Loading...
HomeMy WebLinkAbout2560463 - Report Received from Internal Staff - MDMONAGHAN COUNTY COUNCIL THE MUNICIPAL DISTRICT OF BALLYBAY - CLONES PLANNING PERMISSION-ROAD CONDITION REPORT Planning Application No. 25-60463 Previous Ref.No’s. Applicant: Ronan Boyd Proposed Development: Planning permission for a development which will consist of the re-contouring of existing undulating agricultural farmland to include the importation of green field soil and stone in order to raise the levels of the land together with all ancillary site development works under an Article 27 declaration. The lands will be covered with topsoil and reseeded with grass when completed Location: Binmore, Castleblaney, Co. Monaghan Adjoining Road: LP-4122 Notice on site: Yes Engineer’s Report No Objection, subject to the following: 1. Site sight distance of 90 metres in both directions to be provided from a point in the entrance 2.4 metres from the road edge and 1.05 metre to 2.0 metres above ground level in both directions were the entrances meet the LP-4122. Sight distances to be measured to the nearside road edge in both directions. Where necessary remove hedges/crash barrier in order to achieve this sight distance. 2. Where the visibility splays cross over third-party lands, and there is an obstruction within the visibility splay, applicant is to submit a legal agreement between adjacent landowner/s allowing for the grading, removal, setting back, and or, maintenance of obstructions to provide the required sight distance as per Chapter 15.23.4 of the Draft Monaghan County Development Plan 2025-2031. 3. Programming is required during the proposed works. To reduce impacts on residents adjacent to the proposed site the applicant and all sub- contractors must ensure they adhere to the following: - • Shall be required to schedule deliveries/construction traffic in such a way as to reduce the possibility of a build of construction vehicles arriving at site simultaneously, resulting in build-up of traffic on road network. • Construction activities shall be undertaken during daylight hours for all construction stages. • Road Cleaning: - the applicant/contractor will be required to carry out road sweeping operations to remove any project related dirt and material deposited on any length of the road network by construction / delivery vehicles. Road Sweepers will be required to dispose of material following sweeping of road network, to a licensed waste facility. • Vehicle Cleaning: - The contractor will be required to provide wheel washing facilities, and any other necessary measures to remove mud and organic material from vehicles exiting site. In addition, the cleaning of delivery trucks/tractors shall be carried out within the site development and not at the entrance or roadway. MONAGHAN COUNTY COUNCIL THE MUNICIPAL DISTRICT OF BALLYBAY - CLONES 4. The applicant must consider the existing road condition. The extent of the heavy vehicle traffic movements and the nature of the works may create problems such as fugitive losses from wheels, trailers or tailgates and localised areas of subgrade and wearing surface failure. The applicant must ensure that: - • Loads of materials traveling to site will be evaluated and covered if considered necessary to minimise potential dust impacts during transportation and the transportation contractor shall take all reasonable measures while transporting waste or any other materials likely to cause fugitive losses from a vehicle during transportation to and from the site, including but not limited to: Covering of all waste or material with suitably secured tarpaulin/ covers to prevent loss and utilisation of enclosed units to prevent loss. • The roads forming part of the access route and the haul route shall be monitored visually throughout the construction period and a truck mounted vacuum mechanical sweeper to be assigned to roads along the access route and haul route as required. In addition, the contractor shall, in conjunction with the local authority undertake additional inspections and reviews of the road forming the access route and haul route one month prior to the construction phase to record the condition of the road at that time. Such surveys shall comprise, as a minimum, a review of video footage taken at that time, which shall confirm the condition of the road corridor immediately prior to commencement of construction. Upon completion of the construction of the proposed land/development, the surveys carried out at pre-construction phase shall be repeated and a comparison of the pre and post construction surveys carried out. Where such comparative assessments identify a section of road as having been damaged or as having deteriorated because of construction traffic, the road will be repaired to the pre- construction standard or better. Signed: ___________ DATE: 05/05/2025 Kevin Connolly Assistant Engineer