Loading...
HomeMy WebLinkAbout2660083 - Chief Executives OrderMONAGHAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (as amended) Chief Executive's Order No: P417-26 Reference Number: 26/60083 Name of Applicant: Cormac Callan Address: Micheal Murtagh Annavackey Hackballscross Dundalk A91NA06 Nature of Application: Permission to install a domestic wastewater treatment system, and all associated site development works Location of Development: Aughrim More, Culloville PO Co. Monaghan ORDER: I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended) and the Planning and Development Regulations 2001 (as amended) to grant permission for the above development in accordance with documents submitted, subject to the 2 condition(s) set out in the Schedule attached hereto. I further decide that PERMISSION be granted subject to the same conditions on the expiration of the period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no appeal before An Coimisiun Pleanala. Adrian Hughes SENIOR PLANNER O 1. O2� Date 26/60083 Cormac Callan, Aughrim More,, Culloville PO, Co. Monaghan 1. a) The proposed effluent treatment and disposal system shall be located, constructed and maintained in accordance with the details submitted to the planning authority on the 11/03/2026 and in accordance with the requirements of the document entitled The Environmental Protection Agency Wastewater Treatment Manuals - Treatment systems for small communities, Business, leisure Centres and Hotels. No system other than the type proposed in the application shall be installed without the prior written agreement of the Planning Authority. b) A maintenance contract for the effluent treatment and disposal system shall be entered into from the first date of occupancy of the dwelling and permanently maintained thereafter. Signed and dated copies of the contract, which shall be for a minimum period of 3 years, shall be submitted to, and agreed in writing with the planning authority within 2 months of the installation. c) Surface water soakaways shall be located such that the drainage from the dwelling and paved areas of the site shall be diverted away from the location of the polishing filter. d) Within two months of the first occupation of the dwelling, the developer shall submit a report from a suitably qualified person with professional indemnity insurance certifying that the proposed effluent treatment and disposal system has been installed and commissioned in accordance with the approved details and is working in a satisfactory manner and that the polishing filter is constructed in accordance with the standards set out in the EPA document. Reason: In the interest of public health and environmental protection. 2. The development shall be carried out in accordance with plans and documentation submitted to the Planning Authority on the 11/03/2026, except as otherwise required in order to comply with the above conditions. Reason: To ensure a satisfactory standard of development. cc Adrian Hughes Senior Planner Date