Loading...
HomeMy WebLinkAbout2660048 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT To Planning From: Kieran Kerley, Environment Section Ref: 2660048_ Cormac & Loretta Fitzpatrick, Alts, Carrickmacross, Co. Monaghan. Agent: Ronan Fitzpatrick, Craft Studio Architecture. This application is for planning permission for a development which will consist of a single storey extension and elevational amendments to an existing dwelling. Also included is the relocation of the site entrance, new access lane and parking area, garage, proposed wastewater treatment system and percolation area and all associated site works at Alts, Carrickmacross, Co. Monaghan as per application no. 2660048. The proposed development is located within the Glyde 30 waterbody, this waterbody has been classified as being of good status 2016-2021 with a protect 2027 objective. The site is also located on Louth groundwater body, a poorly productive bedrock of good status and medium groundwater vulnerability. The WFD characterisation has identified agriculture (pasture and farmyards) as a significant pressure in this waterbody. I have no objection to granting permission for this development subject to the following conditions; It is noted that the file has been referred to EHO for assessment of wastewater proposals. ENV 1 Water Protection 1. One month prior to commencement of development, submit a fully complete water protection checklist. 2. The applicant shall ensure completely separate foul and surface water drainage systems are in place. 3. The wastewater treatment system and infiltration area shall be maintained in accordance with manufacturers specifications. 4. Waste arising from the desludging of the wastewater treatment system shall be collected by a suitably permitted collector in accordance with the Waste Management Act, 1996 as amended. 5. The applicant shall ensure that adequate measures are in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any watercourse. These measures shall be in accordance with guidance produced by Inland Fisheries Ireland titled “Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters 2016”. This document is available to download at https://www.fisheriesireland.ie/publications. 6. The applicant shall immediately inform the Planning Authority & Inland Fisheries Board of an accidental spillage of wastewater, organic fertiliser, fuel, machine oil or any other substance which may threaten the quality of any watercourse or groundwater body. Reason: In the interest of environmental protection and public health. ENV 2 Waste Management 1. Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. 2. If infilling material is required to be imported onsite the applicant or economic operator shall: (a) Utilise EPA By-Product Regulation 27 in moving soil infill material from one site to another. Official correspondence demonstrating Article 27 Registration with the EPA shall be submitted to the Planning Authority prior to commencement of development. or (b) If using waste material as infill and prior to acceptance of material a valid permit must be issued by Monaghan County Council in accordance with the Waste Management (Facility Permit and Registration) Regulations 2007 as amended. or (c) Buy topsoil material as a product for final landscaping purposes only. Documentation demonstrating purchase shall be submitted to Planning Authority. 3. Prior to commencement submit to Environment services, a site specific Construction & Demolition Resource Management plan for approval. Applicant to consider Best Practice Guidelines for the preparation of Resource & Waste Management Plans for construction and demolition projects. 4. Prior to commencement of any demolition works, if required, an Asbestos survey and removal plan for the proposed development works must be submitted. 5. All waste oils and any other hazardous waste materials shall be stored appropriately and collected, recovered or disposed of in accordance with the Waste Management Act 1996 as amended, and records of such shall be kept on site. 6. (i) All hazardous liquid waste or oil/fuel storage containers, temporary or otherwise, shall be bunded. (ii) All bunds will be designed to contain 110 % of the capacity of the largest storage container located within the bund. (iii) There shall be no overflow drain facility from any bunds on site and all filling and off-take points shall be located within a bund. 7. Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act, 1996 as amended. Reason: In the interest of environmental protection and public health. Prepared By : Kieran Kerley Environmental Technician DATE: 07/04/2026 Approved : Date: 07/04/2026