Loading...
HomeMy WebLinkAbout2560433 - Chief Executives OrderMONAGHAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (as amended) Chief Executive's Order No: Reference Number Name of Applicant: Address: P433-26 25/60433 Richard McChesney Stephen Moffett Corlea Ballybay Co. Monaghan A75 EK26 Nature of Application: Permission to construct a turkey rearing house together with all ancillary structures including vertical meal bin & underground washings tank, along with associated ancillary site works, using existing shared private access lane Location of Development: Derryarrilly Castleblayney Co. Monaghan ORDER: I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended) and the Planning and Development Regulations 2001 (as amended) to grant permission for the above development in accordance with documents submitted, subject to the 5 condition(s) set out in the Schedule attached hereto. I further decide that PERMISSION be granted subject to the same conditions on the expiration of the period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no appeal before An Coimisiun Pleanala. Adrian Hughes SENIOR PLANNER 08 • CAS" Z� Date 25/60433 Richard McChesney, Derryarrilly, Castleblayney, Co. Monaghan 1. a) The developer shall pay to Monaghan County Council a sum of €2992 in accordance with the General Development Contribution Scheme 2021-2026 made by the Council under Section 48 of the Planning and Development Act 2000 (as amended), towards expenditure incurred or proposed to be incurred by the Council in the provision of community, recreation and amenity public infrastructure and facilities in the area. b) The sum attached to this condition shall be revised from the date of the grant of planning permission to the value pertaining at the time of payment in accordance with the Wholesale Price Index for Building and Construction (Materials and Wages). c) No works shall commence until payment of the development contribution is made in full, or until Monaghan County Council has agreed in writing to a schedule of phased payments of the sum. Reason: It is considered appropriate that the developer should contribute towards the expenditure incurred or proposed to be incurred by the Council in the provision of community, recreation and amenity infrastructure and facilities in the area. a) Developer shall ensure that adequate measures are in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any watercourse. These measures shall take account of the relative guidance produced by Inland Fisheries Ireland (IFI). b) All soiled waters shall be directed to a storage tank. c) No effluent or slurry shall discharge or be allowed to discharge to any stream, river, watercourse, groundwater body or to the public road. d) All soiled waters shall be collected, stored and utilised in accordance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations 2025. e) All uncontaminated roof water from buildings and yard water shall be separately collected and discharged in a sealed system to an adequate soakpit and shall not discharge or be allowed to discharge to the foul effluent drains, foul effluent and slurry storage tanks or to the public road. f) An inspection manhole shall be installed for sampling and inspection purposes and shall be located on the surface/storm water line after the silt trap and prior to the discharge. g) All drainage works shall be carried out in accordance with agreed details. h) All organic fertiliser generated by the development hereby approved (and existing development within the site) shall be conveyed through properly constructed channels to the proposed facilities and shall not discharge or be allowed to discharge to any stream, river, watercourse, groundwater body or public road. Seepage from the manure storage shed shall be directed to leak proof storage facilities in accordance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations 2025. i) All organic fertiliser generated by the proposed development shall be disposed of in accordance with the details submitted to the Planning Authority and in accordance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations 2025. j) Organic fertiliser shall be taken off -site by the contractor/haulier as stated in the planning application. This contractor must be registered with the Department of Agriculture Food and Marine and the organic fertiliser shall be utilised in accordance with the requirements of the European Union (Good Agricultural Practice for Protection of Waters) Regulations 2025. Any changes in contractor shall be agreed in writing with the Planning Authority. I<) There shall be no change in poultry type or increase in the numbers of poultry being accommodated at this site unless otherwise agreed in writing with the Planning Authority. I) Any construction and demolition waste or excess soil generated during the construction phase, which cannot be reused on -site, shall be suitably disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 (as amended). One month prior to the commencement of development, the developer shall submit waste dockets for the removal and disposal of any asbestos arising from the demolished poultry unit. Any imported fill material shall be appropriately acquired and shall be suitable in nature. m) All waste oils and any other hazardous waste materials shall be stored appropriately and collected, recovered or disposed of in accordance with the Waste Management Act 1996 (as amended); records of such shall be kept on -site. n) All hazardous liquid waste or oil/fuel storage containers, temporary or otherwise, shall be bunded. o) All bunds shall be designed to contain 110% of the capacity of the largest storage container located within the bund. p) There shall be no overflow drain facility from any bunds on -site and all filling and off -take points shall be located within a bund. q) Facilities shall be provided for the collection and segregation of recyclable waste. Waste shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act 1996 (as amended). r) Developer shall immediately inform the Planning Authority and IFI (Inland Fisheries Ireland) of an accidental spillage of wastewater, organic fertiliser, fuel, machine oil or any other substance which may threaten the quality of any watercourse or groundwater body. s) All structures shall accord with pertaining Departmental specifications. Reason: In the interest of environmental protection. a) Roofing material shall be dark green, dark grey, dark blue or black in colour. b) No unpainted metal sheeting shall be used for roofing or on the external wall finishes. Reason: In the interest of visual amenity. Ground and floor levels shall be as per the plans submitted. Any facilitating cut and/or fill shall be graded to a natural contour to reflect the existing topography of the area, and slopes shall be suitably finished with topsoil and grass seed. Reason: In the interests of visual amenity and securing a satisfactory standard of development. a The development shall be carried out strictly in accordance with the plans and documents submitted on the 29/10/2025 as amended on the 14/04/2026, and as may otherwise be required in order to comply with the above conditions. Reason: In the interest of proper planning and sustainable development. Adrian Hughes Senior Planner cg . OS • 2 Date