HomeMy WebLinkAbout2660115 - F.I. Received Doc. - Water Protection ChecklistMONAGHAN LOCAL AUTHORITIES
Water Protection Plan Checklist
(To be accompanied by a Site Drainage Plan - Refer to Chapter 4 of Monaghan County
Development Plan 2013-2019)
General Site and Water Body Details
Planning Ref. No. Applicant St Macartans Diocesan Trust
Townland Onomy Water Supply Source None
X Co-ordinate 1 283080 Y Co-ordinate 1 319160
WMU 2 IE_NB_Fane/GBNIIENB RWB 2 UKGBNI1NB060608229
WB Status 2 Poor Objective 2 Good
Groundwater
Vulnerability 3
High to Low Aquifer Importance 3 Poorly productive
bedrock
Proximity to nearest watercourse (culverted or open), wetland or lake
(meters)
Lough Muckno, 150m.
Proposed Development
Is the development entirely or part of one of the following? (tick)
Domestic dwelling Agricultural
(cattle/dairy)
Industrial-food related
Public Works Agricultural
(mushrooms)
Industrial-non food
Housing Agricultural (poultry) Quarrying/extractive
industries
Institutional Agricultural (piggery) Transport related
Commercial/Retail Other agricultural –
specify below
Filling station/Fuel depot
Mixed Use
Development
Other X
Waste Water Production and Treatment Method
Domestic type waste waters N/A
Waste waters produced from any trade,
food, preparation or business 4
N/A
Wheel wash, vehicle wash, cooling waters N/A
Waste waters produced from quarrying etc
4
N/A
Other waste waters 4 Only clean surface water
Construction phase waste waters Construction Stage W/C – refer to C&D WM Plan
Frequently asked questions for septic tanks may assist in the “fit for purpose” assessment refer
to http://www.monaghan.ie/en/services/environment/water/waterawareness/faqforseptictanks/
Fuel or Outdoor Material Storage for Non Domestic Developments
Number of fuel storage tanks existing or proposed on site? None
Are fuel storage tanks bunded 5? N/A
Detail liquid / feedstuffs / organic / chemical / waste oil
storage on outdoor sites
None
Hard Surface and Open Yard Areas for Non Domestic Developments
Footprint of proposed development including yard areas in m2 9,500m2
Is there potential for soiled yard areas from material, product waste
or manure handling, fuel dispensing, silt and soil, yard washing etc.
No
If yes, are silt trap(s), interceptor(s), soiled water tanks or other
control measures shown on drainage plan?
N/A
Has the use of SUDS (Sustainable Urban Drainage Systems –
http://www.susdrain.org ) been considered in the design of this
development?
Yes
Development History – All Developments RECEIVED: 22/05/2026
Have previous pollution prevention planning conditions been complied with 6? N/A
Does existing development have an up to date (as constructed) site drainage
plan?
N/A
Is the existing/proposed development sewered or unsewered? N/A
If unsewered, is the existing wastewater treatment system fit for purpose 7? N/A
Has the storm water drainage system been examined and/or surveyed for
misconnections? (Information leaflet available from Environment Section)
N/A
Checklist of items to be included on Site Drainage Plan
Location of lakes, watercourse, wells used for water supply, or karst features on or
within 25m of domestic or 100m of non domestic development site
None
known
Location of all drainage outfall points See Dwg
Foul water drainage system (in Red) N/A
Storm water drainage system (in Blue) See Dwg
Soiled yard area, soiled water drainage and management system, including silt
traps, oil interceptor(s) and any SUDS facilities
N/A
Location of waste water treatment facilities N/A
Location of fuel storage tank(s) N/A
Stream/Lake/Wetland/Riparian Corridors N/A
Footnotes and Useful Information
1 Projection in the Irish Grid
2 WMU, RWB, WB status. Objectives available on water maps at www.wfdireland.ie
3 Available in the public mapping section at www.gsi.ie
4 For information leaflets on Business Premises and Proper Use of Drains and information on
discharge licensing see:
http://www.monaghan.ie/contentv3/services/environment/formsguidesdocumentsdownlands/
http://www.monaghan.ie/contentv3/services/environemtn/water/waterawareness/leaftletsandguidelines/
5 Guidance: www.envirocentre.ie Best practice for Oil Storage (BPGCS05)
6 Has certification of installation for previously granted wastewater treatment system been
required and if so has it been submitted.
7 Refer to EPA Guidance at:
http://www.monaghan.ie/contentv3/services/environment/water/waterawareness/faqforseptictanks/ and
http://www.monaghan.ie/contentv3/media/monaghanie/content/files/pdf/environment/Water
Pollution&DrainageSystems.pdf
8 Refer to Water Body, Sensitive Waters and Sensitive Land Maps in Chapter 4 of the
Monaghan County Development Plan 2013-2019
Abbreviations
WMU Water Management Unit
RWB River Water Body
WB Status Water Body Status
IPPC Integrated Pollution Prevention Control Licence
EIA Environmental Impact Assessment
For Office Use: Sensitivity of Location
Is the development located upstream of a high river quality site 8?
Is the development located within a good status waterbody 8?
Is the development located in the catchment of a water supply source 8?
Is the development located within the Source Protection Zone (SPZ) of a groundwater
supply source 8?
Does the development require a discharge licence to surface or ground waters under the
Water Pollution Acts?
Risk to waters in relation to scale of development, previous planning/environmental history,
IPPC or EIA aspects, site management and location in a sensitive area
Applicant:_St Macartans Diocesan Trust
Agent:____Alan Clarke & Associates Date_20th March 2026_ RECEIVED: 22/05/2026