HomeMy WebLinkAbout2560200 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT To: Donna McEvoy (A/Executive Scientist) From: Caitriona Gaffney (A/Senior Executive Technician – Waste Team) Re: 25/60200 JES Holdings Ltd Consultants: Finegan Jackson Permission: permission for the demolition of existing structure ruins and boundary wall and gate entrance at Parnell Street, the construction of 3no. 3 storey, terraced apartment buildings consisting of: 3no. 1-bed units at ground floor level and 3no. 2-bed units at first/second floor level, connections to existing public services, revised boundaries and all associated site works. Location: Parnell Street, Drummond Etra, Carrickmacross Date: 24/04/2026 Background The following additional information was requested: ‘’5. A hydrogeological assessment (prepared by a suitably qualified hydrogeologist) to include a groundwater and surface water assessment, identification of potential pathways to the groundwater aquifer, the Proules River and the public water supply zone of contribution. This plan shall identify mitigation measures to protect groundwater and surface water during construction and operational phases of this development.’’ A report prepared by Traynor Environmental Ltd. (26.199 TE, 22nd April 2026) has been submitted. Mitigation measures for the construction and operational phases have been outlined and should be adhered to if planning is granted. Recommendation I have no objection to planning subject to the following conditions: a) Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. Therefore, one month prior to commencement of development the applicant shall submit to the planning authority the following: i. A Construction and Demolition and By-Products Waste Management Plan for the proposed development works. The plan shall be prepared using “Best Practice Guidelines for the preparation of resource & waste management plans for construction and demolition projects” – EPA, 2021. ii. An asbestos survey and removal plan for the proposed development works. b) The developer shall adhere to the mitigation measures for the construction and operational stages of this development as outlined in the Hydrogeological Risk Assessment Report, by Traynor Environmental (26.199 TE, 22nd April 2026). c) The applicant shall ensure completely separate foul and surface water drainage systems are in place. Within one month of completion of development an as built CCTV survey shall be carried out on the drainage systems to ensure completely separate storm and foul water drainage systems and that no misconnections have occurred. Any misconnections identified shall be rectified. Full report shall be submitted to the Planning Authority. d) The applicant shall ensure that adequate measures are in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any watercourse. These measures shall take account of the Guidance produced by Inland Fisheries Ireland titled “Requirements for the Protection of Fisheries Habitat during Construction and Development Works at River Sites”. e) Monaghan County Council and Inland Fisheries Ireland shall be informed promptly of an accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge which may threaten the quality of any watercourse or groundwater body. f) Any hazardous waste and/or oil/fuel storage containers temporary or otherwise to be bunded and shall be disposed / recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended. Please note that bunds are to be designed to contain 110 % of the capacity of the largest storage container located within the bund. g) Facilities shall be provided for the collection and segregation of waste including general waste, recyclable waste and food waste. Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act 1996 as amended. h) Applicant/developer is required to take all necessary precautions to prevent any risk of flooding or pollution occurring to roadways and adjoining properties/lands during all construction works/site works associated with this development/site and on completion of all works i) If infilling material is required to be imported onsite the applicant shall conform to one of the following; i. Economic operator shall utilise EPA Article 27 notification in moving soil infill material from one site to another. EPA registration notification shall be submitted to the Planning Authority prior to commencement of development. or ii. If using waste material as infill and prior to acceptance of material a valid permit must be issued by Monaghan County Council in accordance with the Waste Management (Facility Permit and Registration) Regulations 2007 as amended. or iii. Buy topsoil material as a product for final landscaping purposes only. Documentation demonstrating purchase shall be submitted to Planning Authority. Signed: Date: 24/04/2026 __________________ Caitriona Gaffney A/ Senior Executive Technician Approved By: Date: _________________ A/Executive Scientist