HomeMy WebLinkAbout2560358 - Chief Executives OrderMONAGHAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (as amended) Chief Executive's Order No: P449-26 Reference Number: 25/60358 Name of Applicant: Yvonne Mohan Address: Eamon Sheridan Markethouse, Main Street Arvagh Co. Cavan H12W1W8 Nature of Application: Permission consisting of the construction of an extension to the rear of an existing storey and a half type dwelling house, internal and external alterations to dwelling house, conversion of existing attached shed to living accommodation, new/modified entrance, boundary walls, piers and fencing, decommissioning of existing septic tank and replace with proprietary sewage treatment unit and percolation area and all ancillary site works Location of Development: Sheetrim Monaghan Co. Monaghan ORDER: I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended) and the Planning and Development Regulations 2001 (as amended) to grant permission for the above development in accordance with documents submitted, subject to the 9 condition(s) set out in the Schedule attached hereto. I further decide that PERMISSION be granted subject to the same conditions on the expiration of the period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no appeal before An Coimisiun Pleanala. Adrian Hughes SENIOR PLANNER Date 25/60358 Yvonne Mohan, Sheetrim, Monaghan, Co. Monaghan 1. a) The developer shall pay to Monaghan County Council a sum of €168.00 in accordance with the General Development Contribution Scheme 2021-2026, made by the Council under Section 48 of the Planning and Development Act 2000 (as amended), towards expenditure incurred or proposed to be incurred by the Council in the provision of community, recreation and amenity public infrastructure and facilities in the area. b) The sum attached to this condition shall be revised from the date of the grant of planning permission to the value pertaining at the time of payment in accordance with the Wholesale Price Index for Building and Construction (Materials and Wages). c) No works shall commence until payment of the development contribution is made in full, or until Monaghan County Council has agreed in writing to a schedule of phased payments of the sum. Reason: It is considered appropriate that the developer should contribute towards the expenditure incurred or proposed to be incurred by the Council in the provision of community, recreation and amenity infrastructure and facilities in the area. ►Q a) Prior to any other works commencing, visibility splays of 70 metres, measured to the nearside road edge in each direction, shall be provided from a point in the centre of the entrance 2.4 metres from the road edge at a height of 1.05 metre to 2.0 metres above ground level to an object height of 1.05 metres to 2.0 metres above ground level in both directions. The visibility splays shall be retained and kept clear thereafter. b) Where it is necessary to remove hedges, fences, embankments or other obstructions in order to achieve the required visibility splays, they shall be reinstated behind the visibility splays. It is recommended that any new trees or shrubs are planted back from the visibility splays to allow for future growth and some species will require additional set back. All existing planting must be kept trimmed behind visibility splays. c) Where the existing roadside hedge/embankment is to be removed, the roadside verge shall be widened (by grading back or infilling where necessary using appropriate inert material) to include the entire area within the visibility splays, top soiled, and grassed to the satisfaction of the planning authority. d) The new entrance shall form a bellmouth of 4.0 metres radius with edge of new boundary. Recessed entrance shall be of sufficient dimensions to contain a stationary vehicle off the public road. Entrance gates shall open inwards only. e) Entrance/access road shall be surfaced with concrete or bitmac from edge of public road for a minimum of 5 metres and the surface shall be graded back so that its level at 3.0 metres from the edge of the carriageway is a minimum of 100 mm below road level. Gradient of access road shall be not greater than 1:20 (5.0%) for the first 5 metres from boundary and 1:10 (10.0%) thereafter. f) Cattlegrid/ACO Drain/Gullies shall be installed at proposed entrance to the public road and constructed in such a manner as to prevent water from the entrance flowing onto the public road. Similarly, measures shall be taken to prevent road surface water from flowing onto the entrance. The discharge from the above drainage shall be piped to an appropriate drainage pipeline or watercourse. g) Provision shall be made within the site for surface water drainage and no surface water to be allowed flow onto the public roadway. The discharge of surface water from the public road onto the site through road surface drainage and road subsoil drainage to remain unimpeded. h) No development exempt or otherwise shall be erected over the public sewer, drain or water -main, unless otherwise agreed in writing with the planning authority. i) Before any work is commenced on this development a security, by way of a cash deposit, in the sum of €2250, shall be paid to the planning authority by the developer to ensure the satisfactory completion of all surface water drainage/boundary work within and abutting the site area, to prevent runoff of surface water onto the public roadway and to ensure that no damage is caused to public roadway and any such damage is repaired satisfactorily. Failure to carry out all entrance works to a standard to the satisfaction of the planning authority will result in forfeiture of part or all of the cash security. Reason: In the interest of traffic/road safety. 3. a) Prior to commencement of development, the applicant shall submit to the Planning Authority for agreement in writing; (i) A fully completed Water Protection Plan checklist. (ii) A Construction and Environmental Management Plan (CEMP) for agreement. This plan shall be sufficient to demonstrate that adequate measures will be in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any waters. The Construction and Environmental Management Plan shall take account of best practice and the guidance produced by Inland Fisheries Ireland titled "Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters 2016". The CEMP shall include the location details of the monitoring points where daily visual checks shall be carried out. (iii) A site -specific Construction & Demolition Resource Management plan for approval. Applicant to consider Best Practice Guidelines for the preparation of Resource & Waste Management Plans for construction and demolition projects. (iv) An Asbestos survey and removal plan for the proposed development works. b) No development shall commence until the information required under a) above has been agreed in writing with the Planning Authority. Reason: In the interest of environmental protection. 4. a) The developer shall ensure that mitigation measures in the CEMP are implemented and that adequate measures and precautions are in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters discharging from the site to any watercourse. These measures shall take account of the Guidance produced by Inland Fisheries Ireland titled "Requirements for the Protection of Fisheries Habitat during Construction and Development Works at River Sites", available to download at https://www.fisheriesireland.ie/documents/624-guidelines- on-protection-of-fisheries-during-construction works-in-and-adjacent-to- waters/file.html. b) Monaghan County Council and Inland Fisheries Ireland shall be informed immediately of an accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge which may threaten the quality of any watercourse or groundwater body. c) The applicant shall ensure completely separate foul and surface water drainage systems are in place. d) The onsite wastewater treatment system and infiltration area shall be maintained in accordance with manufacturers specifications. e) Waste arising from the desludging of the wastewater treatment system shall be collected by a suitably permitted collector in accordance with the Waste Management Act, 1996 as amended. f) Material storage, fuel handling, parking areas and other yard activities shall be managed in a manner which prevents the discharge of polluting matter to ground or surface water. g) Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. h) If mulling material is required to be imported onsite the applicant shall conform to one of the following; (i) If utilising EPA Article 27 notification to move soil infill material from one site to another, official correspondence from the EPA granting approval shall be submitted to the Planning Authority prior to commencement of development. or (ii) If using waste material as infill, a valid permit must be obtained from Monaghan County Council under the Waste Management (Facility Permit and Registration) Regulations 2007 as amended prior to acceptance of material. or (iii) If buying topsoil material as a product for final landscaping purposes only, documentation demonstrating purchase shall be submitted to Planning Authority. The applicant shall ensure completely separate foul and surface water drainage systems are in place. j) The onsite wastewater treatment system and infiltration area shall be maintained in accordance with manufacturers specifications. k) Waste arising from the desludging of the wastewater treatment system shall be collected by a suitably permitted collector in accordance with the Waste Management Act, 1996 as amended. 1) Material storage, fuel handling, parking areas and other yard activities shall be managed in a manner which prevents the discharge of polluting matter to ground or surface water. m) All hazardous liquid waste or oil/fuel storage containers, temporary or otherwise, shall be bunded. All bunds will be designed to contain 110 % of the capacity of the largest storage container located within the bund. There shall be no overflow drain facility from any bunds on site and all filling and off -take points shall be located within a bund. n) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act, 1996 as amended. Reason: In the interest of environmental protection. 5. The following requirements shall be fully complied with: a) The applicant is required to engage the services of a suitably qualified archaeologist (licensed under the National Monuments Acts 1930-2004) to carry out pre - development testing at the site. No sub -surface work shall be undertaken in the absence of the archaeologist without his/her express consent. b) The archaeologist is required to notify the Department of Housing, Local Government and Heritage in writing at least four weeks prior to the commencement of site preparations. This will allow the archaeologist sufficient time to obtain a licence to carry out the work. c) The archaeologist shall carry out any relevant documentary research and may excavate test trenches at locations chosen by the archaeologist, having consulted the proposed development plans. d) Having completed the work, the archaeologist shall submit a written report to the Planning Authority and to the Department of Housing, Local Government and Heritage. e) Where archaeological material is shown to be present, avoidance, preservation in situ, preservation by record (excavation) and/or monitoring may be required, the Department of Housing, Local Government and Heritage will advise the Applicant/Developer with regard to these matters. f) No site preparation or construction work shall be carried out until after the archaeologist's report has been submitted and permission to proceed has been received in writing from the Planning Authority in consultation with the Department of Housing, Local Government and Heritage. Reason: To ensure the continued preservation (either in situ or by record) of places, caves, sites, features or other objects of archaeological interest. 6. a) Existing mature trees and hedgerow defining the site boundaries shall be permanently retained in this development. They shall also be reinforced with additional planting as per the submitted landscaping plan and protected from damage at all times, particularly during building operations. b) Notwithstanding the submitted landscaping plan, the new site boundaries shall be planted with native hedgerow species so as to form naturalised hedgerows similar to existing hedgerows in the vicinity. Predominant species shall be whitethorn, with blackthorn, hazel and holly also included. Planting shall be in a double staggered row with 8 (eight) 2-3 year -old plants per metre; 250mm apart, with 300mm between rows. c) Hedgerow planting, as required, shall be supplemented as per the submitted landscaping plan with native tree species at irregular intervals. Species shall include ash, oak, sycamore and beech. d) Planting as required shall be carried out in the first planting season following commencement of building operations and shall be permanently retained thereafter. Any plant which fails in the first planting season shall be replaced. Trees shall be allowed to mature and shall not be topped when trimming hedgerows. e) Any boundary fencing shall be of stained wood Reason: In the interest of visual amenity. 7. a) The proposed effluent treatment and disposal system shall be located, constructed and maintained in accordance with the details submitted to the planning authority on the 03/09/2025 and in accordance with the requirements of the document entitled The Environmental Protection Agency Code of Practice Domestic Waste Water Treatment Systems (Population Equivalent <= 10) 2021. No system other than the type proposed in the application shall be installed without the prior written agreement of the Planning Authority. b) A maintenance contract for the effluent treatment and disposal system shall be entered into from the first date of occupancy of the dwelling and permanently maintained thereafter. Signed and dated copies of the contract, which shall be for a minimum period of 3 years, shall be submitted to, and agreed in writing with the planning authority within 2 months of the installation. c) Surface water soakaways shall be located such that the drainage from the dwelling and paved areas of the site shall be diverted away from the location of the polishing filter. d) Within two months of the first occupation of the dwelling, the developer shall submit a report from a suitably qualified person with professional indemnity insurance certifying that the proposed effluent treatment and disposal system has been installed and commissioned in accordance with the approved details and is working in a satisfactory manner and that the polishing filter is constructed in accordance with the standards set out in the EPA document. e) Proposed well to be located a minimum of 30m upgradient of proposed on site DWWTS. Reason: In the interest of public health and environmental protection. 8. The external finishes of the proposed extension shall match the existing house in respect of materials and colours unless otherwise stated on the lodged plans and specifications. Reason: In the interest of visual amenity 9. The development shall be carried out in accordance with plans and documentation submitted to the Planning Authority on 03/09/2025 as amended by additional information submitted to the Planning Authority on 20/04/2026 and 22/04/2026 except as may otherwise be required in order to comply with the above conditions. Reason: To ensure a satisfactory standard of development. o2 •c Adrian Hughes Senior Planner Date