HomeMy WebLinkAbout2660056 - Chief Executives AI OrderMONAGHAN CO. COUNCIL
PLANNING AND DEVELOPMENT ACT 2000 (as amended)
Chief Executive's Order No:
Reference Number:
Name of Applicant:
P357-26ai
26/60056
Connolly & McCabe Accountants
Address: Owen Cunningham
Thornford Lodge
Broomfield
Castleblayney
A75HE16
Nature of Application: Permission for a development which will consist of the following:
First floor extension to rear of existing two storey office building
and all associated site development works
Location of Development: Unit 4 Mall Rd Tirkeenan Monaghan
ORDER:
I hereby order that pursuant to the provisions of the Planning and Development Act 2000 (as amended) and
Article 33 of the Planning and Development Regulations 2001 (as amended), the further information set out
on the attached schedule be requested from the applicant.
SENIOR PLANNER
DATE
26/60056 Connolly & McCabe Accountants Unit 4 Mall Rd, Tirkeenan, Monaghan
ADDITIONAL INFORMATION
1. The proposed development is considered insufficient in terms of the environmental information
provided. In this regard, the applicant is requested to submit:
a) A fully completed water protection checklist.
b) Confirmation of Feasibility from Uisce Eireann that Monaghan WWTP has the capacity to
accept wastewater arising from the development.
c) A revised site layout plan, scale 1:500, demonstrating the following:
i. All surface/storm water drainage systems (outlined in blue).
ii. The directional flow of all surface water pipelines.
iii. All associated discharge points and outfalls.
iv. All foul water drainage systems (outlined in red).
d) A Construction and Demolition and By -Products Waste Management Plan for the proposed
development works. The plan shall be prepared using "Best Practice Guidelines for the
preparation of resource & waste management plans for construction and demolition projects"
— EPA, 2021.
e) An Asbestos Survey and Removal Plan for the proposed development works if asbestos is
present.
f) A Construction and Environmental Management Plan CEMP). This plan shall be sufficient to
demonstrate that adequate measures will be in place for the construction phase to ensure
there is no discharge of polluting matter/sediment laden waters to any waters. The
Construction and Environmental Management Plan shall take account of best practice and the
guidance produced by Inland Fisheries Ireland titled "Guidelines on Protection of Fisheries
during Construction Works in and Adjacent to Waters 2016".
The planner dealing with this application is Liam Ward