Environment Northern Ireland, L/2011/0833/F) at a point near the proposed canal
entrance at Gortnacarrow, southwest of the site boundary of the Proposed Development and that the
EPA and OPW will be consulted, it is suggested that Inland Fisheries Ireland should also be consulted.
Abstractions should be in accordance with the Water Environment (Abstractions and Associated
Impoundments) Act 2022 and the Water Environment (Abstractions and Associated Impoundments)
Regulations 2024.
It is recommended that a site-specific Resource and Waste Management Plan is submitted to
Environmental Services prior to the commencement of development.
I have no objection to the proposed development subject to the following conditions:
1. The site shall be managed in a manner which prevents the discharge of polluting matter to any
ground or surface waters.
2. (a) One month prior to commencement of development the applicant shall submit a site
specific Construction and Environmental Management Plan (CEMP) to Monaghan County
Council (IFI). This CEMP shall be fully implemented and shall include measures identified in the
EIAR and outline CEMP included with this application.
(b) THE CEMP shall be sufficient to demonstrate that adequate measures are in place for the
construction phase to ensure there is no discharge of polluting matter/sediment laden waters
to any watercourse. The Construction and Environmental Management Plan shall take
account of the guidance produced by Inland Fisheries Ireland titled “Guidelines on Protection
of Fisheries during Construction Works in and Adjacent to Waters 2016”and shall contain
measures in relation to Biosecurity.
(c) The CEMP shall include monitoring of adjacent waterbody upstream and downstream of
the proposed works and shall include daily visual checks of the receiving waters. Any
discharge, spillage or deposit of any polluting matter from the premises which enters or is
likely to enter any waters shall be reported to the relevant authority immediately.
(d) The mitigation measures in the Construction and Environmental Management Plan (CEMP)
shall be fully implemented and overseen by a suitably qualified Environmental Officer.
3. There shall be no instream works without prior approval from Inland Fisheries Ireland.
4. Abstractions should be in accordance with the Water Environment (Abstractions and
Associated Impoundments) Act 2022 and the Water Environment (Abstractions and Associated
Impoundments) Regulations 2024.
5. Any hazardous liquid waste, chemicals, greases, hydraulic fluids or oil/fuel storage containers
temporary or otherwise to be bunded and located within the Compound Area. Please note
that bunds are to be designed to contain 110 % of the capacity of the largest storage container
located within the bund. There shall be no overflow drain facility from any bunds on site and
all filling and off-take points shall be located within a bund.
6. All necessary refuelling of plant and equipment shall only take place within a designated
impermeable, bunded area, away from all drains/watercourses. Drip trays of adequate
capacity shall be provided to contain any spillage during refuelling. Emergency Spill kits shall
be maintained onsite at all times in the event of an accidental spill.
7. Storage of dry materials/chemicals shall be in sealed metal containers and shall be managed in
a manner which prevents the discharge of polluting matter to ground or surface water. Non-
hazardous dry materials shall be managed in a manner which prevents the discharge of
polluting matter to ground or surface water.
8. All proposed surface water drainage systems shall be designed to ensure that no polluting
matter enters the surface water collection system.
9. One month prior to the commencement of the development, the applicant shall submit a site
specific Construction and Demolition and By-Products Waste Management Plan for the
proposed development works. The plan shall be prepared using “Best Practice Guidelines for
the preparation of resource & waste management plans for construction and demolition
projects” – EPA, 2021.
10. Any construction and demolition waste or excess soil generated during the construction phase
which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the
Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately
permitted facility in accordance with the requirements of the Waste Management Act 1996 as
amended using authorised waste collectors authorised to collect the type of material for
disposal/recovery at authorised treatment facilities. The upkeep of a live Resource and Waste
Management Plan (RWMP) shall be maintained throughout the duration of the development.
11. If infilling material is required to be imported onsite the applicant shall conform to one of the
following;
i. Economic operator shall utilise EPA Article 27 notification in moving soil infill material
from one site to another. Official correspondence from the EPA granting approval
shall be submitted to the Planning Authority prior to commencement of development.
or
ii. If using waste material as infill and prior to acceptance of material a valid permit must
be issued by Monaghan County Council in accordance with the Waste Management
(Facility Permit and Registration) Regulations 2007 as amended.
or
iii. Buy topsoil material as a product for final landscaping purposes only. Documentation
demonstrating purchase shall be submitted to Planning Authority.
12. Facilities shall be provided for the collection and segregation of recyclable waste.
Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of
in accordance with the Waste Management Act 1996 as amended.
Signature: