Loading...
HomeMy WebLinkAbout2660170 - Site layout planFH87.09187.87187.49187.27687.08186.97786.98087.77187.18987.07087.79888.06387.86587.75188.535 88.478 88.511 88.45288.511 88.497 88.509 88.471 88.55688.55788.60888.604 88.584 88.606 88.55088.66388.42688.54688.56388.54788.80388.52388.54288.51288.42888.54988.89187.75187.89388.14888.42288.519 88.57588.428POSTEPEPPOSTPOST113.401 EP90.92490.39089.81789.29488.21988.190EP 94.42194.49494.391 94.43494.29194.35394.015LP87.976 87.95687.92287.93287 .9 0 1 87.92487.96287.120LPLPLPLP86.811 87.17686.564 86.80986.860 86.91587.31888.35388.359 86.79186.70586.82786.75186.896EPLPLPLPLPLPEP86.42186.44986.46186.47886.47486.53486.534 86.52086.54286.54686.53786.548LPPOSTPOSTPOSTPOSTLPLPLP86.54486.53886.50086.49286.47486.463LPLPLP86.83486.78486.76986.70786.67586.64886.58886.58986.56886.57586.56486.57586.57786.55286.54586.55086.55686.56486.649POSTPOSTBDY 86.772 BDY86.751BDY86.513 BDY86.495 POSTPOSTPOSTSIGNSIGNPOST87.39087.45187.32186.94086.95686.88786.84286.78286.77286.72086.668 86.335 POST86.92386.97286.81686.77886.65986.56586.529BG1BG1BG1BG1RLG1 RLG 1 RLG1RLG1RLG1RLG1RLG1RLG187.52 1 87.45 3 87.398 87.396 87.378 87.376 87.33 4 87 . 3 4 4 87.31387.32587.30087.28287.26287.25187.23087.20387.065 87.168 87.203 87.32 4 87.49888.52888.66287.462 87.45787.45 0 86.77386.78987.17486.95286.81586.84988.117 88.06488.065 87.10487.08388.09288.132RLG RLG RLGRLGRLGRLG RLGEP87.403 87.57 0 86.79186.81890.482 89.683 88.780 87.476 87.11 8 87.096 87.08 3 87.42 3 87.528 87.48 6 87.471 87. 3 5 9 87.366 87.27489.78489.82589.778 89.783 90.79391.04491.11391.32291.47190.49589.65989.67189.20389.20189.22589.48989.48589.522BGBG BGBGLP89.501 89.24989.28789.24989.26894949494 949494949494949494949494116116116105105105105105105105105105105878787878787878787878787878787878787 8 8 888888 8888888888888888888888 8889898989 898989898989 8989898989898989899090909090 90909090909090909090909090909191919191 919191919191919191919191919191919292929292 92 929292929292929292929292929292929293939393 93939393939393939393939393939393939395959595 95959595959595959595959596969696 969696969696969696969696979797979797979797979797979797979898989898989898989898989898989999999999999999999999999999100100100100100100100100100100100100100106106106106106106106106106106117117101101101101101101101101101101101101101107107107107107107107107107107107102102102 1021021021021021021021021029494108108108108108108108108108108103103103103103103103103103103103103112112112112112112109109109109109109109109104104104104104104104104104104104104113113113113113110110110110110110110110114114114114114111111111111111111111115115115MHCL-89.22MHCL-86.89MHCL-87.51MHCL-87.52MHCL-89.19MHCL-89.22MHCL-87.09Existing Astro TurfPitchClub RoomsWalking Path878787 878787EP85.952WTL85.885WTL85.68485.534WTL85.50685.38685.66085.87387.07986.98386.94587.21587.07287.307CENTRELINE OF TREE STUMPSSTOP92.0091.0090.0088.57590.0094.7094.0094.4395.1389.1589.72590.30090.87591.4592.02592.60FFL 90.30090.87591.9590.6594.1594.0095.00132.0m72.0m 78.0m 140.0m95.00108104POST94.0094.792.02591.4590.3088.00313233101130292827262524231819202122060403020905070801151416121334100604030209050708011770.0M50.0MBpBpBpBpBp89.72589.72588.9288.8288.7288.6293.3290.87593.3088.0092.4992.4591.6690.8390.0090.0090.0090.0090.0090.0090.0090.0090.0090.0090.0095.00100.00100.0038.2m30.8m16.5m54.3mE.V.E.V.E.V.E.V.E.V.E.V.FLAT ROOFFLAT ROOFFLAT ROOFFLAT ROOFFLAT ROOFFLAT ROOF27.3mNO ENTRY 120.8m43.4m60.3mE.V.E.V.E.V.E.V.CEABTO CLONESTO NEWBLISSABDLANDSCAPING LEGENDDESCRIPTIONSYMBOLINFOFagus sylvatica(Beech)Height at planting - 1.5-1.8 mHeight at maturity - 6.5m /7mAge to maturity - 8 / 10 yearsAcer Campestre(Field Maple)Height at planting - 2.50mHeight at maturity - 9m / 12mAge to maturity -10/ 12 yearsAcer Platanoidies(Maple)Height at maturity - 6m / 8mAge to maturity -10/ 12 yearsExisting Trees /HedgesTo Be RemovedCrateagusMonogyan(Hawthorn Hedging)Height at planting -0.6m / 0.9mHeight at maturity - 3.0m / 3.5mAge to maturity - 6 / 7 yearsExisting NativeTrees and HedgingProposed NativeHedgerowGrassed AreaTarmac RoadwayIMPLEMENTATION AND REALISATION·Hedges & shrubs to be planted & grass free soil and maintained in weed & grass free soil for min. 3 years after planting.·Hedging & trees to be planted in dormant season (October - March).·All plants to be fertilised with suitable fertilizer each spring according to manufacturers instructions.·Side prune shrubs as applicable in August to introduce new top growth for first 5 years.·Roadside hedge to be faced at least once every summer.·Any plants which die or fail to grow satisfactorily during first growing season must be replaced the following dormant season.·All existing mature trees and hedgerow to the rear and side of this site to be protected.© COPYRIGHT: These drawings are the copyright of CS Pringle Ltd. and they must not be reproduced without consent from this company.Main St, Castleblayney, Co. Monaghan, A75 YR99P|+353 42 9746492 E|info@cspringle.comFILE LOCATION:DATE:SCALES:REVISION:DRAWN BY:CHECKED BY:DRAWING NUMBER:www.cspringle.com ARCHITECTS | ENGINEERS | BUILDING SURVEYORSLOCATIONSTAGECLIENTDRAWING TITLECSPringle â– PlanningKilleevan Sarsfields GFCGuardhill & Lisalea, Newbliss, Co. MonaghanSite Layout Plan Sheet 01 of 02D.R. / E.MM.K.O'R. 6480-CSP-PL-26-00130/04/20261:500 @A1+Proposed 2/3cut to formembankmentVehicularaccessonlyExisitng access to bewidened to 6.0mGoal postsProposed ballstopping netExisting pedestrianaccess routeProposedcarparkingProposedlandscaped moundto screendevelopment fromClones roadExisting coveredstandAccesspathway toplayingfield formaintenanceonlySite notice 1Site notice 3Proposedfloodlights asper lightingdesignExisitnggateSite notice 2Proposed playingfield with 4m run offSite outlined in redProposed turning circleExisting playing fieldExisting hedgerow tobe removedProposedclubhouse& indoorarenaProposed3No. disabledcar parkingProposed10No. E.V.chargingspacesAccess to existingclubhouseSITE LAYOUT PLAN:Scale: 1:500Site Area: 17.39 Acres 7.04 HectaresProposed entranceplease refer to siteentrance drawing6480-CSP-PL-26-00318 spaces17 spaces45 spacesPercolationAreaProposed culvert toaccess routeProposedfloodlights asper lightingdesignRECEIVED: 30/04/2026 FH87.09187.87187.49187.27687.08186.97786.98087.77187.47687.18987.07087.79888.06387.86587.75188.535 88.478 88.511 88.45287.48088.511 88.497 88.509 88.471 88.55688.55788.60888.604 88.584 88.606 88.55088.66388.42688.54688.56388.54788.80388.52388.54288.51288.42888.54988.89187.75187.89388.14888.42288.519 88.57588.428POSTEPEPPOSTPOST113.401 EP90.92490.39089.81789.29488.21988.190EP 94.42194.49494.391 94.43494.29194.35394.015LP87.976 87.95687.92287.93287 .9 0 1 87.92487.96287.120LPLPLPLP86.811 87.17686.564 86.80986.860 86.91587.31888.35388.359 86.79186.70586.82786.75186.896EPLPLPLPLPLPEP86.42186.44986.46186.47886.47486.53486.534 86.52086.54286.54686.53786.548LPPOSTPOSTPOSTPOSTLPLPLP86.54486.53886.50086.49286.47486.463LPLPLP86.83486.78486.76986.70786.67586.64886.58886.58986.56886.57586.56486.57586.57786.55286.54586.55086.55686.56486.649POSTPOSTBDY 86.772 BDY86.751BDY86.513 BDY86.495 POSTPOSTPOSTSIGNSIGNPOST87.39087.45187.32186.94086.95686.88786.84286.78286.77286.72086.668 86.335 POST86.92386.97286.81686.77886.65986.56586.529BG1BG1BG1BG1RLG1 RLG 1 RLG1RLG1RLG1RLG1RLG1RLG187.52 1 87.45 3 87.398 87.396 87.378 87.376 87.33 4 87 . 3 4 4 87.31387.32587.30087.28287.26287.25187.23087.20387.065 87.168 87.203 87.32 4 87.49888.52888.66287.462 87.45787.45 0 86.77386.78987.17486.95286.81586.84988.117 88.06488.065 87.10487.08388.09288.132RLG RLG RLGRLGRLGRLG RLGEP87.403 87.57 0 86.79186.81890.482 89.683 88.780 87.476 87.11 8 87.096 87.08 3 87.42 3 87.528 87.48 6 87.471 87. 3 5 9 87.366 87.27489.78489.82589.778 89.783 90.79391.04491.11391.32291.47190.49589.65989.67189.20389.20189.22589.48989.48589.522BGBG BGBGLP89.501 89.24989.28789.24989.26894949494 949494949494949494949494116116116105105105105105105105105105105878787878787878787878787878787878787 8 8 888888 8888888888888888888888 8889898989 898989898989 8989898989898989899090909090 90909090909090909090909090909191919191 919191919191919191919191919191919292929292 92 929292929292929292929292929292929293939393 93939393939393939393939393939393939395959595 95959595959595959595959596969696 969696969696969696969696979797979797979797979797979797979898989898989898989898989898989999999999999999999999999999100100100100100100100100100100100100100106106106106106106106106106106117117101101101101101101101101101101101101101107107107107107107107107107107107102102102 1021021021021021021021021029494108108108108108108108108108108103103103103103103103103103103103103112112112112112112109109109109109109109109104104104104104104104104104104104104113113113113113110110110110110110110110114114114114114111111111111111111111115115115MHCL-89.22MHCL-86.89MHCL-87.51MHCL-87.52MHCL-89.19MHCL-89.22MHCL-87.09Existing Astro TurfPitchClub RoomsWalking Path878787 878787EP85.952WTL85.885WTL85.68485.534WTL85.50685.38685.66085.87387.07986.98386.94587.21587.07287.307CENTRELINE OF TREE STUMPSSTOP92.0091.0090.0088.57590.0094.7094.0094.4395.1389.1589.72590.30090.87591.4592.02592.60FFL 90.30090.87591.9590.6594.1594.0095.00132.0m72.0m 78.0m 140.0m95.00108104POST94.0094.792.02591.4590.3088.00313233101130292827262524231819202122060403020905070801151416121334100604030209050708011770.0M 50.0M BpBpBpBpBp89.72589.72588.9288.8288.7288.6293.3290.87593.3088.0092.4992.4591.6690.8390.0090.0090.0090.0090.0090.0090.0090.0090.0090.0090.0095.00100.00100.0038.2m30.8m16.5m54.3mE.V.E.V.E.V.E.V.E.V.E.V.FLAT ROOFFLAT ROOFFLAT ROOFFLAT ROOFFLAT ROOFFLAT ROOF27.3mNO ENTRY 120.8m43.4m60.3mE.V.E.V.E.V.E.V.CEABTO CLONESTO NEWBLISSABDLANDSCAPING LEGENDDESCRIPTIONSYMBOLINFOFagus sylvatica(Beech)Height at planting - 1.5-1.8 mHeight at maturity - 6.5m /7mAge to maturity - 8 / 10 yearsAcer Campestre(Field Maple)Height at planting - 2.50mHeight at maturity - 9m / 12mAge to maturity -10/ 12 yearsAcer Platanoidies(Maple)Height at maturity - 6m / 8mAge to maturity -10/ 12 yearsExisting Trees /HedgesTo Be RemovedCrateagusMonogyan(Hawthorn Hedging)Height at planting -0.6m / 0.9mHeight at maturity - 3.0m / 3.5mAge to maturity - 6 / 7 yearsExisting NativeTrees and HedgingProposed NativeHedgerowGrassed AreaTarmac RoadwayIMPLEMENTATION AND REALISATION·Hedges & shrubs to be planted & grass free soil and maintained in weed & grass free soil for min. 3 years after planting.·Hedging & trees to be planted in dormant season (October - March).·All plants to be fertilised with suitable fertilizer each spring according to manufacturers instructions.·Side prune shrubs as applicable in August to introduce new top growth for first 5 years.·Roadside hedge to be faced at least once every summer.·Any plants which die or fail to grow satisfactorily during first growing season must be replaced the following dormant season.·All existing mature trees and hedgerow to the rear and side of this site to be protected.© COPYRIGHT: These drawings are the copyright of CS Pringle Ltd. and they must not be reproduced without consent from this company.Main St, Castleblayney, Co. Monaghan, A75 YR99P|+353 42 9746492 E|info@cspringle.comFILE LOCATION:DATE:SCALES:REVISION:DRAWN BY:CHECKED BY:DRAWING NUMBER:www.cspringle.com ARCHITECTS | ENGINEERS | BUILDING SURVEYORSLOCATIONSTAGECLIENTDRAWING TITLECSPringle â– PlanningKilleevan Sarsfields GFCGuardhill & Lisalea, Newbliss, Co. MonaghanSite Layout Plan Sheet 01 of 02D.R. / E.MM.K.O'R. 6480-CSP-PL-26-00130/04/20261:500 @A1+Proposed 2/3cut to formembankmentVehicularaccessonlyExisitng access to bewidened to 6.0mGoal postsProposed ballstopping netExisting pedestrianaccess routeProposedcarparkingProposedlandscaped moundto screendevelopment fromClones roadExisting coveredstandAccesspathway toplayingfield formaintenanceonlySite notice 1Site notice 3Proposedfloodlights asper lightingdesignExisitnggateSite notice 2Proposed playingfield with 4m run offSite outlined in redProposed turning circleExisting playing fieldExisting hedgerow tobe removedProposedclubhouse& indoorarenaProposed3No. disabledcar parkingProposed10No. E.V.chargingspacesAccess to existingclubhouseSITE LAYOUT PLAN:Scale: 1:500Site Area: 17.39 Acres 7.04 HectaresProposed entranceplease refer to siteentrance drawing6480-CSP-PL-26-00318 spaces17 spaces45 spacesPercolationAreaProposed culvert toaccess routeProposedfloodlights asper lightingdesignRECEIVED: 30/04/2026