Retention permission for an existing external
yard storage building with full permission
sought for a change of use from an existing
retail outlet (RB Coogan) to a timber frame
manufacturing facility with ancillary office and
staff facilities; elevational changes, new
signage, an extension to the existing external
yard storage building, alterations to the
existing car parking areas, revised boundary
treatments and all associated site development
works at RB Coogan,s Hardware, Lakeview
Business Park, Castleblayney, County
Monaghan, A75 A386; for Fine Living Timber
Frames Limited. RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
FLOOD RISK ASSESSMENT
COMPLIANCE REPORT
Project
Retention permission for an existing external yard storage building
with full permission sought for a change of use from an existing
retail outlet (RB Coogan) to a timber frame manufacturing facility
with ancillary office and staff facilities; elevational changes, new
signage, an extension to the existing external yard storage building,
alterations to the existing car parking areas, revised boundary
treatments and all associated site development works at RB
Coogan,s Hardware, Lakeview Business Park, Castleblayney,
County Monaghan, A75 A386; for Fine Living Timber Frames
Limited.
Client FINE LIVING TIMBER FRAMES LIMITED
RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
CONTENTS
SECTION A – INTRODUCTION Page
1. Scope of Report Page 4
2. Philosophy and Approach Page 4
3. Format of Report Page 5
4. Key Project Details Page 5
SECTION B – SUDS DESIGN AND PROPOSED WORKS Page
5. Development Description & Site Location Page 6
6. Initial Flood Risk Assessment Page 7
7. Screening Assessment Page 8
8. Scoping Assessment Page 11
9. Justification Test Page 13
10. Mitigating Flood Risk- Page 15
Mitigation Measures,
Flood Resilient Construction Measures.
SECTION C – CONCLUSIONS Page
11. Conclusion Page 17
12. Declaration Page 17
APPENDIX A Page
Flood Map.ie Site Maps Page 18
RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
SECTION A
Introduction
1 Scope of Report
This report is submitted with drawings and other documentation in support of providing a Flood Risk
Assessment for ‘‘Retention permission for an existing external yard storage building with full
permission sought for a change of use from an existing retail outlet (RB Coogan) to a timber frame
manufacturing facility with ancillary office and staff facilities; elevational changes, new signage, an
extension to the existing external yard storage building, alterations to the existing car parking areas,
revised boundary treatments and all associated site development works at RB Coogan,s Hardware,
Lakeview Business Park, Castleblayney, County Monaghan, A75 A386; for Fine Living Timber Frames
Limited’’for Fine Living Timber Frames Limited.
In this report, it is demonstrated that the proposed works, if constructed in accordance with the
drawings and design details submitted with the application, together with performance
requirements prescribed in this Report, will comply as far as possible with The Planning System and
Flood Risk Management Guidelines for Planning Authorities.
The subject of the Flood Risk Assessment is limited to the proposed development site and adjoining
lands as identified on the accompanying drawings.
2 Philosophy and Approach
The underlying philosophy and approach adopted by the designers is to review the subject
development site and adjoining lands and ensure the development as proposed is not and does
not present a flood risk as proposed and to make recommendations to support this commitment,
Joseph Cotter Engineer & Surveyor, procedures require preparation of the FLOOD RISK ASSESSMENT
REPORT Checklists throughout all stages of the planning and development process:
• Prior to sign-off of Definitive Project Brief
• At the sketch stage
• At the tender stage
• At the placing of the contract
• At the construction stage
3 Format of Report
The report will be subdivided using the following subheadings:
• Development Description & Site Location
• Initial Flood Risk Assessment
• Screening Assessment
• Scoping Assessment
• Justification Test
• Flood Risk- Mitigation Measures, Suds Flood Resilient Construction Measures.
RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
4 Key Project Details
Fine Living Timber Frame Limited have appointed Dowdall Architects to prepare a Suds Design
Proposal for development consisting of Retention permission for an existing external yard storage
building with full permission sought for a change of use from an existing retail outlet (RB Coogan) to
a timber frame manufacturing facility with ancillary office and staff facilities; elevational changes,
new signage, an extension to the existing external yard storage building, alterations to the existing
car parking areas, revised boundary treatments and all associated site development works at RB
Coogan,s Hardware, Lakeview Business Park, Castleblayney, County Monaghan, A75 A386; for Fine
Living Timber Frames Limited.
RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
SECTION B
Flood Risk Assessment
5 Development Description & Site Location
Fine Living Timber Frame Limited have appointed Dowdall Architects to prepare a Suds Design
Proposal for development consisting of Retention permission for an existing external yard storage
building with full permission sought for a change of use from an existing retail outlet (RB Coogan) to
a timber frame manufacturing facility with ancillary office and staff facilities; elevational changes,
new signage, an extension to the existing external yard storage building, alterations to the existing
car parking areas, revised boundary treatments and all associated site development works at RB
Coogan,s Hardware, Lakeview Business Park, Castleblayney, County Monaghan, A75 A386; for Fine
Living Timber Frames Limited.
Site Location:
The proposed site is located at lands in the Lakeview Business Park, off the R181, Castleblayney, Co.
Monaghan. The development is to utilise the existing business park access road off the R181.
Figure 1: Site Location Map. (Refer to Architects Drawings for Scaled Site Map)
6 Initial Flood Risk Assessment
In accordance with ‘The Planning System and Flood Risk Management – Guidelines for Planning
Authorities’ the flood risk assessment for the proposed development site is undertaken in three
principles stages. The three stages are as follows:
Stage 1) Screening Stage 2) Scoping Stage 3) Assessing RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
Possible Flooding Mechanisms
Table 1: Identifies the possible Flooding Mechanisms pertaining to the proposed development.
Source/Pathway Significant Comment/Reason
Tidal No The site is not with a Coastal Location
Pluvial (Urban Drainage) Possible
The development is surrounded by housing and
commercial developments to the north, south and
east and is in an area that map experience pluvial
flooding.
Fluvial
(Surface/Overland Flow) Possible
Site is in location that may experience Fluvial flooding,
due to in location to laugh Muckno and the Finn
catchment.
Artificial Drainage
System No
No History of Flooding due to capacities of
culverts/drainage channels, burst Watermains of
failed pumping stations.
Groundwater No
No information on groundwater levels is available for
the site and its vicinity; However, there are no
apparent springs in the immediate vicinity of the
development.
7 Screening Assessment
The purpose of the screening assessment is to establish the level of flooding risk that may or may not
exist for a particular site and to collate and assess existing current of historical data and information
which may indicate the level or extent of any flood risk.
Screening
The Screening exercise undertaken as part of the Flood Risk Assessment has considered and
consulted the follow:
• Walk Over/Level Survey
• Review of OPW.ie/en/floodplans
• Ordnance Survey Historical Maps
• Review of Strategic Flood Risk Assessment for Monaghan County Council
Development Plan 2025-2031.
The national Catchment Flood Risk Assessment and Management (CFRAM) program
commenced In Ireland in 2011, and the flood mapping produced in 2016 for the North
Western and Neagh Bann River Basin Districts. Relevant maps and modelled flood levels
were downloaded from the OPW web portal and are contained in the Appendix of this
report. RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
The best available information on the likelihood of flooding within the site area is on the map
produced in 2016 by OPW/RPS as part of the North Western and Neagh Bann CFRAMS
exercise and on the Floodmaps.ie portal. See attached in appendix A.
Following a review of the map the likelihood of the site flooding lies outside the 0.1% (1in1000)
for Coastal/Tidal Flooding and can be deemed to be located in Flood Zone C and isn’t at
risk from Coastal Flooding.
The site also lies outside the risk of flooding from pluvial flooding, the nearest recorder of
flooding to the site occurred some 550m Northwest of the development site and did not
impact on the site, see attached report in Appendix A.
Ponding of water is noted to the north eastern corner just outside the development site
boundary. The depth of ponding is in the region of 250-300mm. the ponding appears to be
due to an overspill from an open drain which runs along the western boundary. A review of
the site location map it appears that the lands to the north west of the development site
have been filled including an open drain, this has pushed the water in to a low-level spot
between the development site boundary and the adjoining lands.
This FRA sought to establish the potential risk to the development and the surrounding areas. In order
to accomplish this, a review of the possible flood risks was carried out and as identified
in Appendix A and Investigated as described below:
• Tidal
Site is not at risk of Tidal Flooding
• Fluvial
Site is shown not to be at risk of Fluvial flooding from Lake Muckno and the Finn
Catchment Area.
• Drainage System
The details of the drainage arrangement on site is beyond the remit for this report,
however, the developer will ensure that they comply with the MCC's drainage
requirements for existing developments. The existing drainage system around the site
utilises piped sewers. It is therefore likely that during very intense and severe events
drainage system elements, such as road gullies, can be overwhelmed. Similarly, when
there is a failure such as a blockage of the existing road drainage, this could lead to RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
ponding on the road (the low-lying area). Once the water level is sufficiently above
the kerb (footpath) level it would enter the site and potentially result in some level of
flooding to the development. However, the depth of such ponding on this site is
expected to be shallow and will be quickly conveyed towards the public drainage
network.
• Overland Flooding
Only during an extreme rainfall event that overwhelms the road drainage system is
there a risk that some overland flows may occur onto the site, However, the depth
of such a flow is expected to be very shallow and will not impend on the proposed
building levels as the finished floor levels will be in excess of 250mm above road gully
levels.
If the car park and access road where to flood the depths would be less than 250mm
and pedestrians and vehicles could still pass through.
• Groundwater Flooding
Groundwater flooding can occur when the water table rises to or just above the
ground surface. However, there is no evidence of any groundwater flooding to the
properties at present. The risk of groundwater flooding at the development site is
therefore considered to be low. The level of the site is to be which will further reduce
the risk of ground water flooding at the development site. RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
8 Scoping Assessment
The Purpose of the scoping stage is to identify possible flood risks and to implement the
necessary level of detail and assessment to assess the possible risk and to ensure these can
adequately addressed in the flood risk assessment. The scoping exercise should also identify
that sufficient information is already available to complete a flood risk assessment appropriate
to the scale and nature of the development.
In this instance the flood risk assessment is undertaken in consideration of Fluvial flooding, due
to the site’s location to Lake Muckno and the Finn Catchment Area.
The purpose of the screening assessment is to establish the level of risk of flooding risk which
may or may not occur for the site and to collate and assess existing current or historical
information and data which may indicate the level or extent of any flood risk.
The best available information on the likelihood of flooding within the site area is on the map
produced in 2016 by OPW/RPS as part of the CFRAMS exercise and in the Monaghan County
Council Strategic Flood Risk Assessment prepared for the Monaghan County Council
Development Plan 2025-2031.
Following a review of the map the likelihood of the site flooding is outside the 0.1% (1in100) for
Fluvial Flooding and is not at risk of coastal flooding. The site can be classified to lie in Flood
Zone C in “The Planning System and Flood Risk Management Guidelines for Planning
Authorities.
Assessing Flood Risk
In the context of “The Planning System and Flood Risk Management Guidelines for Planning
Authorities – 2009, Three Zones of Flooding are identified.
Flood Zone A
Probability of flooding from rivers and the sea is highest (greater than 1% or 1 in 100 for river
flooding or 0.5% or 1 in 200 for coastal flooding).
RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
Flood Zone B
Probability of flooding from rivers and the sea is moderate (between 0.1% or 1 in 1000 or 1 in
100 river flooding and between 0.1% or 1000 year and 0.5% or 1 in 200 for coastal flooding.
Flooding Zone C
Probability of flooding from rivers and the sea is low (less than 0.1% or 1 in 1000 years for both
river and coastal flooding).
The consequences of flooding are highly dependent on the type of development, this is
illustrated in table 3.1 of “The Planning System and Flood Risk Management Guidelines for
Planning Authorities – 2009, Table 3.1 of the guidelines contains three different classifications:
1) Highly Vulnerable Development
2) Less Vulnerable Development
3) Water Compatible development
Development of Classification
The proposed development based on table 3.1 of the guidelines is classified as Less Vulnerable
Development and falls under Flood Zone C.
Flood Zone A Flood Zone B Flood Zone C
Highly Vulnerable
Development
Justification Test Justification Test Appropriate
Less Vulnerable
Development
Justification Test Appropriate Appropriate
Water Compatible
development
Appropriate Appropriate Appropriate
The above table read in conjunction with table 3.1 of the “The Planning System and Flood
Risk Management Guidelines for Planning Authorities – 2009 illustrates the appropriate
development and what is required to meet the Justification Test.
RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
9 Appropriate/Justification Test.
The OPW Guidelines further acknowledge that were existing buildings are involved, the
sequential approach cannot be used to locate them in lower risk areas and the Justification
test will not apply. In these cases, the OPW Guidelines state that a commensurate assessment
of the risk of flooding should accompany such application to demonstrate that they would not
have adverse impacts or impede access to watercourse, floodplains or protection and
management facilities.
Commensurate assessment
• No floods have been recorded in the development site immediate location; the
nearest flood record was 550m to the Northwest and did not impact on the
development site.
• The development is for Retention permission for an existing external yard storage
building with full permission sought for a change of use from an existing retail outlet (RB
Coogan) to a timber frame manufacturing facility with ancillary office and staff
facilities; elevational changes, new signage, an extension to the existing external yard
storage building, alterations to the existing car parking areas, revised boundary
treatments and all associated site development works.
• The development site is zoned General employment and suitable for the proposed use.
• The development proposed to include new SUDS Measures and address any short
coming with the existing drainage network which will have a positive impact on the
development site and adjoining lands. The SUDS Measure include an additional 20%
capacity for climate change and take account of any new hard standing areas
created as part of the application.
• Footpaths and Pavement area within the development site are above the 10% AEP
Flood Level and will ensure pedestrians and vehicles will be free to move within the site
in safety during an extreme 10% AEP Flood event and allows emergency vehicles to
attend site.
• Does not obstruct an important flow path.
• Does not entail the storage of hazardous material.
RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
• Does not impede access to a watercourse, floodplain of flood protection and
management facilities.
• The development proposes Mitigating Flood Risk Measures as outline below in section
10 of the report.
None of the adverse impacts highlighted in section 5.28 apply to the development in question
and it is our conclusion that the development is permissible under the guidelines and the passes
the appropriate / justification test.
10 Mitigating Flood Risk
It is necessary to protect and minimize the impact flooding may have on the development
and the surrounding area.
The following measures are to be taken to ensure as far as reasonable possible the proposed
development and surrounding areas are protected from flooding:
1) Apply Flood Resilient Construction Measures.
2) Apply Suds to the site – (see attached separate report).
• Flood Resilient Construction Measures
Flood Resilience construction measures are works carried out to the structure and
services of the proposed building to ensure the building is more robust and easier to
clean/dry out and repair in the event of flood water entering the building.
The following Resilience Construction measures will be carried out:
1. All Electric sockets/cabling to be constructed above 500mm above the 3.28m 10%
AEP Flood Level.
2. All Sanitary drains to be fitted with non-return/backflow valves to prevent sewage
surging up through the wc’s, sinks etc.
3. Floors to be concrete with robust dpm to resist floodwater and rising groundwater.
4. Treat Structural steel to prevent rust and corrosion.
5. Openings such as air vents to be constructed as high as possible. RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
SECTION C
11 Conclusion
Based on the examination of the development site, and of its location and all development
works relating to the application as proposed we have taken account and applied ‘’The
Planning System and Flood Risk Management Guidelines for Planning Authorities’’ in this Site-
specific Flood Risk Assessment.
The results for the Appropriate / Justification test show the proposed development with the
measures outlined in section 10 of the report will not represent a flood risk.
We feel this application as proposed should be granted planning permission as it put into place
measures to minimize any potential risk to people, the property and the environment, and it is
located within an area where development is permitted under Section 5.28 of “The Planning
System and Flood Risk Management Guidelines.
In our professional opinion the granting of an of Retention of a store building and the proposed
change of use of an existing commercial building in this location will have no impact on
flooding and will not increase the flood Risk to the development site or the surrounding areas.
Future recommendations would be for the area to the Northwest of the site which is
experiencing ponding, be pipe and provide with attenuation to take account of the volume
of ponding. The area currently lies outside of the development application boundary.
12 Declaration
We have endeavoured in my report and in my opinion to have covered all relevant issues
concerning the matters stated, which I have been asked to address, and the opinions
expressed represent my true and complete professional opinion.
I have endeavoured to include in my report those matters of which I have knowledge and of
which I have been made aware which might adversely affect the validity of my opinion.
I have indicated the sources of all the information that I have used.
I have where possible formed an independent view on matters. Where I have relied upon
information from others I have so disclosed in my report.
I will notify those instructing me immediately and confirm in writing if, for any reason, my existing
report or opinion requires any correction or qualification.
Dated: 12th March 2026
RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
Appendix A
• OPW Flood Maps.
• Castleblayney – Strategic Flood Risk Assessment MCC
Development Plan 2025-2031.
RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
RECEIVED: 16/03/2026
CHANGE OR USE OF EXISTING RETAIL OUTLET TO TIMBERFRAME MANUFACTURING FACILITY AT LAKVIEW BUSINESS PARK, CASTLEBLAYNEY.
Prepared by JOSEPH COTTER - ENGINEER
RECEIVED: 16/03/2026