Loading...
HomeMy WebLinkAbout2660126 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT To: Martina Smith (Environment Section – A/Executive Scientist). From: Peter Deery (Environment Section – Water Team). Re: 26/60126 Hadabo Developments Ltd. Permission: Permission for development comprising of the following: • Demolition of an existing two-storey derelict dwelling and associated single-storey garage, • Construction of 12 no. new dwellings to include:-1 no. two-bedroom, single-storey detached dwelling,-1 no. three-bedroom, two-storey detached dwelling,-2 no. two-bedroom, two-storey semi-detached dwellings,-8 no. three-bedroom, three-storey semi-detached dwellings • New vehicular entrance onto an existing public access together with a new pedestrian footpath • Connections to mains services including water, foul and storm, • Associated open space, landscaping & boundary treatments, • Together with all associated works at Killyconigan, Monaghan, Co. Monaghan. Location Killyconigan, Monaghan, Co. Monaghan. Date: 07/05/2026 Background The proposed development is located on a regionally important fissured aquifer in an area of moderate groundwater vulnerability. The development site is located within the Blackwater [Monaghan]_SC_010 subcatchment, and within the Shambles_010 sub-basin which has been assigned poor status under the Water Framework Directive status (2019 - 2024) with an objective of Restore. A Water Protection Plan checklist has not been submitted as part of the application. The application states that foul water will discharge to the public sewer via a new connection. A copy of the pre-connection enquiry to Uisce Éireann has been provided, however, a Confirmation of Feasibility has not. The application states that storm water will discharge to the public storm sewer via a new connection. The application shows that a new 101.76m3 attenuation system, hydrobrake, and Class 1 interceptor will be installed prior to discharge to the public storm drain. The proposed development will also incorporate permeable paving to reduce the hydraulic loading on the public storm drain. Recommendation I recommend the following additional information: a) Submit a fully completed Water Protection Plan checklist. b) Submit a Confirmation of Feasibility from Uisce Éireann confirming that Monaghan Wastewater Treatment Plant has capacity to accept the hydraulic and organic loading arising from the proposed development. c) Submit a Construction and Environmental Management Plan (CEMP) for agreement. This plan shall be sufficient to demonstrate that adequate measures will be in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any waters. The Construction and Environmental Management Plan shall take account of best practice and the guidance produced by Inland Fisheries Ireland titled “Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters 2016” and shall include the identification of potential pathways to the groundwater aquifer and the River Shambles. The CEMP shall be prepared by a suitably qualified person and shall include the location details of the monitoring points where daily visual checks and weekly surface water monitoring (physical& chemical parameters) shall be carried out. Signed: Date: 07/05/2026 Peter Deery A/Senior Executive Technician Approved By: Date: 11/05/2026