Loading...
HomeMy WebLinkAbout25103 - Report Received from Internal Staff - Environment No 2ENVIRONMENTAL REPORT To: Planning Section From: Paul Sherlock, Environment Section Ref: 25/103 Ruth Russell, Feebane, Castleshane, Co. Monaghan Agent: Noel Murphy This planning application is relating to: ‘permission for retention of existing dwellinghouse and wastewater treatment and their position on site where these vary from the granted planning file No 7138, retain sunroom and kitchen extension along with separate utility room and coal/fuel store along with adjoining bedroom accessed from courtyard. Retain shed buildings adjoining dwellinghouse along with trailer unit used for storage. Retain entrances and accesses to the site, dwelling house and sheds along with all walls, fences, gates, walls, hedges ramps, steps and surface finishes. Retain pumphouse and fuel storage tanks along with parking area for one truck unit. Retain site boundary and fence positions’. The site is located within the Mullamurphy_010 waterbody. This waterbody is currently at Moderate Status. The site is located on an area of Low Ground Water Vulnerability with regionally important (R) aquifers Fissured bedrock (Rf). A water protectfon checklist has been included with the applicatfon. A site layout plan has been submitted with this applicatfon, however no drainage details have been provided. The site layout plan shows 4no. fuel storage tanks on site, however no details of bunding or interceptors have been provided. The informatfon submitted with this applicatfon is not sufficient to allow a determinatfon on the possible impacts of the proposed development on surrounding surface and ground waters. Therefore, it is recommended that the following additfonal informatfon is requested from the applicant. 1. Submit a revised site drainage plan which clearly outlines all foul lines (in red), storm lines (in blue) and oil interceptors as well as all associated outiall points. 2. Submit details of proposed bunding of the 4no. fuel tanks. All overground oil storage tanks shall be provided with an adequately designed reinforced concrete bund system complete with an impervious base. Filling and off-take points shall be located within a bund. Upon completfon of the bund(s) constructfon the applicant shall submit certfficatfon from a chartered engineer confirming the integrity of the overground bunds and to demonstrate that the bunds are in compliance with BS8007:1987 – Code of Practfce for the Design of Concrete Structures for Retaining Aqueous Liquids. 3. Submit details of proposed interceptor. All storm water arising from the truck parking area shall discharge to an appropriately sized and suitable class 1 interceptor prior to discharge. The interceptor shall be provided with appropriate warning device to indicate when required levels for maintenance have been reached and should be fitted with a sampling chamber, which has easy access. An inspectfon manhole shall be installed on the outilow pipe from the oil interceptors. SIGNED: DATE: 29/01/2026 Paul Sherlock Environment Technician Reviewed By: DATE: 29/01/2026