Loading...
HomeMy WebLinkAbout2660122 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT To Donna McEvoy From: John Ryan, Environment Section Ref: 26/60122 Michael and Maragaret Wallace Doagheys, Glaslough, Co.Monaghan Agent: Christopher Gray, Gray Construction and Design Ltd …permission for a development which will consist of the demolition of the existing two-storey dwelling and associated outbuildings, and the construction of 1 no. two-storey replacement dwelling and detached domestic garage, together with improvements to the existing site entrance and all associated site development works. The site is located within the Mountain Water_60 waterbody which has been classified as Poor Status, 2019-2024 with an objective of Good Status by 2027. The site is located on an area of Extreme vulnerability which is underlain by a regionally important karstified acquifer. Demolition of two existing structures on site is proposed, the existing dwelling house and the existing outbuildings. Planning does not include proposal to import fill material. Removal of approximately 170m of existing hedgegrows along the R185 roadside is proposed for line of sight. The following to prior to commencement conditions are required: 1. A Construction & Environmental Management plan which must take into consideration Construction and Demolition proposals and By-Products management using “Best Practice Guidelines for the preparation of resource & waste management plans for construction & demolition projects’- EPA 2021, must be in place prior to commencement. 2. Prior to commencement an asbestos survey for the existing first floor to be demolished and specific measures should be outlined in the CEMP in regard to asbestos removal/disposal by an authorised contractor to an authorised facility. 3. Prior to commencement a water protection plan checklist must be completed. 4. Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. 5. If infilling material is required to be imported onsite the applicant or economic operator shall: a. Utilise EPA By-Product Regulation 27 in moving soil infill material from one site to another. Official correspondence demonstrating Article 27 Registration with the EPA shall be submitted to the Planning Authority prior to commencement of development. i. or b. If using waste material as infill and prior to acceptance of material a valid permit must be issued by Monaghan County Council in accordance with the Waste Management (Facility Permit and Registration) Regulations 2007 as amended. i. or c. Buy topsoil material as a product for final landscaping purposes only. Documentation demonstrating purchase shall be submitted to Planning Authority. 6. Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act 1996 as amended. 7. The applicant shall ensure that adequate measures are in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any watercourse or drains. These measures shall take account of the Guidance produced by Inland Fisheries Ireland titled “Requirements for the Protection of Fisheries Habitat during Construction and Development Works at River Sites”. This document is available to download at https://www.fisheriesireland.ie/documents/624-guidelines-on- protection-of-fisheries-during-construction-works-in-and-adjacent-to-waters/file.html. 8. The applicant shall ensure completely separate foul and surface water drainage systems are in place. 9. Any fuels, oils, greases, hazardous liquid wastes and hydraulic fluids within the site area shall be stored on site, away from any watercourses in a bunded, leak-proof, and lockable storage area. Note that bunds are to be designed to contain 110% of the capacity of the largest storage container located within the bund. There shall be no overflow drain facility from any bunds on site and all filling and off-take points shall be located within a bund. 10. Applicant/developer is required to take all necessary precautions to prevent any risk of flooding or pollution occurring to roadways and adjoining properties/lands during all construction works/site works associated with this development/site and on completion of all works. Prepared By : John Ryan Environmental Technician DATE: 11/05/2026 Approved : Donna McEvoy Date: 11/05/2026