HomeMy WebLinkAbout2639 - Other AssessmentsTricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TaICEL
Date 01/05/2026
Report No: TSA_MN_19552
Client Name Martin Burns -
Site Location & Townland Corlea, CMX, Monaghan
Thank you for choosing Tricel for your wastewater treatment requirements. This report contains the following
information for your site and is based on a population of 5 and a subsurface/surface value of between 51-75.
Based on the information provided to us and using SR66 and the EPA Code of Practice: Wastewater Treatment
and Disposal Systems Serving Single Houses (p.e. ≤ 10), the appropriate solution for treating wastewater on your
site is a Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area).
Typical layout of a Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation
Area):
9� 1
lr63fn,,d Ftff
I fl 1; f
ptgNoN, c�.
N/Na S jcO.
T/pN
Note:
In the above named site, a substitute wastewater treatment system may not be put in of the following
recommendation.
This recommendation only applies to the above named site based on the information supplied to Tricel.
A Site Characterisation Form should accompany this report. Tricel cannot be responsible for misinformation due
to misleading information being received by us from clients.
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 1
Tricel Site Recommendation Report N
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TRICEL
Section 1: Information on the Novo Package Plant
• Manufacturers report and sizing of the Tricel Novo Package Plant.
• Drawings of the Novo Package Plant.
• Pump selection and technical data
• Certification of the selected Novo Package Plant.
• Brochure on the Novo Package Plant.
• Optional Novo maintenance agreement.
For your site, we recommend a Novo IRL6+ wastewater treatment plant which is designed to treat a maximum of
900 litres of wastewater per day. The Trice] Novo range of wastewater treatment plants is fully in conformance
with EN12566-3 and complies with SR66.
The Novo IRL6+ has a capacity of 4000 litres, of which 2400 are in the primary chamber, this ensures a long
desludging interval.
This solution contains a Tricel 75 pump based on an the Length of Rising Main 20 metres and Difference in
Height of Rising Main 3 metres. A 38mm compression is supplied for connection to a rising main of 38mm
internal bore pipework. Details and pump specifications are contained in Section 1.
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 2
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TRICEL
Section 1
UI7m a
W
F
d
'n
t0
A
ih
r
JJi; -T:-
V
j
W
N
N
G
+
C
U 7
V
z
a
IN
G
f T
I
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 3
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TRICEL
PUMP
Liquid
Type of liquid
Clean and dirty water
Max 1°C)
50°
Handled
Max solids size [mm)
35 spherical
Maximum Immersion [m]
2 (with power cable length S m)
7 (with power cable length 10 m)
Impeller
Open vortex type
Construction
Shaft seal type
Double mechanical seal
Bearing
Sealed ball bearing
Pipe
Suction -Flange [mm]
Discharge -Flange [inch]
35 open
G1Y: UNI ISO 228
Casing
AISI 304
Impeller
AISI 304
Casing cover
AISI 304
Material
Shaft seal
Pump side: SiC/SiC/NBR
Motor side: Carbon/Ceramic/NBR
Seal cover
AISI 304
Shaft
AISI 303 (Wet extension)
Lubricating liquid
White mineral oil: Esso Marcol 152 (180 cc)
Applicable standard of test
ISO 9906 Annex A
MOTOR
Type
Submersible dry type
Single Phase
No. of Poles
2
Rotation speed
min'
2875
Insulation Class
F
Protection degree
iP X8
kW/HP Rating
kW
(HP]
0.55 . 0.75
0.75 + 1
Frequency
Hz
50
230 ± 10i%o
Voltage (Vi
Capacitor
Built in
Over load protection
Built in
Float Switch
Optional
Float Switch Cable
Material
Size
H07RN-F
3G1
Power cable
length
material
size
(m]
5 (only for internal usage); 10
H07RN-F
3G1
Dimensions of cable entry
Cable Gland
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 4
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TRICEL
Pump Type
Power
Capacity
(HP]
I/min
0
40
80
120
163
203
240
303
jjj[KW]
M3
0
2.4
4.8
7.2
9.6
12
14.4
18
H =Total manometric head in meters
Trioel75 0.55 0.75 I8.8II 6.8 5.7 4.7I 341 2 0
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 5
This cocumenl replaces neither the declaration
of performance nor the CE marking
�•
' �) ftacZr(DAtckS
ecdj
D-0.-1)71701 7J
D P 11712 0l 3
ce,YAed aced irq rc
Nr. '7'.i
ISO XOr'207P
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TPICEL
Certificate in accordance with SR66 for EN12566-Part 3
'IA
I , Pruflnstitut i�r
Abwassertechnik
GmbH
TREATMENT PERFORMANCE RESULTS
Tricel (Killarney)
Ballyspillane Industrial Est., Killarney, Co. Kerry, Ireland
EN 12566-3
Results corresponding to EN 12566-3 and S.R. 66
PIA-SR66-1512-1062
Novo
Submerged fixed film
Nominal organic daily load
Nominal hydraulic daily load
Material
Watertightness
Structural behaviour (Calculation)
Durability
rrea0nenl efficiency (nornural sequences)
Number of desludging
Electrical consumption
0.26 kyfd
0.90 m'ld
Glass reinforced plastic
Pass
Pass (also wet conditions)
Pass
Efficiency
Effluent
COD
91.6%
52 mg/I
BOD-
95.9 %
11 mgti
NH4-N
79.9 %
8 mgll
SS
95.3 %
16 nigh
Not more than
once
1.1 lcWh'd
Performnnr.e tested by
PIA — Pri finstitut fir Abwassertechnik GmbH
(PiA GmbH)
Hergenrather Weg 30
52074 Aachen, Germany
,'os puwassprlec
.g' 3
a :i
Elmer Lawub July 2iJ18
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 6
► rn+:v:�uria:u<.;ri:r.,k f-t^i+�a�r vttv�: �; ♦ Eenn if+4TFu711nan .:w+:"Tdr,";gh,,.;�+y ► U -r. r�Scfu":/�r.��.IcS i17TF. r`r+�
J ..q :.:n t:— j] 3 + Eo; >, Pt[. C .; 3777; .;, S r7. 10 n;tr ..-+-1s -...n, .a¢r¢nr*0 s7n7 ucu 1', 7 ,1.1 *3u7
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area)
NOVO BROCHURE
Homeowners: Individual domestic installation
► 706 iq^1ta0461l'7 J'C 61eti 7� fhV'I,y: ► tW 07(47.71 71726..' 4,JSH77.I7U'7+ ► Y,I4-12-.I-I. I I++..',1 hf,'IQ L ,c'4'r7
P•79c Acl .-y II'.:,. 7*I,ir.1'd,!n h y...+' 6_',:M' Jr ..
Larger projects: Commercial Installations up to 5OPE
1 :
Technical characteristics! Plant dimensions
.m
48 I 71 a6t )7S s10 }7b1.773 I 17 e377 66
78 ]L 17.1 7:4 71) san 157'" 17 0373 7.3
78 j J6 764 714 777 lag 117:' I it n575 bo
ia6 sl I 6 774 110 327 1376 U nSsi Bo
4.17 37. 164 777 f 117 7.07 ! 1575 13 0553 13(1
614 66 163 727 It9 502 1.574 t 1.7 3555 500
E74 66 164 227 1" 7w 191 ii 6.16 763
• T.,66 t0 -s0 26 '14 I.*77 1577 77.7 754 11 046 .. .
3.6 7ls s97 I t Hk7 117 l7 i 1776 '55.M
Tad+ A 07.36 46 164 !0'7 1527 7.74 151 11 @1b
7ls4s 66 164 12i 13) rob 717 II 476 7M•747
laA 14.0 36 1t{ 777 $SD fm 173 IS 3iG
41tf 54 166 777 456 7.1* 753 13 016 7P? -7
Tl=• 7440 66 764 777 730 7:K+ LIS 17 (7 46
SPA1 ! 66 17.4 2)7 156 730 I 151 ( 13 676 701+770770
573 {Jy� 1ja S7S
=rri in rhrn1H III II
7'9 ,]t \J]J[� 11[m
'.^
Y7S: �r� •
*4.a,..�t . IlA�1++Y�7IYJINf . u.+wl7soa,�.4
'K + 7t 6;_7 C.v+.a I., ,I:,:,!r.. 7-,dar*J, 767TKr1 nnq 7j -L 7,a k. . 3422 I'«F,•cen.,,.... ;,, !_Y. •••,,:*! ft
:name•r,g u! Vi,r6Gya:r'7. 02P**0I .,p v+70FFup'*
T�ICEL
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 7
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TICEL
Trice) Novo: Wastewater Treatment System
Service Agreement
tstabllshing a regime of ytarly Inspections and maintenance is advised to ensure that your Tricel Novo
continues to perform to the same high standards throughout its lifetime. The service agreement covers
travel, the service and the Iabour cost of servicing only. Other tabour costs are excluded, as are an
replacement parts.
Intel ikillamey) Unlimited Company, Ballyspillane Industrial Estate, Killarney, Co. Kerry, V93 X253,
Ireland (ache Contpany'i enter this Tricel Novo servke ragreenment with the customer named below.
Customer Details
Name:
Address:
Address of She:
(If Other)
Telephone No.:
Date of Trice! Novo Order:
Work Order No.:
Date of Delivery of Tricel Novo:
Date of System Comnuissloning:
Service Agreement Fee Raid:
Date of Service Agreement Corirmertcement:
Unit Serial No.:
Dwrug routine ser tieltig. flit rtnice teclurician tti9 ptrforin a series of cheeks and procedures:
Checks:
• The air -diffuser is monitored to check for sufficient dispersion of air
• The sludge return system is functioning correttfy
• The covers and locks are in place and In good condition
• General appearance and condition of the Veatment system is good.
Procedures:
• The blower is tested.
• The blower filter is replaceed.
• The system alarm is tested.
• The pump and float -switch are tested (If applicable).
• The vents are cleared of any blockages.
• The sludge level in the primary chamber is measured
Notes:
• Full inspection tabour is covered (including any immediate minor system adjustment required)..
This service agreement does not cover the cost of any labour or materials that may arose as a
result of this inspection.
• Components that require replacing will incur additional charges.
• All service agreements exclude de-sludeing
Triiel7}:dI•meyj UMri+nitrd Company aiding it Tirtel.
March : osj
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 8
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) -r ICEL
Section 2: Information on the disposal route
The proposed solution for disposal is percolation trenches which consists of a series of pipework which
distributes the effluent for treatment using in situ subsoil.
Based on a Population of 5 and a percolation value of 51-75 on the site, the chosen polishing filter for this site is
percolation trenches. The minimum amount of pipe required will be 95m. This is based on trench length required
per person for the given percolation value as stated in table 10.1 of the EPA Code of Practice 2021.
It recommends that each percolation trench should be equal in length and no longer than 10m
Please see attached the accompanying documents in Section 2 for the Percolation area
• Percolation area separation distances
• Construction Requirements
The location and construction of the percolation area is the responsibility of the site engineer. A full site layout
drawing should accompany this report.
The EPA CoP 2021 outlines the design, siting and construction requirements for percolation areas.
The tables below outline some of the key factors to take into consideration when designing and locating a
polishing filter.
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 9
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TRICEL
Hot- c 2. Onmintn wpar,i cr. dxlantei 'cr 11, on' to 104,010
F,Jtla/rrwp Wolff % !y aL,lrer Ion pribov amit
1)1 .\r. A',II'rnl '. 51'1' 5 ii)
Depth of yItyr111
dnr,un k ?,I'll p -,Mil/ Sa1ND-
o- 20 of belr.een levee
0' L,RAVEL-
iwel ant bedroll. and
d;rrnand
wattUhl.1 2- 7I) n
run •lull
pepth of snbyupysn 2 0.
A 0 n tlehsren Invptt !t'.nl
and IuozOak. a'cf .4n;ra
ladle > 2.(1 rn
00111, Of S. LY,MOIl
s 80 m oets•,ne, molt
n,'nl Intl :1,101k. ,:r,d
watt! lal,le : 2.D it,
10 4 VV c i':.
DI'pe4 ul ,:>IAulun ti
Ii/ivalih 5 :t-
80 f'1 Wt6t.tn Inve+ I lwtl
or SAND. or
and bedtc<i
Ot:AAL-Ft-
O)c,mated
_
Oeplhl of s1L•sutwr.
materla0
'-80 ru naiioo-1 runt
jal and itedlu:k
3.1 4 PV q 120
(A'pll, of p Wal:ctw I
(uraalir S -1!
3.0 it, tx'Iween 'omit reel
CLAY- Or CLAY.
and Gyro'.'
rl:roruiltri
rlate'IaU
Deplt ut Sbl•15uLsu,I
cu 30 ri behrnen mvesl
lvrland bedrntk
Aktrlpme d,rnesEr %w.I
Up.p,aJ•ant driest t wet
Knt't•+Iltor
tale 0' forwno'e
Wrdercoarehb ear
Oro dian of oreinape Jtch
Ad)etenl trd.,ptant end pnc,L,nui a•ra, p;d J:nlg Htet Ir
It rrrabQn 'Yea
01 -s'te dmilny kudse
t, nnhnmr7d%wilvi)IwOiO
(0
Of
40
30
45
30
40
30
IS
50
10
10
10
7 (it wittn'iti
I0 Sine water
sit fare eu,' )rastrd
wev;nd)
Iff (nfiti l,tsr!
Ireatrcal areas
i tWu1 pllgd
25 If -En kale!
$nrfate wynirJcled
ftn t)
1C b-f1nalont
SI, aace ,1•a:er loom
hand 6
Vraic brw'sha:l 0
Peas 3
5th- Irn.rtdary 2
11r'•I[:utr' It. hart t.MvcAr Y,PA Sve rortr
FS'. percdatlnn ,'a;.ue.
Ito- yea, 0.v,'> InI y,iJtc sale+ rl•air v)e •Milli hi' :totted rle,on. I- ,ulna d itr
IrivaliunlacaVn,•d died it d ruu'd J,o fun crowed Owl rth 11,1mitc. is .'ualr6dncd floe,
ne(tl be. erg stone waledlcyosal areas Cf 001 a,says.
Irk i001s rrkry !owl loll ps det!ul:n:f 1',, tanopd sptearl wdcatrs per:r-d root
(0:0 0(0
The dOlarcei req.dre!I (Info -b a, 11.*. ,,room ryc of (l, se:.twe ]hcelni. adec.
sbsdrl by nought !rani IFa Icoal auOIwily anri'or Iran Itr.• ho- Drpodrnrra ;>! kcu,6A,
Local Gu+eino er'. and llerda9k, ipecdlrafy she Iva:,naa` Mowrk,1t, SeyvYe a14 the
ht,luO,al Farts or. VtM if, Snfi:e
Table 6.2 EPA CoP 2021: Minimum separation distances
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel,ie
Page: 10
Tricel Site Recommendation Report
Tricel Novo Package Plant. and Pumped Soil Polishing filter (Percolation Area) Ti�ICEL
Table 10.1: Infiltration/treatment area and trench length design for tertiary treatment, per PE
Area
Trench 1
Trench length
Area
Area
required per
length
required per
required
required
person (m2)
required per
person (m)
per person
per person
person (m)
(m2)
(m2)
3 ≤ PV s 20
≥7.5
≥6
≥6
≥5
≥3.75
21 < PV ≤ 40
≥15
≥12
≥12
≥14
≥7.5
41 < PV ≤ 50
≥30
≥17
≥17
≥16
≥15
51 < PV ≤ 75
≥50
≥19
≥19
≥22
≥25
76 < PV ≤ 90
-
-
≥28
≥34
-
91 <PV≤120
-
-
-
≥54
-
Table 10.1 from EPA CoP 2021 - Loading rates for the soil polishing filter
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 11
Tricel Site Recommendation Report 4%
Tricel Novo Package Plant. and Pumped Soil Polishing filter (Percolation Area) TRICEL
Table 7.3: Requlreirierits of a percolaton trench (gravity fend)
fEIlfHIEqfl
Slope of pipe from tank to 1 in 40 for earthenware or concrete,
distribution device tin 6(1 for uPV(
Slope of percolation trench from 1 in 200
distribution device
Length of percolation pipe in each 18 m maximum
trench
Minimum separation distance
between percolation trenches
Diameter of pipe from septic tank
to distribution device
Percolation pipes,
lrvidth of percola lion trench
Depth of percolation trench
Depth of unsaturated soil and/or
subsoil beneath percolation trench
and above the bedrock and the
water table
Backfilling of percolation trench
(see Figure 7.1)
(ieotextile
2 m (2,5 in centre to centre)
100-110 mm
100 mm here, perforated (typically at 4, 6 and
8 o'clock) smooth wall PVC drainage pipes with
perforations of 8 mm diameter at about 75 mm
centres along the pipe or pipes with similar
hydraulic properties,
Maximum of six pipes per distribution device
500 nini
Ideally, about 850mm-' below ground surface
depending on site (as per Figures 7.1 and 7,3)
Minimum 1.2 at for GWPRs of RI or R2'. f,Airtinatum
2 0 m for GWPRs of R2', R2', R2`, R3' or R3'
300 min of 12.32. mm washed gravel or broken
stone aggregate on invert; pipe laid at a 1 in 200
slope surrounded by 12-32 mm clean washed
gravel or broken stone aggregate and with 150
1 mm of similar aggregate over pipe; geotextlle layer
followed by topsol to ground surface
cieotexnle should be in accordance with EN ISf)
1031)
Accesslinspection points and vents these are recommended for the ends of the
percolalion pipes The covers should be vsible and
installed to prevent entry of water. They may also
be used for rodding or scouring purposes
a Before installation the holes in the percolation p.pe should be inspected to check that
they are the correct size and free from debris.
b The percolation pipes may be located at a shallower depth, provided that a minimum
of 450 mm of material is placed above the pipes to provide the required protection
against damage from above.
Table 7.3 EPA CoP 2021: Construction of percolation trenches. For secondary treated waste water, the maximum
length of percolation pipe in each trench should be l Om as outlined in section 10.1.1 option 3
Terms and conditions:
Tricel cannot accept responsibility for incorrect site details or calculations as these are based on user inputs
which are outside of Tricel control.
Full terms of website use are available at www.tricelsiteassessor ie /TermsOfwebsiteUse
***Domestic WwTP catering for over 10 Population Equivalent that are discharging to TERO Tertiary
'l'reatment modules may require a pump station
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 12
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TRICEL
` � lid , o �` 1
I
J L� L —1-�I L i I_L�
I
i
J
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 13