Loading...
HomeMy WebLinkAbout2560489 - Report Received from Internal Staff - MDMONAGHAN COUNTY COUNCIL THE MUNICIPAL DISTRICT OF BALLYBAY - CLONES PLANNING PERMISSION-ROAD CONDITION REPORT Planning Application No. 25-60489 Previous Ref.No’s. Applicant: Connolly Partnership Proposed Development: Planning permission is sought by Connolly Partnership for the construction a housing development on a site of 1.87 Hectares, consisting of a total of 45 dwellinghouses comprising of 5 No. single storey semi-detached houses; 40 No. two storey detached, semi-detached & terraced houses and, new site entrance onto existing public road R183, with associated amendment to the existing road frontage of the adjoining carparking at Connolly's Public House (Eircode A75CF58), connection to existing public sewer system, The development will provide for a total of 95 No. car parking spaces, bin stores; Landscaping, boundary treatments; public lighting; pedestrian & bicycle path through the site linking adjoining Cois Locha Estate subject to agreement, and all associated site infrastructure and engineering works necessary to facilitate the development Location: Doohamlat, Castleblayney,, County Monaghan, A75CF58 Adjoining Road: R-183 Notice on site: Yes Engineer’s Report No Objection, subject to the following: 1. Sight Distances/Entrance a) Prior to any other works commencing visibility splay of 49 metres, measured to the nearside road edge in both directions of the proposed site entrance, shall be provided from a point in the centre of the entrance 2.4 metres from the road edge at a height of between 1.05 metre and 2.0 metres above ground level to an object height of between 0.6 metre and 2.0 metres above ground level in both directions. The area within the visibility splays shall be cleared to provide a level surface no higher than 250 mm above the level of the adjoining carriageway and shall be retained and kept clear thereafter. b) The new entrance shall form a bellmouth of minimum 6.0 metres radius with edge of new boundary. Where it is necessary to remove hedges, fences, embankments or other obstructions to achieve the required visibility splays, they shall be reinstated behind the visibility splays. It is recommended that any new trees or shrubs are planted back from the visibility splays to allow for future growth, some species will require additional set back. All proposed planting must be kept trimmed behind visibility splays. MONAGHAN COUNTY COUNCIL THE MUNICIPAL DISTRICT OF BALLYBAY - CLONES c) Where the existing roadside hedge/embankment is to be removed, the roadside verge shall be widened (by grading back or infilling where necessary using appropriate inert material) to include the entire area within the visibility splays, top soiled, and grassed to the satisfaction of the planning authority. d) Applicant to install Gullies/ACO Channels at proposed entrance constructed in such a manner as to prevent water from the entrance/housing development flowing onto the public road. Similarly, measures must be taken to prevent road surface water from flowing onto the entrance. The discharge from the above to be piped to drainage pipeline. e) Dropped kerbs should be provided at the crossing to ensure good access for mobility impaired pedestrians and those with pushchairs or prams. The kerb upstands should be flush with the carriageway up to a maximum of 6mm. The footpath cross fall at these locations should preferably be 1:20, with a maximum of 1:12, to allow ease of use. f) Tactile paving should be provided for visually impaired pedestrians. Red tactile paving should not be used at uncontrolled crossings. A stem to the rear of the footpath should not be provided at uncontrolled crossings. g) Proposed pavement and footpath construction within the housing estate must be in accordance with the Monaghan County Councils Taking in Charge Procedures for Private Housing Developments, November 2010. h) All Road Construction to comply with TII Specification for Road Works Series 900 Road Pavements – Bituminous Materials. i) New proposed footpath to the East of the development to connect to existing footpath along the road (R-183). j) All Footpath Construction to comply with TII Specification for Road Works Series 1100 Kerbs, Footways and Paved Areas (CC-SPW-01100). k) Traffic Calming measure within the proposed site to be designed in such a way as to limit the speed of traffic to safe values without the use of vertical ramps. Design principles shall encourage low speeds the speed reduction measures can be inherent within the proposed development. l) No dwelling in this development shall be occupied until all recommendations outlined in the Road Safety Audit are completed. m) No development exempt or otherwise shall be erected over the public sewer, drain or water- main, unless otherwise agreed in writing with the planning authority. MONAGHAN COUNTY COUNCIL THE MUNICIPAL DISTRICT OF BALLYBAY - CLONES 2. Traffic Management a) The applicant will be required to put in place a Traffic Management Plan (TMP) for the duration of the construction works in accordance with Chapter 8 of the Department of the Environment’s Traffic Signs Manual 2010, the applicant must ensure the contractor shall also implement monitoring measures to confirm the effectiveness of the mitigation measures outlined in the TMP. On finalisation of the TMP, the contractor shall adopt the plan and associated monitoring measures. The final TMP shall address the following: - • Site Access & Egress. • Traffic Management Signage. • Routing of Construction Traffic • Timings of Material Deliveries to Site. • Traffic Management Speed Limits. • Road Cleaning. • Road Condition. • Enforcement of Traffic Management Plan. • Details of Working Hours and Days. • Details of Emergency plan. • Communication. • Construction Methodologies, and • Construction Impacts. b) In relation to Site Access and Egress, the applicant must ensure the contractor shall provide advanced warning signs, in accordance with Chapter 8 of the Department of the Environment’s Traffic Signs Manual 2010, on the approach to proposed site access locations a minimum of one week prior to construction works commencing at the site. c) Programming is required during the proposed works. To reduce impacts on residents adjacent to the proposed site the applicant must ensure the contractor adheres to the following: - • Shall be required to schedule deliveries in such a way that construction activities and delivery activities do not run concurrently e.g. avoid pouring of concrete on the same day as material deliveries to reduce the possibility of numbers of construction delivery vehicles arriving at site simultaneously, resulting in build-up of traffic on road network. • Shall be required to schedule deliveries to and from the proposed new development such that traffic volumes on the surrounding road access route are kept to a minimum. • Construction activities shall be undertaken during daylight hours for all construction stages. • Road Cleaning: - the contractor will be required to carry out road sweeping operations to remove any project related dirt and material deposited on any length of the road network by construction / delivery vehicles. Road Sweepers will be required to dispose of material following sweeping of road network, to licensed waste facility. • Vehicle Cleaning: - The contractor will be required to provide wheel washing facilities, and any other necessary measures to remove mud and organic material from vehicles exiting site. In addition, the cleaning of delivery trucks such as concrete delivery trucks shall be carried out within the new site development and not in the existing residential area. MONAGHAN COUNTY COUNCIL THE MUNICIPAL DISTRICT OF BALLYBAY - CLONES a) The applicant must consider Road Condition. The extent of the heavy vehicle traffic movements and the nature of the works may create problems such as fugitive losses from wheels, trailers or tailgates and localised areas of subgrade and wearing surface failure. The applicant must ensure that the contractor shall ensure that: - • Loads of materials leaving each site will be evaluated and covered if considered necessary to minimise potential dust impacts during transportation and the transportation contractor shall take all reasonable measures while transporting waste or any other materials likely to cause fugitive losses from a vehicle during transportation to and from site, including but not limited to: Covering of all waste or material with suitably secured tarpaulin/ covers to prevent loss and utilisation of enclosed units to prevent loss. • The roads forming part of the access route and the haul route shall be monitored visually throughout the construction period and a truck mounted vacuum mechanical sweeper to be assigned to roads along the access route and haul route as required. In addition, the contractor shall, in conjunction with the local authority undertake additional inspections and reviews of the road forming the access route and haul route one month prior to the construction phase to record the condition of the road at that time. Such surveys shall comprise, as a minimum, a review of video footage taken at that time, which shall confirm the condition of the road corridor immediately prior to commencement of construction. Upon completion of the construction of the proposed development, the surveys carried out at pre-construction phase shall be repeated and a comparison of the pre and post construction surveys carried out. Where such comparative assessments identify a section of road as having been damaged or as having deteriorated because of construction traffic, the road will be repaired to the pre-construction standard or better. 3. Drainage Conditions a) Prior to construction any pumping of groundwater or discharge of any other trade effluent, under the relevant Water Pollution Acts, the applicant is obliged to apply for a discharge licence from the Local Authority. b) The discharge of surface water from the public road onto the site through road surface drainage and road subsoil drainage to remain unimpeded. c) All surface water management/SUDs work shall comply with Monaghan County Council Technical guidance document (2017). d) The Local Authority must be notified at least 10 days in advance of the commencement of any proposed drainage works. The Local Authority reserves the right to inspect drainage works during construction to ensure compliance. Pipelines and manholes are to be inspected and tested as required by the Local Authority. The Local Authority shall be afforded the opportunity to attend the pipeline testing and should be given three working days’ notice of same. A connection to the public system will not be granted until evidence of the pipeline/s having passed the relevant test is submitted. e) Where work is to be carried out in the public roadway, consent and relevant road opening licence must be obtained from the Local Authority. MONAGHAN COUNTY COUNCIL THE MUNICIPAL DISTRICT OF BALLYBAY - CLONES f) Prior to commencement of construction works Applicant shall carry out a comprehensive drainage area survey on existing storm drainage system downstream of proposed connection point to ascertain condition and capacity of existing pipes and culverts. This study should include the following, a comprehensive manhole study, a complete CCTV survey including report of existing storm drains, Impermeable Area Studies Survey and a Flow and load survey. Details of all the above to be discussed and agreed with District Engineer prior to construction. g) Surface water attenuation for this proposed development to be designed to catering for the 1/100-year storm event with an allowance of 20% for climate change. h) On completion of construction works, all surface water drains shall be thoroughly cleansed to ensure that no construction material enters the public surface water drainage system. A condition survey shall be carried out on all main pipelines, to include both a CCTV survey and a written report. Please Note drain cleaning and CCTV survey to be completed following construction works to the point of entry to existing main. i) Before any work is commenced on this development a security, by way of a cash deposit, in the sum of €2,250.00 is to be paid to the Planning Authority by the developer. To ensure the satisfactory completion of all surface water drainage/boundary work within and abutting the site area, to prevent runoff of surface water onto the public roadway and to ensure that no damage is caused to public roadway and any such damage is repaired satisfactory Signed: ________________ DATE: 05/02/2026 K Connolly Assistant Engineer