Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2560386 - F.I. Received Doc. - Photo Montage
Ball Wall - 3D Views and Sections RECEIVED: 19/05/2026 +112.8 ROAD +107.5 GL House 3House 2 House 1 +115.7 TOW RECEIVED: 19/05/2026 View - House 1 RECEIVED: 19/05/2026 +109.1 GL +116.0 TOB +110.8 GL +126.5 +124.5 (15m TOF) +131.1 (22m) GENERATOR ROOM EXISTING TRAINING PITCH CASTLEBLAYNEY COLLEGE RECEIVED: 19/05/2026 +110.2 +215.2 (5m TOW) +116.0 TOB RECEIVED: 19/05/2026 RECEIVED: 19/05/2026 Section +114.4 +110.2 +215.2 (5m TOW) +109.1 GL +124.5 (15m TOF) +131.1 (22m) GENERATOR ROOM SLOPE 1:2 +116.0 TOB SLOPE 1:4 RECEIVED: 19/05/2026