Loading...
HomeMy WebLinkAbout2635 - Site Assessment ReportAPPENDIX A: SITE CHARACTERISATION FORM File Reference: Prefix: First Name: Edel Surname: I1inn Address: Site Location and Townland: [mcarrowMa9heracfoonecoMonahafl Number of Bedrooms: L3 Comments on population equivalent Maximum Number of Residents: Proposed Water Supply: Mains 17 Private Well/Borehole Soil Type, (Specify Type): I Surface water Gleys, Ground water Gleys Subsoil, (Specify Type): I Sandstone and shale till (Lower Paleozoic) Group Well/Borehole Bedrock Type: Permo-Triassic Sandstones Aquifer Category: Regionally Important I Locally Important Lm Poor Vulnerability: Extreme J High J Moderate j✓ Low LII Groundwater Body: I Status Name of Public/Group Scheme Water Supply within 1 km: Source Protection Area: ZOC Si SO ❑ Groundwater Protection Response: R1 Presence of Significant Sites (Archaeological, Natural & Historical): Past experience in the area: Comments: (Integrate the information above in order to comment on: the potential suitability of the site, None CO. MON. CO. CO. None 19.. 1F 05 MAY 2026 targets at risk, and/or any potential site restrictions). Following the desk study the site appears suitable for the safe disposal of efflu:nt subject to GPR of R1 which states Acceptable subject to normal good practice. Where domestic water supplies are-h�eate given to the depth of subsoil over bedrock such that the minimum depths required in Chapter 6 are met and the likelihood of microbial pollution is minimised Note: Only information available at the desk study stage should be used in this section. P LA bbl N 9 ail ;a ' ('. 6 a i'sV \j,j REF. ICY O. MON9Ac_={HAN CO. COUNCIL 3.1 Visual Assessment Landscape Position: Jndulating hills Slope: Steep (>1:5) �✓ Shallow (1:5-1:20) ❑✓ Relatively Flat (<1:20) U Slope Comment Sloping West to East Sloping West to East Sloping West to East Surface Features within a minimum of 250m (Distance To Features Should Be Noted In Metres) Houses: Houses to north and south of site >300m from site. Cottage to be renovated on site. Existing Land Use: agriculture Vegetation Indicators: grass Groundwater Flow Direction: West to East Ground Condition: =irm Underfoot Site Boundaries: frees & Hedgerows 3.1 Visual Assessment (contd.) Roads: Minor road to east of site Outcrops (Bedrock And/Or Subsoil): None Visible Surface Water Pondina: None visible Lakes: None Visible Beaches/Shellfish Areas: None Visible Wetlands: None Visible Karst Features: None Visible Watercourses/Streams:* 3.1 Visual Assessment (contd.) Drainage Ditches:` None Visible Springs:* None Visible Wells:* No wells within 30m of proposed percolation area. Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, the suitability of the site to treat the wastewater and the location of the proposed system within the site). Following the visual assessment the site appears suitable for the safe disposal of effluent. 'Note and record water level 3.2 Trial Hole (should be a minimum of 2.1m deep (3m for regionally important aquifers)) To avoid any accidental damage, a trial hole assessment or percolation tests should not be undertaken in areas which are at or adjacent to significant sites, (e.g. NHAs, SACs, SPAs, and/or Archaeological etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. Depth of trial hole (m): 2.2 Depth from ground surface Depth from ground surface to bedrock (m) (if present): to water table (m) (if present): Depth of water ingress: Rock type (if present): Date and time of excavation: 04 -Apr -2026 12:35 Date and time of examination: 08 -Apr -2026 10:45 Depth of Surface and Subsurface Soil/Subsoil Percolation Texture & Plasticity and Soil Density/ Colour**** Preferential Tests Classification** dilatancy*** Structure Compactness flowpaths 0.1m I 0.2m1____ 0.3 m 0.4 m - es 0.5m 0.6m 0.7 m I I 0.8 m es 0.9m lI 1.0m I I 1.1m I I 1.2m I 1.3m1 1.4 m l� 1.5 m 1.6m II 1.7 m l� 1.8m lI 1.9m I 2.0m II 2.1m I 2.2 m 1I 2.3m lI 2.4m (1 2.5m 2.6m1 2.7m fl I 2.8m l_I 2.9m I I 3.oml____ 3.1m I 3.2 m 1_I 3.3m 11 3.4m riiiii 3.5mrii TOPSOIL GARVELLY CLAY GRAVEL BOULDERS BASE OF TRIAL HOLE 2.2M 2-3 THREADS CRUMB FIRM <100mm RIBBONS DILATANT 3 THREADS STRUCTURE- STIFF Likely Subsurface Percolation Value: 20 Likely Surface Percolation Value: L 10 BROWN NONE ROOT ZONE LIGHT NONE BROWN Note: Depth of percolation test holes should be indicated on log above. ('Enter Surface or Subsurface at depths as appropriate). See Appendix E for BS 5930 classification. 3 samples to be tested for each horizon and results should be entered above for each horizon. '"' All signs of mottling should be recorded. 3.2 Trial Hole (contd.) Evaluation: Following the trail hole inspection the site appears suitable for the safe disposal of effluent. 3.3(a) Subsurface Percolation Test for Subsoil Step 1: Test Hole Preparation Percolation Test Hole I 2 3 Depth from ground surface 450 450 450 to top of hole (mm) (A) Depth from ground surface j 850 850 850 to base of hole (mm) (B) Depth of hole (mm) [B - A] 400 40 4400 Dimensions of hole [length x breadth (mm)] 310 x 320 310 x 300 300 x 320 Step 2: Pre -Soaking Test Holes Pre-soak start Date 07 -Apr -2026 j 07 -Apr -2026 07 -Apr -2026 Time 09:15 09:15!09:15 2nd pre-soak Date 07 -Apr -2026 07 -Apr -2026107 -Apr -2026 start Time 17:22 17:22 17:22 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 Percolation Test Hole No. 1 2 3 Date of test 08-04-2026 08-04-2026 08-04-2026 Time filled to 400 mm 10:5011_10:50!!_10:52! Time water level at 300 mm 11:56 11:59 11:58 Time (min.) to drop 100 mm (T) 66.00 69.00 66.00 Average T,� 67.00 If T,00 > 480 minutes then Subsurface Percolation value >120 — site unsuitable for discharge to ground If T,00 5 210 minutes then go to Step 4; If T100 > 210 minutes then go to Step 5; Step 4: Standard Method (where T100 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish At (min) Start Finish At (min) Start Finish At (min) Time Time Time Time Time Time (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) 1 11:56 13:1011 74.001 11:59 13:20l 81.00 11:58 13:1111 73.00 2 13:10 14:4011 90.00 13:20 14:5811 98.00 13:11 14:4411 93.00 3 Average At 14:40 16:2711 107.00 14:58 16:5211 114.001 I 141 16:2411 100.00 90.33 97.67 88.67 Value Average At/4 = [Hole No.1] I 22.581(t1) Average At/4 = [Hole No.2] 24.421(t2) Average At/4 = [Hole No.3] I 22.17 (t3) Result of Test: Subsurface Percolation Value = 23.06 (min/25 mm) Comments: 1 -VALUE WITHIN THE ALLOWABLE RANGE SET OUT IN THE EPA GUIDELINES Step 5: Modified Method (where T100 > 210 minutes) Percolation Test Hole No. 1 Fall of water Time Start Finish Time K,, T — in hole (mm) Factor Time Time of fall = T, Value =T, hh:mm hh:mm (mins) IT, =4.45 = Tm /K 300 -250 8.1 =0 200 - 150 11.9 ==0== 0.00 150- 100 14.1 =0I 0.0011 Average T- Value T- Value Hole 1 = (T1) I 0.00 Percolation Test Hole No. 3 Percolation Test Hole No. 2 Fall of water in hole (mm) Time Factor =T, Start Time hh:mm Finish Time hh:mm Time of fall (mins) =T K,, = T, /T T— Value =4.45 /K„ 300-250 I_8.1111 0.00 =� 250-200 I_9.71 L__ 0.00 =_ 200- 150 I 11.9 0L_ 0.00 0_____ 150-100 14.1 �0 0.00 =� Average T- Value T- Value Hole 2 = (T2) I 0.00 Result of Test: Subsurface Percolation Value = 0.001 (min/25 mm) Fall of water Time Start Finish Time K, T- Comments: in hole (mm) Factor Time Tim§e of fall = T, Value = T, hh:mm hh:mm (mins) / Tm = 4.45 =Tm /K,, 300-250 8.1 I0I 0.00 == 250 -200 [j&=L---1 0.0011 � 200- 150 DO �� 0.00 150- 100 14.1 =0 0.0011 I Average T- Value T- Value Hole 3 = (T2) I 0.00 3.3(b) Surface Percolation Test for Soil Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface 0 0 to top of hole (mm) Depth from ground surface 400 410L 410 to base of hole (mm) Depth of hole (mm) 400 410 410 Dimensions of hole [length x breadth (mm)] 1 310 x 300 1 300 x 310!! 300 x 3001 Step 2: Pre -Soaking Test Holes Pre-soak start Date 07 -Apr -2026 07 -Apr -2026 07 -Apr -2026 Time 09:151 I 09:15 09:15 2nd pre-soak Date 07 -Apr -2026 07 -Apr -2026 07 -Apr -2026 start Time 17:22 17:22 1722 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 1 2 3 Percolation Test Hole No. I II II I Date of test 08 -Apr -26 08 -Apr -26 08 -Apr -2026 Time filled to 400 mm 10:54 II 10:55 10:55 Time water level at 300 mm 11:24 II 11:2711 11:26 31.00 Time to drop 100 mm (T 30.00 32.001� Average T100 31.00 If T100 > 480 minutes then Surface Percolation value >90 — site unsuitable for discharge to ground If T100 < 210 minutes then go to Step 4; If T100 > 210 minutes then go to Step 5; Step 4: Standard Method (where T100 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish AT (min) Start Finish AT (min) Start Finish AT (min) Time Time Time Time Time Time (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) 1 11:24 12:00 36.00I 11:27 12:0711 40.00 11:26 12:0311 37.00 2 12:00 12:4211 42.00 12:07 12:56 49.00 12:03 12:5011 47.001 3 Average AT 12:42 13:3311 51.00 12:56 13:5811 62.00 50.33 12:50 13:45jj 55.00 L43-00 46.33 Value Average AT/4 = [Hole No.1] I 10.75 (T,) Average AT/4 = [Hole No.2] 12.581(T2) Average AT/4 = [Hole No.3] 11.58 (T3 Result of Test: Surface Percolation Value = 11.64 (min/25 mm) Comments: 3 -VALUE WITHIN THE ALLOWABLE RANGE SET OUT IN THE EPA GUIDELINES Step 5: Modified Method (where T100 > 210 minutes) Percolation Test Hole No. 1 Percolation Test Hole No. 2 Fall of water in hole (mm) Time Factor =T Start Time hh:mm Finish Time hh:mm Time of fall (mins) = m K5 = T, / T T- Value = 4.45 /K,. Fall of water In hole (mm) Time Factor =T1 Start Time hh:mm Finish Time hh:mm Time of fall (mins) =Tm K, = T, IT, T— Value =4.45 300-250 8.1 00 0.00 l � 300-250 I 8.1 00 0 0.00 0 250 9.7 � 0= 0.00 0 250 - 200 0 I 9.7 �0 0.0r -200 200-150 11.9 1 =0 0.00 II 200-150 11.9 00I 0.00 II 100 14.1 =� 0.0011 j 150 - 100 14.1 ��0 0.00 = 150- _____ Average T- Value T- Value Hole 1 = (T1) I 0.00 Average T- Value T- Value Hole 2 = (T2) I 0.00 Result of Test: Surface Percolation Value = Percolation 0.00 (min/25 mm) Test Hole No. 3 Fall of water Time Start Finish Time K,, T — in hole (mm) Factor Time Time of fall =T, Value =T hh:mm hh:mm (mins) IT,,, = 4.45 Tm 1K5 300-250 i i 0.00 lIu 250 -200 9.7 i0I I I= 200 - 150 Lm9 .00 I I_ 150- 100 14.1 0.00 �� Comments: Average I T- Value T- Value Hole 3 = (2)T 0.00 I I Integrate the information from the desk study and on -site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Slope of proposed infiltration / treatment area: 01 Are all minimum separation distances met? Depth of unsaturated soil and/or subsoil beneath invert of gravel (or drip tubing in the case of drip dispersal system) 0.90 Percolation test result: Surface: 11.64 Sub -surface: 23.06 Not Suitable for Development I Identify all suitable options 1. Septic tank system (septic tank and percolation area) (Chapter 7) Yes 2. Secondary Treatment System (Chapters 8 and 9) and soil polishing filter Yes (Section 10.1) 3. Tertiary Treatment System and Infiltration / treatment area (Section 10.2) Yes Suitable for Development Q Discharge Route' GROUNDWATER Propose to install: Septic tank system (septic tank and percolation area) and discharge to: Ground Water Invert level of the trench/bed gravel or drip tubing (m) I 0.85 Site Specific Conditions (e.g. special works, site improvement works testing etc. The site is suitable for the installation of septic tank and trenched percolation area. Due to the height differences on the site it is proposed to install an effluent treatment system and pump to a trenched percolation area. See documents attached for sizing and construction details. All works to be carried out as per the Manufacturers instructions, EPA COP 2021, Building Regulations and drawings attached with this report. All separating distances to be achieved and all works to be carried out in accordance with EPA COP 2021 ' A discharge of sewage effluent to "waters" (definition includes any or any part of any river, stream, lake, canal, reservoir, aquifer, pond, watercourse or other inland waters, whether natural or artificial) will require a licence under the Water Pollution Acts 1977-90. Refer to Section 2.4. SYSTEM TYPE: Septic Tank Systems (Chapter 7) Tank Capacity (m3) 0 Percolation Area No. of Trenches Length of Trenches (m) Invert Level (m) 0 Mounded Percolation Area No. of Trenches Length of Trenches (m) Invert Level (m) 0 SYSTEM TYPE: Secondary Treatment System (Chapters 8 and 9) and polishing filter (Section 10.1) Secondary Treatment Systems receiving septic tank effluent (Chapter 8) Media Type Area (m2){ Sand/Soil Soil Constructed Wetland Other Polishing Filter*: (Section 10.1) Surface Area (rn2)* Option 1 - Direct Discharge Surface area (m2) Option 2 - Pumped Discharge Surface area (m2) Depth of Filter Invert Level Packaged Secondary Treatment Systems receiving raw wastewater (Chapter 9) Type SEE MANUFACTURERS REPOR] Capacity PE Sizing of Primary Compartment m3 Option 3 - Gravity Discharge Trench length (m) Option 4 - Low Pressure Pipe Distribution 0 Trench length (m) Option 5 - Drip Dispersal Surface area (m2) 60.00 SYSTEM TYPE: Tertiary Treatment System and infiltration / treatment area (Section 10.2) Identify purpose of tertiary Provide performance information Provide design information treatment demonstrating system will provide required treatment levels SLOPED SITE DISCHARGE ROUTE: SEE MANUFACTURERS REPORT SEE MANUFACTURERS REPORT Groundwater ✓� Hydraulic Loading Rate * (I/m2.d) ___________J Surface area (m2) Surface Water ** Discharge Rate (m3/hr) * Hydraulic loading rate is determined by the percolation rate of subsoil ** Water Pollution Act discharge licence required QUALITY ASSURANCE: Installation & Commissioning SEE MANUFACTURERS REPORT On -going Maintenance SEE MANUFACTURERS REPORT Company: ARC Design Services Prefix: Mr First Name: Oliver Surname: Farrelly Address: Mountain Pole, Kells, Co. Meath. Qualifications/Experience: FETAC Cert Attached Date of Report: 21 -Apr -2026 Phone: 08795202691E -mail arcdesignservices@gmail.com Indemnity Insurance Number: I See Insurance Cert Attached Digitally signed by Oliver Farrelly Oliver Farrelly Date: 2026.04.21 16:31:45 Signature: +0V001 '1!C.. L - icy`_ �i'r•. � �'. Location of Test Holes Trial Hole i Ott t ^, `�stKer � c' , y r. ; ... t..} , 4n;4 ��� t, •� firE.f,. 1 r, r `? •�i ti. r.'4fi, A�*" �`�. •'✓! I. T -Test Hole 1 T -Test Hole 2 T -Test Hole 3 P -Test Hole 1 P -Test Hole 2 P -Test Hole 3 651 Bedrock Aquifer `� II Lm ; , + GSI Rock Unit Groups 9 0 Permo•Triassic Sandstones NAME Pe/mo Triasec Sandstones CalcCIass Calcareous GSI Vulnerability Moderate Vulnerability National Soils A CJ AntinPD IFS_Soil 1 nr nPD Parent Material TLP5sS IFS_Deseriptlon Acid Deep Poorly Drained Mineral IFS Type Deep poorly drained mineral - Derived from mainly non calcareous parent materials Soil Group Surface water Greys. Ground water Greys County 1'OlMGNAN IFS_Code 31 r 9 II Subsoils 3811391.49781 PERIMETER 331139149781 PAP MAT TLPSs5 COUNTY MONAGHAN CATEGORY TO type DESCRIPT Sandstone and shale till lLower Paleozoic) TEXTURE Ciayc; Class Tills ldlamictons) PlalnEnglish The subsoil is atilt type. Till Is sediment depes-ted by m from glaaor ice. m X CD H z G) G) O C z O r m m r I C C) -o D m �n n� 00 rtn D0) O� z� m Z Dv z - H m0 C Or D O> r C� xO CD O mz '- -ziX 0 m D O m G�O D C z mx z r C (I) zm0 H C U)O z 0.85 O H mmo X0)3 m0_ >m> cnO* _� r- > *z m mm� 000 r D D p=i mzz mm 0 N O1 radius Insuianco Solutions Insurance Cover Note 2025 linsured Oliver Farrelly T/A Arc Design Services Address Mountainpole, Kells, Meath, Business Description Ecology Consultancy Cover Details Professional Indemnity €1,000,000 Insurer OPTIS Insurances Ltd T/A Optis Insurance Policy Number Inception Date 08/12/2025 Renewal Date 08/12/2026 3" Floor, Block I Quayside Business Park Mill Street, Dundalk, Co. Louth Ireland 042 939 3993 nrnwsadiusinsurancesolutions_ comlie NOTES: Exist Plante_. _ hedging. x �1 Stino G.crirultL�rai ca`•_e±0 Vt- 26.31n COPYRIGHT RESERVED TO P SHANNON BUILDING S CIVIL ENGINEERING LTD PLANNING PERMISSION DRAWINGS ONLY. CONSTRUCTION DRAWINGS TO BE USED FOR. CONSTRUCTION PHASE. STRUCTURAL DRAWNGS TO BE ISSUSED BY ENGINEER. DO NOT SCALE OF DRAWING ALL DIMENSIONS TO 8E CRECASD ON SITE ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH CURRENT BUILDING REGULATIONSAND CODES OF TICS ALL MEASUREMENTS, LEVELS AND CON COO DETAILS TO BE VERIFIED BY BUIL CONT DIRECTION OF GROUNDWATER FLOW V / �0 O _Q O '-O \ \i::< S O ,Trial Hol ' �: �L - New S±c rirance peers ION,_ CO. 1C. PLANNING SECTION 05 MAY 2026 REV. DA SCRIPTION REF. P Shannon Building & Civil Engineering Ltd Lecer{m. Thl. 042 9861551 087 2708685 CLIENT: T•�--� U,MM PROJECT TITLE: Renovation and Extension to Existing Cottage DRAWING TITLE; S' to Lcyput Plt v PROJECT STAGE: Planning Permission DRAWN BY SCALES Pizraic Shannon 1 : 250 DWG NO. DATE C -1O1 24-02-2026 PROJECT REFERENCE NO. REVISED �` Ve � \ \\ CAS PROPOSED GARDEN N. 54.39x1 �� �_ mm rigid rafed pipes at 1:200, sent \ �2 \\ \. 60 min ftwe in1ng..;wusafusatsd-s "1 between. '� ��,'\ \ point o jfltmtion nd water table or bedrock. SOAKPIT PARKING V � - - - - - . \. __)�\�\\\ 'A'HhI!,!.! 1IHIJ,X " - -' ,/ (lllii �\ SITE NOTICE PROPOSED \. EXTENSION �. TiJi SITE BOUNDARY /\