Loading...
HomeMy WebLinkAbout2660018 - Application - Cover Letter www.mhplanning.ie Dublin 4th Floor, Kreston House, Arran Court, Arran Quay, Dublin 7, D07 K271 Tel: +353 (0)1 804 4477 CORK 6 Joyce House, Barrack Square, Ballincollig, Cork, P31 YX97 Tel: +353 (0)21 420 8710 Bantry The Old Schoolhouse, Summerhill, Bantry, Co. Cork, P75 VP95 Tel: +353 (0)21 420 8710 RE: Planning Application – Renewable Biogas Plant, Maghernakelly, Drumcall and Drumgole, Co. Monaghan – Request for 10-Year Permission A Chara, We McCutcheon Halley Planning Consultants act on behalf of Stream BioEnergy Ireland Limited of Adelphi Plaza, Dún Laoghaire, Co. Dublin, regarding a planning application for a Renewable Biogas Plant on a site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall, and Drumgole, Co. Monaghan. The proposed development generally comprises: • A Renewable Biogas Plant (approx. 6.2 hectares) to process 99,000 tonnes per annum of poultry manure and other biodegradable agricultural and agri-food wastes, generating renewable biomethane. The Plant encompasses buildings and structures including an administration and process buildings, digestate dryer, pellet storage, CHP, control building, boiler and plant room, with associated dispersion stacks. A bunded tank farm a gas holder, a CO₂ liquefaction plant, biogas upgrade plant, flare and storage tanks. Ancillary site works including car parking (35 spaces), covered cycle parking, landscaping, screening berms, fencing, retaining walls, site lighting, surface water drainage, foul effluent collection, wheel washes, weighbridges, internal circulation, pipe bridges, and signage. • Vehicular access improvements, including a new site entrance from the L2280, widening and realignment works along 200 metres of the L2280, and reconfiguration of the L2280 / R189 junction. • Reprofiling of approximately 2.6 hectares of agricultural land east of the R189 to improve land levels for continued agricultural use, using material from site formation. Planning Department Monaghan County Council 1 Dublin Street Monaghan H18 X982 28th January 2026 REC E I V E D : 2 8 / 0 1 / 2 0 2 6 2 Biogas will be upgraded to biomethane within the Renewable Biogas Plant and injected into the national gas grid via an associated gas grid connection. The pipeline route, to be delivered separately by Gas Networks Ireland under the Section 39A consent process (CRU-regulated), is located within the public road corridor (R189 and R188) through the townlands of Maghernakelly, Dernamoyle, Drumgarkin, Dyan, Freame Mount Demesne, Dawson Grove Demesne, and Dromore West, Co. Monaghan. This infrastructure is assesse d in the EIAR, but permission is not sought under this application. The proposed development is state of the art, designed in compliance with all relevant standards. The project represents a licensable activity under the Industrial Emissions Directive, with the required Environmental Protection Agency licence to be secured prior to operation. It supports national renewable energy, bioeconomy, and circular economy objectives, delivers regional environmental benefits through sustainable waste management, and promotes rural economic development. A Letter of Consent from the landowner and a Letter of Consent from Monaghan County Council (Roads & Transportation) are included. A Schedule of Documents submitted with this application is set out overleaf. A completed RED III completeness checklist is also included in below and we can confirm all relevant information is provided with the application documentation. The planning fee associated with Planning Reference 2560496 was paid by Electronic Funds Transfer (EFT) and was retained by the planning authority, as permitted, rather than refunded. As previously agreed, the fee is to be allocated to this application. Th e proposed development is subject to the maximum planning fee of €38,000, and accordingly a fee of €38,000 applies. The receipt for the EFT is attached to this cover letter. The EIAR Portal number and corresponding email confirmation are also enclosed in this application. We trust the enclosures with this application are sufficient to enable the Council to validate this application for permission, and should you have any queries please do not hesitate to contact the undersigned. We look forward to receiving your acknowledgement and decision in due course. Le gach dea ghuí, Paula Galvin (Director) McCutcheon Halley Chartered Planning Consultants REC E I V E D : 2 8 / 0 1 / 2 0 2 6 3 Schedule of Planning Documents No. Title Prepared by 1 Application Form McCutcheon Halley Chartered Planning Consultants 2 Site Notice 3 Press Notice 4 Letter of Consent from Land Owner 5 Letter of Consent from Monaghan County Council (Roads & Transportation) 6 Cover Letter 7 Planning Statement 8 EIAR Portal Confirmation 9 Water Protection Plan Checklist Stream BioEnergy Ireland Limited 10 Architectural Design Statement Vision Design Architecture 11 Architectural Drawings 12 Engineering Services Report McAdam Design Ltd. 13 Engineering Drawings 14 Climate Action and Energy Statement Metec Consulting Engineers 15 Light Impact Assessment Report Integrated Services Design (ISD) 16 Appropriate Assessment Screening Report VEON Ltd. 17 Proposed Road Improvement & Access Drawings Trafficwise Ltd. 18 Stage 1 Road Safety Audit (RSA) Traffico 19 Landscape Plan Macro Works (part of APEM Group) 20 Landscape Design Report 21 Photomontages REC E I V E D : 2 8 / 0 1 / 2 0 2 6 4 Schedule of EIAR’ Chapters Chapter Title Prepared by 1 Introduction McCutcheon Halley Planning Consultants 2 Project Description McCutcheon Halley Planning Consultants 3 Alternatives McCutcheon Halley Planning Consultants 4 Population & Human Health AWN Consulting 5 Landscape & Visual Macro Works (part of APEM Group) 6 Material Assets: Traffic & Transport Trafficwise Ltd. 7 Material Assets: Built Services AWN Consulting 8 Material Assets: Waste AWN Consulting 9 Land & Soils AWN Consulting 10 Water (Hydrology & Hydrogeology) AWN Consulting 11 Biodiversity VEON Ltd. 12 Noise & Vibration AWN Consulting 13 Air Quality AWN Consulting 14 Climate AWN Consulting 15 Cultural Heritage: Built Heritage & Archaeology AWN Consulting 16 Major Accidents & Disasters AWN Consulting 17 Summary of Mitigation and Monitoring Measures AWN Consulting REC E I V E D : 2 8 / 0 1 / 2 0 2 6 5 Schedule of EIAR’ Appendices Appendix No. Title 1.1 Cumulative Project List 1.2 Economic Impact Assessment 2.1 Outline Construction Environmental Management Plan 3.1 Site Selection Environmental Analysis 6.1 Traffic Counts 6.2 Network Flow Diagrams 7.1 Electrical Connection Feasibility 8.1 Resource & Waste Management Plan 8.2 Operational Waste Management Plan 9.1 NRA/TII Rating Criteria: Soils & Geological 9.2 Monaghan - County Geological Site Report 10.1 NRA/TII Rating Criteria: Hydrological & Hydrogeological 10.2 Flood Risk Assessment 10.3 Water Framework Directive Assessment 10.4 Groundwater Abstraction Feasibility Assessment 11.1 Arboriculture Survey Report 11.2 Additional Walkover Survey 11.3 Mammal Report 11.4 Bat Survey Report 11.5 Wintering Bird Survey Report 11.6 Breeding Bird Report 12.1 Glossary of Acoustic Terminology 12.2 Baseline Noise Survey Data 12.3 Noise Modelling Details 13.1 Air Quality Technical Information 15.1 Summary of relevant legislation 15.2 Excerpts of County Development Plan 15.3 Glossary of Impacts 15.4 Geophysical Survey Report 15.5 Testing Report REC E I V E D : 2 8 / 0 1 / 2 0 2 6 6 Schedule of Architectural Drawings Drawing No. Drawing Title Scale Page Size 4192 - PL01 Site Location Map 1:2500 A3 4192 - PL02 Existing Site Layout Plan 1:500 A0 4192 - PL03 Proposed Site Layout Plan 1:500 A0 4192 - PL04 Contextual Site Plan - Sections 1:1000 A0 4192 - PL05 Existing & Proposed Site Sections A -C 1:500 A0 4192 - PL06 Existing & Proposed Site Sections D-D, E-E 1:500 A0 4192 - PL07 Proposed Main Process Building & Odour Control System Floor Plan 1:200 A0 4192 - PL08 Proposed Main Process Building & Odour Control System Plans and Elevations As Shown A0 4192 - PL09 Proposed CHP Building & Boiler Floor Plans and Elevations 1:100 A1 4192 - PL10 Proposed Administration Building & Cycle Store Floor Plans and Elevations 1:100 A1 4192 - PL11 Proposed Control Room Plans and Elevations 1:100 A1 4192 - PL12 Proposed Digestate Treatment Plant Plans and Elevations 1:100 A1 4192 - PL13 Proposed Dryer Building & Pellet Storage Hall Floor Plans and Elevations 1:200 A1 4192 - PL14 Proposed Access Gates, Typical Fences & Floodlights Plans and Elevations 1:50 A1 4192 - PL15 Proposed Gas Flare, Fuel Storage Tank, Weighbridge, Wheelwash, Fan Coolers, Entrance Signage, Freshwater Storage Tank & Pipe Bridges Plans and Elevations As Shown A1 4192 - PL16 Proposed Hot Water Tank, Ammonia Stripper Tanks & Biological Feedstock Tanks Plans and Elevations 1:100 A1 4192 - PL17 Proposed Fire Water & Activated Carbon Unit Plans and Elevations 1:100 A1 4192 - PL18 Proposed Biogas Upgrade Plant Plan and Elevations 1:100 A1 4192 - PL19 Proposed Gas Holder Plans and Elevations 1:100 A1 4192 - PL20 Proposed CO2 Liquefaction Plant Plan and Elevations 1:100 A1 4192 - PL21 Proposed Digester Tanks & External Stairwell Plans and Elevations 1:200 A1 4192 - PL22 Proposed Sludge Buffer Tank , Evaporator Feed Tank, Condensate & Concentrate Tanks Plans and Elevations 1:200 A1 4192 - PL23 Proposed Plant Room, Gas Grid Entry Unit, Propane Storage Tanks & Backup Generator Plans and Elevations As Shown A1 4192 - PL24 Proposed Biological Desulphurisation Unit Plans and Elevations 1:100 A1 4192 - PL25 Proposed Parking Layout Plan 1:250 A3 REC E I V E D : 2 8 / 0 1 / 2 0 2 6 7 Schedule of Architectural Drawings Drawing No. Drawing Title Scale Page Size 1102 Proposed Retaining Structures 1:500 A1 1200 Site Cross Section - Proposed Retaining Structures 1:500 A1 2001 Proposed Storm Drainage Layout 1:500 A1 2002 Proposed Foul Drainage Layout 1:500 A1 2101 Proposed Watermains 1:500 A1 3001 Proposed Construction Details - Pavement Build Ups As shown A1 3002 Proposed Construction Details - Kerbing 1:10 A1 3003 Proposed Construction Details – Drainage Sheet 1 As shown A1 3004 Proposed Construction Details – Drainage Sheet 2 As shown A1 3005 Proposed Construction Details - Headwall 1:25 A1 3006 Proposed Construction Details - Drainage Sheet 3 1:75 A1 3007 Proposed Construction Details – Drainage Sheet 4 Not to Scale A1 3008 Proposed Construction Details-Drainage-Sheet 5 Not to Scale A1 3009 Proposed Construction Details - Watermains Not to Scale A1 Schedule of Proposed Road Improvement & Access Drawing No. Drawing Title Scale Page Size PL01 Junction Upgrade, Local Road Widening, Development Access 1:500 A1 PL02 Swept Path Assessment 1:200 A1 Schedule of Landscape Plan Drawing No. Drawing Title Scale Page Size LD.DRM 1.1 Landscape Mitigation Plan 1:1000 A1 REC E I V E D : 2 8 / 0 1 / 2 0 2 6 8 Schedule of Fees Classes Descriptions Sq.m HA. Fee Total Class 4 The proposed buildings comprise Main Process Building (including Odour Control System), Administration Building, Digestate Dryer Building, Pellet Storage & Distribution Building, Combined Heat and Power Building and Control Building 11,900 - €3.60 / sqm € 42,840.00 Class 8 Development also includes storage tanks and various items of plant and equipment. These structures have a foot print but no floor area. The full area has therefore been included. 11,100 1.11 €50/0.1 ha € 555.00 Class 9 2 no. Entrance Signs and a Directional Sign associated with the plant. 25.5 - €20 / sqm € 510.00 Class 13 Construction of Renewable Biogas Plant 87,661 8.7661 €10/0.1 ha € 876.61 Total € 44,781.61 The maximum planning application fee applies in accordance with Section 3, paragraph 4 of the Fee Schedule, where: The maximum fee payable to a planning authority by an applicant in respect of any planning application other than an application mentioned in paragraph 1, 2 or 3 shall be €38,000. The planning fee associated with Planning Reference 2560496 was paid by Electronic Funds Transfer (EFT) and was retained by the planning authority, as permitted, rather than refunded. As previously agreed, the fee is to be allocated to this application. REC E I V E D : 2 8 / 0 1 / 2 0 2 6 9 Planning Fee Proof of Payment (Previous) REC E I V E D : 2 8 / 0 1 / 2 0 2 6 10 RED III Application Completeness Checklist Requirement N/A Yes No Misc Correct Fee submitted Yes Completed copy of application form Yes Is the application in a Gaeltacht Area No Standalone website provided N/A Land Ownership Interest of applicant in land confirmed Yes – Lessee If not, written consent of owner submitted Yes Design Flexibility Was a Design Flexibility Opinion served No If Yes – Does application comply with the Opinion N/A Public Notices Is time period and fee for submissions/observations specified Yes Reference to REDIII and completeness check where applicable Yes Includes standalone website Address N/A Are notices in Irish if in Gaeltacht* N/A Transboundary environmental effects N/A Do COMAH Regulations (Major Accident Hazard Regulations 2015) Apply. No If Design Flex Opinion provided, is this referenced N/A Are EIAR and NIS referenced Yes – EIAR only Prescribed Bodies Have the Prescribed Bodies specified at conclusion of pre- application consultation been Notified (This only applies to application submitting to An Coimisiún Pleanála) N/A Planning Statement Renewable Energy designation policy statement Yes EIAR Have EIAR portal requirements been completed Yes REC E I V E D : 2 8 / 0 1 / 2 0 2 6 11 Are all Appendices included Yes Are derogations required/been obtained (biodiversity) N/A Does EIAR comply with Article 94 and Schedule 6 of PDR 2000 Yes NPWS survey, methodology requirements Yes Peat Stability/Landslide Susceptibility N/A NIS Is a screening report included Yes Are all appendices referenced included (No NIS required) N/A Drawings Site Location Map Yes Site Layout Plan – wayleaves, site notices Yes Are the Drawing Scales Appropriate Yes REC E I V E D : 2 8 / 0 1 / 2 0 2 6