Loading...
HomeMy WebLinkAbout2660135 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT To: Martina Smith (Environment Section – A/Executive Scientist). From: Peter Deery (Environment Section – Water Team). Re: 26/60135 The Board of Management St Louis Secondary School. Permission: Permission for a development which will consist of the installation of a new predominantly two-storey school building, with a third-storey circulation core at 2nd floor level, and a new pedestrian access bridge from the existing carpark level to the 2nd floor level of the proposed new school building. The proposed development (1010m2) includes 2 no. Mainstream Classrooms, 1 no. Science Lab & Prep Area, 2 no. Art Rooms; and all associated site and ancillary works The above proposed development consists of works within the curtilage of protected structures including: Convent of Saint Louis School Building (Reg No: 41310083); Convent of Saint Louis School Building (Reg No: 41310084); Convent of Saint Louis Church/Chapel (Reg No: 41310085); Saint Louis Convent National School (Reg No: 41310064); Convent of Saint Louis Stables (Reg No: 41310065); Saint Louis Convent/Nunnery (Reg No. 41310066); Convent of Saint Louis Gates/Railings/Boundary Walls (Reg No: 41310067); School House (Reg No: 41310072). There are also two recorded monuments within the curtilage of the proposed site: Fortified House and Bawn: Drummond Otra (Reg No. MO031-034). Location St Louis Secondary School, Carrickmacross, Co Monaghan. Date: 29/04/2026 Background The proposed development is located on a regionally important karstified aquifer in an area of high/extreme groundwater vulnerability. The proposed development site is located within the Glyde_SC_020 subcatchment, and within the Proules_020 sub-basin, which has been assigned Poor status under the Water Framework Directive (2019 - 2024) with an objective of Restore. The proposed development is located adjacent to the Proules_020, which is has been assigned Poor status under the Water Framework Directive (2019 - 2024) with an objective of Restore, and is located within the Spring Lough and Monalty Lough source outer catchment. A Water Protection Plan checklist has not been submitted with the application. The application states that foul water will discharge to the public sewer via an existing connection. The Infrastructure Report states that a Pre-Connection Enquiry has been submitted to Uisce Éireann, however, a Confirmation of Feasibility has not yet been received by the applicant. The application states that surface water will discharge to a new filter drain to provide approximately 22m3 attenuation storage, followed by a hydrobrake to limit flow to 2m/s, before discharging to the existing storm water drainage system. Recommendation I recommend the following additional information: a) Submit a fully completed Water Protection Plan checklist. b) Submit a Confirmation of Feasibility from Uisce Éireann confirming that Carrickmacross Wastewater Treatment Plant has capacity to accept the hydraulic and organic loading arising from the proposed development. c) Submit a Construction and Environmental Management Plan (CEMP) for agreement. This plan shall be sufficient to demonstrate that adequate measures will be in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any waters. The Construction and Environmental Management Plan shall take account of best practice and the guidance produced by Inland Fisheries Ireland titled “Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters 2016” and shall include the identification of potential pathways to the groundwater aquifer and the River Proules. The CEMP shall be prepared by a suitably qualified person and shall include the location details of the monitoring points where daily visual checks and weekly surface water monitoring (physical& chemical parameters) shall be carried out. Signed: Date: 29/04/2026 Peter Deery A/Senior Executive Technician Approved By: Date: 05/05/2026