Loading...
HomeMy WebLinkAbout2560418 - F.I. Received Doc. - Building Life Cycle ReportProposed Residential Development at 2 Main Street Cornamucklaglass Ballybay. BUILDING LIFE CYCLE REPORT Monaghan County Council Date of Issue:04/03/2026 RECEIVED: 13/05/2026 Prepared By: Horizon Group Market Square, Drumillard Little, Castleblayney, Co. Monaghan, A75 FP70 RECEIVED: 13/05/2026 Table of Contents INTRODUCTION ...................................................................................................................................... 1 SECTION 01 ............................................................................................................................................ 3 1.1.Property Management of the Common Areas of the development ....................................... 3 1.2.Maintenance Costs / Life Cycle Costs ..................................................................................... 3 SECTION 02 ............................................................................................................................................ 4 2.1.Energy and Carbon Emissions ................................................................................................ 4 2.2.Materials ................................................................................................................................ 5 2.2.1.Buildings ......................................................................................................................... 6 2.2.2.Material Specification ..................................................................................................... 6 2.3.Waste Management ............................................................................................................... 7 2.4.Health & Well Being ............................................................................................................... 8 2.5.Management .......................................................................................................................... 8 2.6.Transport ................................................................................................................................ 9 APPENDIX A ......................................................................................................................................... 10 APPENDIX B: ........................................................................................................................................ 11RECEIVED: 13/05/2026 INTRODUCTION This Building Lifecycle Report was prepared on behalf of Thomas Kerr and, to accompany a proposal for the development of 2no. 1 bed apartments residential units, 1no. Studio apartment and maintaining shop front on ground floor on a site of circa .031ha hectares in area, located at 2 Main Street Cornamucklaglass Ballybay. Section 01: An assessment of long-term running and maintenance costs as they would apply on a per residential unit basis at the time of application Section 02: Measures specifically considered by the proposer to effectively manage and reduce costs for the benefit of residents. 1RECEIVED: 13/05/2026 2RECEIVED: 13/05/2026 SECTION 01 AN ASSESSMENT OF LONG-TERM RUNNING AND MAINTENANCE COSTS AS THEY WOULD APPLY ON A PER RESIDENTIAL UNIT BASIS AT THE TIME OF APPLICATION 1.1.Property Management of the Apartment Units and Common Areas The apartment units shall be owned by applicant. The owner shall be responsible for the management of the buildings and common areas. 1.2.Maintenance Costs / Life Cycle Costs The owner shall be responsible for building maintenance and upkeep. The following section outlines the design measures that have been adopted to reduce long-term running costs. It also includes a sample Building Investment Fund report that identifies those works which are necessary to maintain, repair, and enhance the premises over a 30-year life cycle period. This can be used to guide the preparation of maintenance and renewal budgets over the lifecycle of the buildings. A sample format of the typical BIF report is set out in Appendix A. Note: the detail associated with each element heading i.e., specification and estimate of the costs to maintain / repair or replace, can only be determined after detailed design and the procurement/ construction of the development and therefore has not been included in this document. 3RECEIVED: 13/05/2026 SECTION 02 MEASURES SPECIFICALLY CONSIDERED BY THE PROPOSER TO EFFECTIVELY MANAGE AND REDUCE COSTS FOR THE BENEFIT OF RESIDENTS . 2.1.Energy and Carbon Emissions The following are an illustration of the energy measures that are planned for the units to assist in reducing costs for the occupants. Measure Description BER Certificates A Building Energy Rating (BER) certificate will be provided for each dwelling in the proposed development which will provide details of the energy performance of the dwellings. A BER is calculated through energy use for space and hot water heating, ventilation, and lighting and occupancy. It is proposed to target an A2/A3 rating for the apartments. This will equate to the following emissions. A2 – 25-50 kwh/m2/yr with CO2 emissions circa 10kgCO2/m2 year A3 – 51-75 kwh/m2/yr with CO2 emissions circa 12kgCO2/m2 /year Note proposed Part L revisions will increase the energy efficiency standard required for residential units. Fabric Energy Efficiency The U-values being investigated will be in line with the requirements set out by the current regulatory requirements of the Technical Guidance Documents Part L, titled “Conservation of Fuel and Energy Buildings other than Dwellings”. Thermal bridging at junctions between construction elements and at other locations will be minimised in accordance Paragraphs 1.2.4.2 and 1.2.4.3 within the Technical Guidance Documents Part L. See below Table 1 of Part L, Building Regulations. Energy Labelled White Goods The white good package (where provided) in the apartments will be of a very high standard and have a high energy efficiency rating. It is expected that the below appliance ratings will be provided: Oven - A plus Fridge Freezer - A plus Dishwasher - AAA Washer/Dryer - B Internal Common Areas & External Lighting Low energy luminaires and automatic controls such as motion sensors are to be provided for electric lighting to maximize efficiency in use. LED lamps will be preferred as far as is practical. Lighting will be provided to ensure a safe environment for pedestrians, cyclists and moving vehicles, to deter anti- social behavior and to limit the environmental impact of artificial lighting on existing flora and fauna in the area. 4RECEIVED: 13/05/2026 The following are Low energy technologies that are being considered for the development and during the design stage of the development, in order to meet the requirements of Part L of the Building Regulations and the Near Zero Energy Building standard. The specific combination from the list below will be decided on and then implemented to achieve the A2/A3 BER Rating. Measure Description Benefit Condensing Boilers There will be no fossil fuels on this site. Mechanical Ventilation Heat Recovery Centralised mechanical ventilation will be provided to all dwellings to ensure that the air quality within the dwellings will be adequate. The inclusion of Heat Recovery Ventilation into the centralised ventilation system will be considered and assessed, in order to minimise the energy usage within the dwelling. Mechanical Heat Recovery Ventilation provides ventilation with low energy usage. The MVHR reduces overall energy and ensures a continuous fresh clean air supply. PV Solar Panels PV Solar Panels will be considered in order to meet the renewable energy contribution required by Part L of the Building Regulations. These panels convert sunlight into electricity which can be used within the dwelling. The panels are typically placed on the South facing side of the building to maximise the solar exposure. PV Solar Panels offer the benefit of reducing fossil fuel consumption and carbon emissions to the environment. They also reduce the overall requirement to purchase electricity from the grid. Air Source Heat Pump As part of the overall energy strategy, the use of Air Source Heat Pumps will be assessed to determine their technical and commercial feasibility. These systems extract heat energy from the outside air and, using a refrigerant cycle, raise the temperature of the heat energy using a refrigerant vapour compression cycle. Air source heat pumps use electrical energy from the grid to drive the refrigerant cycle but do so extremely efficiently. Modern heat pumps will typically provide 4 to 5 times more heat energy to the dwelling than the electrical energy they consume. 2.2.Materials The practical implementation of the Design and Material principles has informed the design of internal layouts, detailing of the proposed apartment buildings and building facades. 5RECEIVED: 13/05/2026 2.2.1 Buildings Apartment Buildings are designed in accordance with the Building Regulations, in particular Part D ‘Materials and Workmanship’, which includes all elements of the construction. The Design Principles and Specification are applied to both the apartment units and the common parts of the building and specific measures taken include: Measure Description Benefit Own Door Access to studio and associated apartment Avoids the cost of heating and lighting shared communal spaces. Each occupier responsible for their own energy use Waste storage Communal bin stores for apartment & studio block Apartments conveniently located within the communal open space within walking distance of the stair Block own-door apartments provided with individual refuse storage allocated to each unit. Each located within walking distance from the front door of each unit. Improved Daylighting Reduces the requirement for artificial lighting Passive ventilation in conjunction with background mechanical ventilation Avoids the reliance on mechanical ventilation systems for purge ventilation External paved and landscaped areas All of these require low/minimal maintenance Plant is easily accessible at ground level and via a staircase at roof level for ease for access. Allows for easier maintenance and replacements as necessary 2.2.2 Material Specification Measure Description Benefit Consideration is given to the requirements of the Building Regulations and includes reference to BS 7543:2015, ‘Guide to Durability of Buildings and Building elements, Products and Components’, which provides guidance on the durability, design life and predicted service life of buildings and their parts. The common parts are designed to incorporate the guidance, best practice principles and mitigations of Annexes of BS 7543: 2015 including: Annex A Climatic Agents affecting Durability Annex B Guidance on materials and durability Annex C Examples of UK material or component failures Annex D Design Life Data sheets Ensures that the long-term durability and maintenance of Materials is an integral part of the Design and Specification of the proposed development. Use of brickwork and rendered panels to envelope.Requires minimal on-going maintenance. Use of factory finished alu or uPVC windows and doors,Requires minimal on-going maintenance. 6RECEIVED: 13/05/2026 2.3.Waste Management The following measures illustrate the intentions for the management of Waste. Measure Description Benefit Construction and Operational Waste Management Plan The application is accompanied by a Construction and Operational Waste Management Plan prepared by the applicant The report demonstrates how the scheme has been designed to comply with best practice. Storage of Non- Recyclable Waste and Recyclable Household Waste Apartments conveniently located within the communal open space within walking distance of the stair Studio and own-door apartment provided with individual refuse storage allocated to each unit. Each located within walking distance from the front door of each unit. -Grey, Brown, and Green bin distinction. Easily accessible by all residents, with external access from the street for waste collection Composting Organic waste bins to be provided in communal store Helps reduce potential waste charges. 7RECEIVED: 13/05/2026 2.4.Health & Well Being The following are illustrations of how the health and well-being of future residents are considered. Measure Description Benefit Natural / Day Light The design, separation distances and layout of the building has been designed to optimize the ingress of natural daylight/sunlight to the proposed apartments to provide good levels of natural light. Reduces reliance on artificial lighting thereby reducing costs. Accessibility All units will comply with the requirements of Part M fostering easy access and circulation through the proposed scheme. Reduces the level of adaptation, and associated costs, potentially necessitated by residents’ future circumstances. Security The scheme is designed to incorporate passive surveillance with all public spaces overlooked by residential units. Parking is located on street and proximate to the units. Help to reduce potential security/management costs. Natural Amenity The development will include area of landscape amenity space. The open space is surrounded by the housing development and will be treated as a communal open space, providing informal play opportunities. Both amenity spaces are designed to provide formal and informal recreative opportunities. Facilitates community interaction, socialising and play – resulting in improved wellbeing 2.5.Management Consideration has been given to the ensuring the homeowners have a clear understanding of their property Measure Description Benefit Home User Guide Occupiers shall be provided with Homeuser manual – this will provide important information for the purchaser on details of their new property. It typically includes details of the property such as MPRN and GPRN, Information in relation to connect with utilities and communication providers, Contact details for all relevant suppliers and User Instructions for appliances and devices in the property. Residents are as informed as possible so that any issues can be addressed in a timely and efficient manner. 8RECEIVED: 13/05/2026 2.6.Transport Measure Measure Description Benefit Access to Public Transport Ballybay is served primarily by TFI Local Link Cavan Monaghan route MN2, offering multiple daily connections to Monaghan Town and Castleblayney (approx. 20-30 min journey). Key stops include The Square, O'Duffy Terrace, and Wylie's Hill. Additional, less frequent, or specialized services also connect to surrounding areas like Cootehill, Shercock, and Rockcorry. The availability, proximity, and ease of access to high quality public transport services contributes to reducing the reliance on the private motor vehicle for all journey types Bicycle Storage In apartment block there are secure bicycle parking spaces proposed in a dedicated room within the block at ground level accommodating cycles for residents. Accommodates the uptake of cycling and reducing the reliance on the private motor vehicle. 9RECEIVED: 13/05/2026 APPENDIX A: ITEMS INCLUDED IN A TYPICAL BIF The BIF table below illustrates what would be incorporated for the calculation of a Sinking Fund. Building Investment Fund (Sinking Fund) Calculations Building Element Minimum Service life (years) at Service Commencement Date* Structure/ sub structure 60 Floor Structure 60 Roof Structure 60 Roof covering – up to 5 degree pitch 40 Roof covering – over 5 degree pitch 40 Windows 40 External wall/ cladding inc. openings 40 External doors 40 Internal partitions inc. openings 40 Internal finishes 15 Ceilings 40 Internal doors 30 Internal fixtures and fittings 15 Sanitary fittings 20 Kitchen sanitary fittings 20 Built-in furniture 20 Mechanical plant As CIBSE Guide, Vol. B Electrical plant As CIBSE Guide, Vol. B Engineering services distribution systems As CIBSE Guide, Vol. B CCTV installations 20 Fire installations 20 Security installations 20 Communications installations 20 Lifts 15 10RECEIVED: 13/05/2026 Underground drainage 60 External finishes -decorative coatings 25 External fences 30 APPENDIX B: Phases of the Life Cycle of BS7543; 2015 RECEIVED: 13/05/2026 11RECEIVED: 13/05/2026