HomeMy WebLinkAbout2560175 - Chief Executives OrderMONAGHAN COUNTY COUNCIL
PLANNING AND DEVELOPMENT ACT 2000 (as amended)
Chief Executive's Order No
Reference Number
Name of Applicant
P402-26
25/60175
Seanna and Gary Ogle
Address: Ronan Fitzpatrick
Old Train Station
North Road
Monaghan
H18 YK54
Nature of Application: Planning permission for a development which will consist of
demolition of an attached store and existing boundary wall and piers.
Also included is the construction of a single storey extension and
pergola, elevational amendments, infill boundary wall to block up one
of two site entrances, landscaping and all associated site works.
Significant Further Information received relates to submitted Water
protection checklist, Soil assessment report, and Revised site layout
plan
Location of Development: Annayalla
Castleblaney
Co. Monaghan
ORDER:
I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended)
and the Planning and Development Regulations 2001 (as amended) to grant permission for the above
development in accordance with documents submitted, subject to the 8 condition(s) set out in the
Schedule attached hereto.
I further decide that PERMISSION be granted subject to the same conditions on the expiration of the
period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no
appeal before An Coimisiun Pleanala.
Adrian Hughes
SENIOR PLANNER
Date
25/60175 Seanna and Gary Ogle, Annayalla, Castleblaney, Co. Monaghan
1.
All demolition and construction activity shall be restricted to the hours 08:00 to 18:00 Monday
to Friday, unless otherwise agreed in writing with the Planning Authority. No work shall take
place on Saturdays, Sundays, bank holidays or public holidays. During construction, the
developer shall ensure that no dirt or debris is deposited on the public road, and that
construction works are undertaken in a manner that minimises noise, vibration, and nuisance
to surrounding residents.
Reason: In the interest of residential amenity and to ensure that the development is carried
out in an orderly manner.
2.
All surface water shall be collected and disposed of within the site boundaries by means of
appropriately designed soakaways or existing surface water arrangements. No surface water
runoff shall discharge onto the public road or adjoining properties.
Reason: To ensure proper drainage and to protect adjoining lands.
O
Prior to the commencement of development, a revised and complete set of drawings shall be
submitted to, and agreed in writing with, the Planning Authority, clarifying the details of the
proposed pergola as indicated on the site layout plan. The development shall be carried out in
accordance with the agreed drawings.
Reason: In the interest of clarity.
4.
(a) The developer shall pay to Monaghan County Council a sum of €24 in accordance with
the General Development Contribution Scheme 2021-2026 made by the Council under
Section 48 of the Planning and Development Act 2000 (as amended), towards
expenditure incurred or proposed to be incurred by the Council in the provision of
community, recreation and amenity public infrastructure and facilities in the area.
(b) The sum attached to this condition shall be revised from the date of the grant of
planning permission to the value pertaining at the time of payment in accordance with
the Wholesale Price Index for Building and Construction (Materials and Wages).
(c) No works shall commence until payment of the development contribution is made in
full, or until Monaghan County Council has agreed in writing to a schedule of phased
payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the
expenditure incurred or proposed to be incurred by the Council in the provision of
community, recreation and amenity infrastructure and facilities in the area.
5.
Any development within the site in respect of potable water services shall be to standards as
required by Irish Water.
Reason: In the interests of orderly development, public health and securing a satisfactory
standard of development.
6.
(a) The proposed effluent treatment and disposal system shall be located, constructed
and maintained in accordance with the details submitted and in accordance with the
requirements of the document entitled Environmental Protection Agency Code of
Practice - Domestic Wastewater Treatment Systems (population equivalent ≤ 10),
2021. No system other than the type proposed in the application shall be installed
without the prior written agreement of the Planning Authority.
(b) A maintenance contract for the effluent treatment and disposal system shall be
entered into from the first date of occupancy of the dwelling and permanently
maintained thereafter. Signed and dated copies of the contract, which shall be for a
minimum period of three years, shall be submitted to, and agreed in writing with the
Planning Authority within two months of the installation.
(c) Surface water soakaways shall be located such that the drainage from the dwelling
and paved areas of the site shall be diverted away from the location of the polishing
filter.
(d) Within two months of the first occupation of the dwelling, the developer shall submit
a report from a suitably qualified person with professional indemnity insurance
certifying that the proposed effluent treatment and disposal system has been installed
and commissioned in accordance with the approved details and is working in a
satisfactory manner and that the polishing filter is constructed in accordance with the
standards set out in the EPA document.
Reason: In the interest of public health and environmental protection.
7.
(a) Developer shall ensure that adequate measures are in place for the construction
phase to ensure there is no discharge of polluting matter/sediment laden waters to
any watercourse or drains.
(b) Any construction and demolition waste shall be recovered/disposed of by a registered,
qualified waste contractor in accordance with the Waste Management Act 1996 (as
amended) and shall incorporate any hazardous waste, including asbestos.
Reason: In the interest of environmental protection.
8.
The development shall be carried out strictly in accordance with the plans and documents
submitted on the 30/04/2025 as amended on the 31/03/2026, except as may otherwise be
required in order to comply with the above conditions.
Reason: In the interest of proper planning and sustainable development.
Adrian Hughes
Senior Planner
Date