HomeMy WebLinkAbout2560462 - Report Received from Internal Staff - Environment No 2 (2)ENVIRONMENTAL REPORT To Planning From: Kieran Kerley, Environment Section Ref: 2560462, Fergal Mc Crudden, Knocknagrave, Tydavnet, Co. Monaghan Agent: Paraic Fay This application is for planning permission to demolish 1 No. existing poultry house (and ancillary structures) and to construct 2 No. poultry houses, 1 No. ancillary store and 1 No. Manure loading area together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s) and site works associated with the above development at Knocknagrave, Tydavnet, Co. Monaghan as per application no. 25/60462. The proposed development is located close to the Mountain Water 030, also known as the Knocknagrave Stream. This waterbody has been classified as good status 2019-2024 with a maintain as good 2027 objective. The site is also located on the Knockatallon groundwater body, a productive fissured/karstified bedrock of good status and in an area of low groundwater vulnerability. The WFD characterisation has identified agriculture (pasture and farmyards) as a significant pressure in this waterbody. The development site is also located 1.1km east of the Sliabh Beagh Natura 2000 site. In order to make a fully informed decision on the application the following additional information, outlined in bold was requested with observations outlined in red. 1. A farmer full Nutrient Management Plan for the holding which takes into account all organic fertilisers, soiled waters and effluents produced by the bovine and poultry aspects of the enterprise that are intended to be spread on the holding. Applicant has communicated that he doesn’t keep any cattle on the holding so original Nitrogen statement for the holding will suffice. 2. Submit a Construction Environmental Management Plan (CEMP), this plan shall take account of guidance produced by Inland Fisheries Ireland titled “Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters 2016”. This document is available to download at https://www.fisheriesireland.ie/publications. This has been submitted as part of the FI requested 3. (i) A Construction and Demolition and By-Products Waste Management Plan for the proposed development works. The plan shall be prepared using “Best Practice Guidelines for the preparation of resource & waste management plans for construction and demolition projects” – EPA, 2021. This has been submitted as part of the FI requested (ii) An Asbestos Survey and Removal Plan for the proposed or completed demolition works. Applicant does not believe that the building, which was constructed in the 1990’s, contains any asbestos based materials but will conduct an asbestos survey before commencement of demolition. 4. Demonstration of calculations and information sources used in determining the current and proposed ammonia production of the poultry enterprise. Information submitted states that using system OW2004 09V1 ammonia emissions are reduced as per application. 5. Revised letter from CLR Co-Op detailing the arrangement to collect poultry litter on a weekly basis from the proposed development. Letter received from CLR Co-Op dated 27/03/2026. Given this additional information received I have no objection to planning permission for this development subject to the following conditions; ENV 1 GAP Regulations The development/facility shall be operated in accordance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2025. Reason: In the interest of environmental protection and public health. ENV 2 Building specification All buildings shall be designed and built in accordance with Department of Agriculture, Food & the Marine specifications. Reason: In the interest of orderly development. ENV 3 Utilization of soiled waters. (i) All soiled waters shall be directed to a storage tank. (ii) no polluting matter including soiled water shall discharge or be allowed to discharge to any stream, river, watercourse, groundwater body or to the public road. (iii) All soiled waters shall be collected, stored and utilised in accordance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2025. Reason: In the interest of environmental protection and public health. ENV 4 Disposal of uncontaminated surface water a) All uncontaminated roof water from buildings and yard water shall be separately collected and discharged in a sealed system to existing drains, streams or adequate soakpits and shall not discharge or be allowed to discharge to the foul effluent drains, foul effluent and slurry storage tanks or to the public road. b) All drainage works shall be carried out in accordance with agreed details. Reason: In the interest of environmental protection and public health. ENV 5 Storage of Organic Fertiliser All organic fertiliser generated by the development shall stored in accordance with the requirements of the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2025. Reason: In the interest of environmental protection and public health. ENV 6 Utilisation of Organic Fertiliser All organic fertiliser generated by the proposed development shall be utilised in accordance with the details submitted to the Planning Authority and in accordance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2025. Reason: In the interest of environmental protection and public health. ENV 7 Contractor/Haulier Organic fertiliser shall be taken offsite by the contractor/haulier as stated in the planning application. This contractor must be registered with the Department of Agriculture Food and Marine and the organic fertiliser shall be utilized in accordance with the requirements of the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2025. Any changes in contractor shall be agreed in writing with the Planning Authority. Reason: In the interest of environmental protection and public health. ENV 8 Poultry/Livestock Type & Numbers There shall be no change in poultry type or increase in the numbers of poultry being accommodated at this site unless otherwise agreed in writing with the Planning Authority. Reason: In the interest of environmental protection and public health. ENV 9 Waste Management 1. Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. 2. If infilling material is required to be imported onsite the applicant shall conform to one of the following; i. Economic operator shall utilise EPA Article 27 By-Product notification in moving greenfield soil and stone material from one site to another. Official copy of Registration from the EPA noting soil movements shall be submitted to the Planning Authority prior to commencement of development or ii. If using waste material as infill and prior to acceptance of material a valid permit must be issued by Monaghan County Council under the Waste Management (Facility Permit and Registration) Regulations 2007 as amended. or iii. Buy topsoil material as a product for final landscaping purposes only. Documentation demonstrating purchase shall be submitted to Planning Authority. 3. The site shall be managed in accordance with the Construction Environmental Management Plan (CEMP) and Resource and Waste Management Plan submitted. The implementation of these plans shall be overseen by a suitably qualified person. 4. An asbestos survey and removal plan(if applicable) shall be completed in advance of demolition works. 5. All waste oils and any other hazardous waste materials shall be stored appropriately and collected, recovered or disposed of in accordance with the Waste Management Act 1996 as amended, and records of such shall be kept on site. 6. (i) All hazardous liquid waste or oil/fuel storage containers, temporary or otherwise, shall be bunded. (ii) All bunds will be designed to contain 110 % of the capacity of the largest storage container located within the bund. (iii) There shall be no overflow drain facility from any bunds on site and all filling and off-take points shall be located within a bund. 7. Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act, 1996 as amended. Reason: In the interest of environmental protection and public health. ENV 10 Pollution Control The site shall be managed in a manner which prevents the discharge of polluting matter to any waters. The applicant shall immediately inform the Planning Authority & Inland Fisheries Board of an accidental spillage of wastewater, organic fertiliser, fuel, machine oil or any other substance which may threaten the quality of any watercourse or groundwater body. Reason: In the interest of environmental protection and public health ENV 11 Ammonia Abatement Within six months from date of grant of planning permission, an ammonia management programme outlining ammonia reduction measures, including timeframes for implementation, appropriate for the site, shall be submitted to the planning authority. The ammonia management programme shall be reviewed annually, and a copy of the reviewed ammonia management programme shall be submitted annually to Monaghan County Council by December 31st. The reduction in ammonia emissions from the site using Best Techniques (BAT) shall be detailed in the annual ammonia management programme Available. Reason: In the interest of environmental protection and public health. Prepared By : Kieran Kerley Environmental Technician DATE: 17/04/2026 Approved : Date: 17/04/2026