HomeMy WebLinkAbout2660006 - Notification of Decision
24/04/2026
Ref No: 26/60006
TO: Padraig McMahon & Aiveen Murray
C/O Niall Smith
Hall Street
Kingscourt
Co. Cavan
A82 K8A0
Re: Planning and Development Act 2000 (as amended)
NOTIFICATION OF DECISION
Monaghan County Council has by order dated 23/04/2026 decided to GRANT permission to the above
named for development of land, in accordance with the documents submitted namely for:- permission
sought to construct a single storey detached dwelling, detached domestic garage, new vehicular
entrance onto public roadway, driveway, waste water treatment system, percolation area,
landscaping, boundaries and associated site works at Tullylougherny,, Carrickmacross, subject to the 8
condition(s) set out in the Schedule attached.
Signed on behalf of Monaghan County Council
________________________________________
ADMINISTRATIVE OFFICER
___________________________
DATE
Provided there is no appeal against this DECISION a grant of planning permission will issue at the
end of four weeks (see footnote).
NO WORKS CAN COMMENCE ON FOOT OF A ‘NOTIFICATION OF DECISION’ ON AN APPLICATION.
THE DEVELOPMENT IS ONLY AUTHORISED WHEN A ‘NOTIFICATION OF FINAL GRANT’ IS ISSUED.
pp
24 / 04 / 2026
Footnote:
An appeal against a decision of a Planning Authority under the Planning and Development Act 2000 (as
amended) may be made to An Coimisiún Pleanála, 64 Marlborough Street, Dublin 1, D01 V902. (Tel.
(01) 8588100) during office hours.
1. You have four weeks beginning on the date the planning authority makes its decision which
was (23/04/2026). This is a strict time limit.
2. You must put your appeal in writing (either typed or handwritten).
3. You must clearly state your own name and address. If someone is acting for you, like a planning
agent they must clearly state their own name and address as well as your name and address.
4. You must give enough details to allow An Coimisiún Pleanála to identify the application you
wish to appeal.
5. You must provide your planning grounds of appeal (reasons and arguments) for your appeal
and any items you wish to support your grounds of appeal.
6. If you are a third party, you must include the written acknowledgement given to you by the
planning authority to confirm it received your submission at planning application stage.
7. You must pay the correct fee.
For more information on how to make an appeal see www.pleanala.ie
26/60006 Padraig McMahon & Aiveen Murray, Tullylougherny,, Carrickmacross,, Co. Monaghan.
1.
a) Prior to the commencement of development, the applicants shall submit:
I. A legal agreement, plus accompanying Ordnance Survey map, with the adjoining landowner to
the east giving their consent to allow for the provision and maintenance of the required 70m
sight distances; and
II. Documentary evidence demonstrating a legal right‑of‑way over the full length of the private
lane serving the house hereby granted.
b) The required details shall be submitted to and approved in writing by the Planning Authority prior
to the commencement of any work on this development.
c) Development shall be carried out in accordance with these to-be-agreed details.
Reason: In the interests of road/traffic safety and orderly development.
2.
a) The proposed dwelling when completed shall be occupied as the place of residence of the
applicants, members of the applicants’ immediate family or their heirs and shall remain so
occupied for a minimum period of seven years thereafter, unless consent is granted by the
Planning Authority for its occupation by other persons who belong to the same category of
housing need as the applicants.
b) Before development commences, the applicants shall enter into an agreement with the Planning
Authority, pursuant to Section 47 of the Planning and Development Act 2000, providing for the
terms of the occupancy requirement.
c) Within two months of the occupation of the proposed dwelling, the applicants shall submit to the
Planning Authority, a written statement of confirmation of the first occupation of the dwelling in
accordance with paragraph (a) and the date of such occupation.
d) This condition shall not affect the sale of the dwelling by a mortgagee in possession or by any
person deriving title from a sale.
Reason: In the interest of sustainable development.
3.
a) The developer shall pay to Monaghan County Council a sum of €2647 in accordance with the
General Development Contribution Scheme 2021-2026 made by the Council under Section 48 of
the Planning and Development Act 2000 (as amended), towards expenditure incurred or proposed
to be incurred by the Council in the provision of community, recreation and amenity public
infrastructure and facilities in the area.
b) The sum attached to this condition shall be revised from the date of the grant of planning
permission to the value pertaining at the time of payment in accordance with the Wholesale Price
Index for Building and Construction (Materials and Wages).
c) No works shall commence until payment of the development contribution is made in full, or until
Monaghan County Council has agreed in writing to a schedule of phased payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the expenditure
incurred or proposed to be incurred by the Council in the provision of community, recreation and
amenity infrastructure and facilities in the area.
4.
a) Prior to any other works commencing, visibility splays of 70m, measured to the nearside road edge
in each direction, shall be provided from a point in the centre of the lane entrance 2.4m from the
road edge at a height of between 1.05m and 2m above ground level to an object height of
between 1.05m and 2m above ground level in both directions. The visibility splays shall be
retained and kept clear from obstructions thereafter.
b) Where it is necessary to remove hedges, fences, embankments or other obstructions in order to
achieve the required visibility splays, they shall be reinstated behind the visibility splays. Any new
trees or shrubs shall be planted back from the visibility splays to allow for future growth and some
species will require additional set back. All existing planting shall be kept trimmed behind visibility
splays.
c) Where the existing roadside hedge/embankment is to be removed, the roadside verge shall be
widened (by grading back or infilling where necessary using appropriate inert material) to include
the entire area within the visibility splays, top soiled, and grassed to the satisfaction of the
Planning Authority.
d) Measures shall be taken to prevent road surface water from flowing onto the lane entrance. The
discharge from the above drainage shall be piped to an appropriate drainage pipeline or
watercourse.
e) Provision shall be made for surface water drainage and no surface water shall be allowed flow
onto the lane or public roadway.
f) Surface water drain(s) shall suitably discharge to the nearest appropriate watercourse or drainage
pipeline. Separate application shall be made to Monaghan County Council if this requires a road
opening licence.
g) No development exempt or otherwise shall be erected over the public sewer, drain or water-main,
unless otherwise agreed in writing with the Planning Authority.
h) Before any work is commenced on this development a security, by way of a cash deposit, in the
sum of €2250, shall be paid to the Planning Authority by the developer to ensure the satisfactory
completion of all surface water drainage/boundary work within and abutting the site area, to
prevent runoff of surface water onto the public roadway and to ensure that no damage is caused
to public roadway and any such damage is repaired satisfactorily. Failure to carry out all entrance
works to a standard to the satisfaction of the Planning Authority will result in forfeiture of part or
all of the cash security.
Reason: In the interest of road/traffic safety.
5.
a) Mature trees and hedgerow within and along the site boundaries, and along the roadside, shall be
permanently retained in this development as per the submitted plans and documents. They shall
also be reinforced with additional planting as per the submitted landscaping details and protected
from damage at all times, particularly during building operations.
b) Notwithstanding the submitted landscaping details, any new site and roadside boundaries shall be
planted with native hedgerow species so as to ultimately form naturalised hedgerows similar to
existing hedgerows in the vicinity. Predominant species shall be whitethorn, with blackthorn, hazel
and holly also included. Planting shall be in a double staggered row with eight 2-3 year old plants
per metre; 250mm apart, with 300mm between rows.
c) Hedgerow planting, as required, shall be supplemented as per the submitted landscaping details
with native tree species at irregular intervals. Species shall include oak, sycamore and beech.
d) Planting as required shall be carried out in the first planting season following commencement of
building operations and shall be permanently retained thereafter.
Any plant which fails shall be replaced. Trees shall be allowed to mature and shall not be topped
when trimming hedgerows.
e) Any boundary fencing shall be of stained wood.
Reason: In the interest of visual amenity.
6.
a) The proposed effluent treatment and disposal system shall be located, constructed and
maintained in accordance with the details submitted and in accordance with the requirements of
the document entitled Environmental Protection Agency Code of Practice - Domestic Wastewater
Treatment Systems (population equivalent ≤ 10), 2021. No system other than the type proposed in
the application shall be installed without the prior written agreement of the Planning Authority.
b) A maintenance contract for the effluent treatment and disposal system shall be entered into from
the first date of occupancy of the dwelling and permanently maintained thereafter. Signed and
dated copies of the contract, which shall be for a minimum period of three years, shall be
submitted to, and agreed in writing with the Planning Authority within two months of the
installation.
c) Surface water soakaways shall be located such that the drainage from the dwelling and paved
areas of the site shall be diverted away from the location of the polishing filter.
d) Within two months of the first occupation of the dwelling, the developer shall submit a report
from a suitably qualified person with professional indemnity insurance certifying that the
proposed effluent treatment and disposal system has been installed and commissioned in
accordance with the approved details and is working in a satisfactory manner and that the
polishing filter is constructed in accordance with the standards set out in the EPA document.
e) Proposed well shall be located a minimum of 30m uphill of proposed on-site wastewater
treatment system.
Reason: In the interest of public health and environmental protection.
7.
Garage shall be used solely for purposes incidental to the enjoyment of the dwelling house and not for
any industrial, business or commercial purposes.
Reason: To protect the amenity of the area and to prevent unauthorised development.
8.
The development shall be carried out strictly in accordance with the plans and documents submitted
on the 15/01/2026 as amended on the 31/03/2026, except as may otherwise be required in order to
comply with the above conditions.
Reason: In the interest of proper planning and sustainable development.