Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2641 - Site Assessment Report
Soil Characterisation & Site Suitability Assessment Report FOR Aine Mc Quaid At Coolnacarte Td., Scotshouse, Co. Monaghan ILANNIjIjT NO iTCVII.IV`T 11°26/41 MONAGHAN CO. COUNCIL 2 2 MAY 2026 SITE CHARACTERISATION FORM COMPLETING THE FORM Note: This form requires the latest version of Adobe Acrobat Reader and on PC's Windows 7 or later. Windows XP produces errors in calculations Step 1: Go to Menu Item File, Save As and save the file under a reference relating to the client or the planning application reference if available. Use the Clear Form button to clear all information fields Notes All calculations in this form are automatic. Where possible information is presented in the form of drop -down selection lists to eliminate potential errors. Variable elements are recorded by tick boxes. In all cases only one tick box should be activated. All time record fields must be entered in twenty -four-hour format as follows: HH:MM All date formats are DD-MM-YYYY. All other data fields are in text entry format This form can be printed out fully populated for submission with related documents and for your files. It can also be submitted by email. )ection 3.2 In this section use an underline across all six columns to indicate the depth at which changes in classification / characteristics occur. Section 3.4 Lists supporting documentation required. Section 4 Select the treatment systems suitable for this site and the discharge route. Section 5 Indicate the system type that it is proposed to install. Section 6 Provide details, as required, on the proposed treatment system. APPENDIX A: SITE CHARACTERISATION FORM File Reference: N / A Prefix: L First Name: Aine Surname: Mc Quaid Address: Site Location and Townland: Coolnacarte, Scotshouse, Co. Monaghan Number of Bedrooms: 4 Maximum Number of Residents: Comments on population equivalent Max no. of residents 6 Proposed Water Supply: Mains Private Well/Borehole N/A Group Well/Borehole ❑ Soil Type, (Specify Type): TLPSsS Sandstone & Shale Till (Lower Paleozoic) Paleozoic Carboniferous Mississippian Bedrock Type: Aquifer Category: P1 Regionally Important Locally Important Poor Vulnerability: Extreme ❑ High ❑ Moderate Low ❑ Groundwater Body: Good Name of Public/Group Scheme Water Supply within 1 km Source Protection Area: ZOC ❑ SI ss So ❑ Presence of Significant Sites (Archaeological, Natural & Historical): Past experience in the area: Comments: None Noted Status Unknown None Groundwater Protection Response: R1 Previous tests in this area have passed (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, and/or any potential site restrictions R1 — Acceptable subject to normal good practice. Site may be suitable for discharge to the ground if the minimum depths are met on the site and percolation rates are good. Soil type in the area are generally acid brown earths (Min 75%) and stated as locally important, Groundwater will be most at risk. Separation from any shallow or deep wells in the vicinity will have to be maintained. From initial desktop study, a conventional septic tank and sub soil percolation area may be acceptable if the percolation rates and other site results are acceptable. Note: Only information available at the desk study stage should be used in this section 3.1 Visual Assessment Landscape Position: Gently Sloping Slope: Steep (>1:5) ❑ Shallow (1.5-1.20) Relatively Flat (<1:20) ❑ No Dwellings within 100m Of PPA Land Use: Farmland Vegetation Indicators: Site is well grazed. Groundwater Flow Direction: Ground Condition: South Ground conditions are firm and dry throughout the site Site Boundaries: Mature boundariesTo Entire Site 3.1 Visual Assessment (contd.) Roads: Secondary Road > 120m Downhill from PPA Outcrops (Bedrock And / Or Subsoil): None Noted Water Ponding: None Noted L;akr None Noted Beaches/Shellfish Areas: None in close proximity of PPA VVeti,Hl i' None Noted Karst Features: None Noted Watercourses/Streams: None Noted Drainage Ditches:* None Noted Springs:* Mains water supply already on site Vyolls- See above Comments: ntegrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, the suitability of the site to treat the wastewater and .le location of the proposed system within the site). The site is generous and will meet all the required separation distances should the physical site test results be deemed favourable *Note and record water level 3.2 Trial Hole (should be a minimum of 2,1m deep (3m for regionally important aquifers)) To avoid any accidental damage, a trial hole assessment or percolation tests should not be undertaken in areas which are at or adjacent to significant sites, (e.g. NHAs, SACs, SPAs, and / or Archaeological etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. Depth of trails hole (m): 2.1m Depth from ground surface Depth from ground surface to to bedrock (m) (if present) None Encountered water table (m) (if present): 1900mm BGL Depth of water ingress: None Noted Rock type (if present): N / A 1 Date and time of excavation: 02.05.2026 4.00pm Date & Time Of Examination: 05.05.2026 9.00am Depth of Surface and Subsurface Soil/Subsoil Percolation Texture & Plasticity and Soil Density/ Preferential Tests Classification dilatancy*** Structure Compactness Colour**** flowpaths 0.1 m n.2 m 3m 0.4 m 0.5 m 0.6 m 0.7 m 0.8 m 0.9 m 1.0 m 1.1 m 1.2m 1.3 m 1.4 m 1.5 m 1.6 m 1.7 m 1.8m 1.9 m 0m .1 m 2.2 m 2.3 m 2.4 m 2.5 m 2.6 m 2.7 m 2.8 m 2.9m 3.0 m 3.1 m 3.2 m 3.3 m 3.4 m 3.5 m Clay / gravel fines No Water at time of inspection Winter WTL Assumed At 1.7m BGL Depth Of Excavation 2.1mTo Base Of Trial Hole Ribbons80, 70, 70 3,3,4 Threads Dilatent Loose Loose Medium Uncompact Grey Grey Yes None Boulder clay / cobble mix <sn Likely Subsurface Percolation Value: Min/ 25mm Likely Surface Percolation Value: Note: *Depth of percolation test holes should be indicated on log above. ('Enter Surface or Subsurface at depths as appropriate). ** See Appendix E for BS 5930 classification 3 samples to be tested for each horizon and results should be entered above for each horizon All sings of mottling should be recorded. 3.2 Trial Hole (contd.) I valuation: Water present @ 1.7m in trial pit . Excavated material was loose and uncompacted. See attached photos 3.3(a) Subsurface Percolation Test for Subsoil Step 1: Test Hole Preparation 2 Percolation Test Hole a f r Depth from ground surface 150 150 150 to top of hole (mm) (A) 550 550 550 Depth from ground surface to base of hole (mm) (B) 400 400 400 Depth osi nshoeof holemm) (B A) Dimensions hole 300 x 300 300 x 300 300 x 300 [length x breadth (mm)] Step 2: i're-Soaking Test Holes 're -soak start Date Already Saturated Already Saturated Already Saturated Time 9.00am 9.00am 9.00am Step 3: Measuring T,00 Percolation Test Hole No. t r 1� Date of test 05.05.26 05.05.26 05.05.26 Time filled to 400 mm Time water level at 300 mm Time (mins) to drop 100 mm (Tioo) I Average Tioo (mins) 09:00 09:03 09:09 10:32 10:46 10:17 92 103 68 87.67 If Tioo> 480 minutes, then Subsurface Percolation value > 120 — site unsuitable for discharge to ground If Tioo ≤ 210 minutes, then go to Step 4; If Twoo> 210 minutes, then go to Step 5; Step 4: Standard Method (where T,00 ≤ 210 minutes) Percolation 1 2 3 Test Hole Fil no. Start Finish At (min) Start Finish Ot (min) Start Finish At (min) Time Time (at Time Time (at Time Time (at 300 (at 200 mm) 300 (at 200 mm) 300 (at 200 mm) mm) mm) mm) 1 09:00 10:32 92 09:03 10:46 103 09:09 10:17 68 2 10:00 11:07 67 10:10 11:18 68 10:15 11:22 67 3 11:10 12:15 65 11:25 12:40 75 11:30 12:45 75 Average At Value 74.67 82.00 16:10 70.00 Average Lt/4 = Average At/4 = Average L\t/4 = [Hole No. 1] 18.67 [Hole No. 1] 20.50 [Hole No. 1] 17.50 Result of Test: Subsurface Percolation Value =I 18.891(min/25 mm) .omments: Percolation T Test Using Step 4. Results Acceptable at 18.89 min / 25mm Step 5: Modified Method (where Tioo> 210 minutes) Percolation Test Hole No. 1 Fall of waterin hole (mm) Time Factor Tf Start Time hh:mm Finish Time hh:mm Time of fall (mins) = Kts=Tf/ Tm T -Value =4.45/ Kts 300-250 250-200 200-150 8.1 00:00 0 9.7 00:00 0 11.9 00:00 0 150.100 14.1 00:00 0 Average IT -Value T -Value Hole 1=(T________ Percolation Test Hole No. 3 Fall of Time Start Finish Time of Kts=Tf/ T -Value water in Factor Time Time fall Tm =4.45/ hole (mm) Tf hh:mm hh:mm (mins) = Kts Tm 300-250 8.1 0 250-200 9.7 0 200- 150 11.9 0 150-100 14.1 0 Average IT -Value T-ValueHole1=(T1) Percolati on Test 2 Hole No. Fall of Time Start Finish Time of Kts=Tf/ T -Value waterin Factor Time Time fall Tm =4.45/ hole Tf hh:mm hh:mm (mins) = Kts 300-250 8.1 0 250.200 9.7 0 200-150 11.9 0 150-100 14.1 0 Average IT -Value T-ValueHole l=(T] Result of Test: Subsurface Perolation Value (min/25mm) Comments: 3.3(b) Surface Percolation Test for Soil Step 1: Test Hole Preparation Percolation Test Hole Depth from ground surface to top of hole (mm) (A) Depth from ground surface to base of hole (mm) (B) Depth of hole (mm) (B -A) Dimensions of hole (length x breadth (mm)] 400 400 400 300 x 300 300 x 300 300 x 300 300x300 300x300 300x300 Step 2: Pre -Soaking Test Holes Pre-soak start Date Already Saturated Timm 9:00 Step 3: Measuring Two Percolation Test Hole No. Date of test Time filled to 400 mm Time water level at 300 mm Time (mins) to drop 100 mm (Two) Average Tioo Already Saturated 9:00 Already Saturated 9:00 05.05.26 05.05.26 05.05.26 09:10 09:11 09:13 10:33 10:48 10:45 83 97 92 90.67 If Too > 480 minutes, then Subsurface Percolation value > 90 — site unsuitable for discharge to ground If Tioo ≤ 210 minutes, then go to Step 4; If Two> 210 minutes, then go to Step 5; Step 4: Standard Method (where Tioo ≤ 210 minutes) Percolation Test Hole 1 2 3 Fil no. Start Finish Lt (min) Time Start Finish At (min) Time Start Finish At (min) Time Time (at 300 (at 200 Time (at 300 (at 200 Time (at 300 (at 200 mm) mm) mm) mm) mm) mm) 1 09:10 10:33 83 09:11 10:48 97 09:13 10:45 92 2 10:36 11:59 83 10:52 12:26 94 10:50 12:31 101 3 12:03 13:23 80 12:30 14:17 107 12:35 14:18 103 Average At Value 2 82.00 99.33 98.67 Average At/4: [Hole Average At/4 = [Hole Average At/4 = [Hole No. 1] 20.50 No. 1] 24.83 No. 1] 24.67 Result of Test: Subsurface Percolation Value = Comments: 23.331(min/25 mm) Average Percolation Rate Of Topsoil Material Is 23.33 min which is within acceptable range Step 5: Modified Method (where Two> 210 minutes) Percolation Test Hole No. 1 Fall of water Time Start Time Finish Time of Kts=Tf/ T - Value in hole (mm) Factor = hh:mm Time fall (miss) Tm 4.45 / Kts If hh:mm =Tm 300-250 8.1 u 250-200 9.7 0 200-150 11.9 0 150-100 14.1 0 Average Percolation Test Hole No. T - Value T - Value Hole 1= lii 3 Fall of water in hole (mm) Time Factor = If Start Time hh:mm Finish Time hh:mm Time of fall (mins) =lm Kts=Tf/ Tm T - Value = 4.45 / Ku 300-250 8.1 0 250-200 9.7 0 200-150 11.9 0 150-100 14.1 0 Average T - Value T - Value Hole 1= 0 Percolatlo n Test 2 Hole No. Fall of Time Start Time Finish Time of Ku=Ts/ T - Value water in Factor hh:mm Time fall (mins) Tm =4.45/ hole (mm) Ti hh:mm =Tm Kts 300.250 8.1 0 250-200 9.7 0 200-150 11.9 0 150-100 14.1 0 Average T - Value T - Value Hole 1= Result of Test: Subsurface Perolation Value = (mln/25mm) Comments: 3.4 The following associated Maps, Drawings and Photographs should be appended to this site characterisation form. 1. Discovery Series 1:50,000 IVlap indicating overall drainage, groundwater flow direction and housing density in the area. 2. Supporting maps for vulnerability, aquifer classification, soil, subsoil, bedrock. 3. North point should always be included. 4. (a) Scaled sketch of site showing measurements to Trial Hole location and (b) Percolation Test Hole locations, (c) wells and (d) direction of groundwater flow (if known), (e) proposed house (incl. distances from boundaries) (f) adjacent houses, (g) watercourses, (h) significant sites (i) and other relevant features. 5. Site specific cross sectional drawing of the site and the proposed layout' should be submitted. 6. Photographs of the trial hole, test holes and site including landmarks (date and time referenced). 7. Pumped design must be designed by a Suitably qualified person. calculated percolation area or polishing filter area should be set out accurately on the site layout drawing in accordance with the code of practice's requirements. yir Integrate the information from the desk study and on -site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Slope of proposed infiltration / treatment area: Are all minimum separation distances met? Depth of unsaturated soil and/or subsoil beneath invert of gravel (or drip tubing in the case of drip dispersal system) Percolation test result: Not Suitable for Development Surface: 23.33 Identify all suitable options 1. Septic tank system (septic tank and Percolation area) (Chapter 7) 2. Secondary Treatment System (Chapter 8 and 9) and soil polishing filter (Section 10.1) 3. Tertiary Treatment System and Infiltration / Treatment area (Section 10.2) 'ropose to install: and discharge to: No Yes Yes 1:200 1200 Sub -surface: 18.89 Suitable for Development Discharge Route 1 Groundwater Via Irrigation Trenches (Slightly Mounded) 4 no. x 18.0m long Recommend to install an O' Reilly Oakstown BAF EN Treatment System or similar EN Certified System and Sub Soil Percolation Area In Accordance With EPA Guidelines Groundwater Invert level of the trench/bed gravel or drip tubing (m) 1200mm Above Winter Water Table Recommended Site specific Conditions (e.g., special works, site improvement works testing etc. The tests indicated a T value Rating of 18.89 indicating below average percolation characteristics of the subsoil. A P value rating of 23.33 was also obtained indicating good percolation characteristics of the topsoil layer. Groundwater was not encountered in the trial pit nor was bedrock encountered. A small amount of water was in the trial pit which was associated with preceding overnight rains Given the assumed winter water table of 1.7m BGL, the invert of the percolation trenches should be no lower than 500mm BGL ' A discharge of sewage effluent to "waters" (definition includes any or any part of any river, stream, lake, canal, reservoir, aquifer, pond, watercourse or other inland waters, whether natural or artificial) will require a licence under the Water Pollution Acts 1977-90. Refer to Section 2.4. System Type: Septic Tank Systems (Chapter 7) Tank Capacity (m3): 6.73 Percolation Area No. of Trenches Length of Trenches (m) Invert Level (m) Mounded Percolation Area No. of Trenches Length of Trenches (m) Invert Level (m) 4.0 18.0m 0.4 BGL System Type: Secondary Treatment System (Chapters 8 and 9) polishing filter (Section 10.1) Secondary Treatment Systems receiving septic tank effluent (Chapter 8) Media Type Area (m2)* Depth of Filter Invert Level Sand/Soil Click or tap Click or tap Click or tap Soil Click or tap FClickortap Click or tap Constructed Wetland Click or tale Click or tap Click or tap Packaged Secondary Treatment Systems Receiving raw wastewater (Chapter 9) Type Oakstown BAF Capacity PE PE 6 Min Sizing of Primary Compartment Other Click or tap Click or tap Click or tap 3.5 m3 m3 Polishing Filter*: (Section 10.1) Surface Area (1112) Option 1 — Direct Discharge Surface area (m2) )ption 2 — Pumped Discharge Surface area (m2) 108 m2 [Click or tap Click or tap Option 3 — Gravity Discharge Trench Length (m) Option 4 — Low Pressure Pipe Distribution Trench length (m) Option 5 — Drip Dispersal Surface area (m2) 18.0m Click or tap Click or tap SYSTEM TYPE: Tertiary Treatment System and infiltration / treatment area (Section 10.2) Identify purpose of tertiary Provide performance information Provide design information treatment demonstrating system will provide required treatment levels Click or tap here to enter text. DISCHARGE ROUTE: Click or tap here to enter text. Click or tap here to enter text. Groundwater Hydraulic Loading Rate * (I/m2.d) 30 Surface area (m2) 30 Surface Water ** o Discharge Rate (m3/hr) 0.04 *Hydraulic loading rate is determined by the percolation rate of subsoil **Water Pollution Act discharge licence required ALITY ASSURANCE: Installation & Commissioning System and percolation area shall be signed off by a suitably qualified engineer with adequate PI Insurance. All recommendations within this report to be adhered to. Guidance within the revised EPA 2001 report published on 7.7.2021 to be observed. On -going Maintenance System installation to be certified by manufacturers representative on completion. Maintenance contract to be agreed for annual inspection to ensure the system is functioning properly. Bi Annual desludging to take place. Company: I Encore Consulting Prefix: Mr f=irst Name: Joe Surname: Beggan Address: Killygrallen, Ballinode, Co. Monaghan Qualifications/Experience: Bsc (Hons) Eng., A. Eng., MIEI, MCIOB, CABE, SCSI EPA / GSI Certified Date of Report: r5.2026 Phone: 087-2924047 Indemnity Insurance Number: AP 10003266 Signature:............................................................................. E-mail jgbeggan@gmail.com OUTLINE SPEC'IFICATIO S FOR SOIL POLISHING FILTER 1, Treated effluent from the mechanical aeration sump unit shall he pumped intermittently or fed by gravity, to the distribution chamber in the percolation area, 2. The slope of the percolation trench from the distribution chamber shall be 1 in 200 3. The length of each of the 5 percolation trenches shall be loin. Total length Som. 4. The separation distance between the percolation trenches shall be 2su (ie 2.5m centre to centre) 5. Percolation pipes shall be 100mm diameter smooth wall uPVC sewer pipes, perforated at 4, 6 and 8 o'clock. Perforations shall be 8mm diameter, at 75mm centre's along the pipe. Holes shall be checked before installation to ensure they are free from debris, G. The width of each percolation trench shall he 500mm. 7. The depth of each percolation trench shall be 600tum below the ground surface. 8. Percolation pipes shall be laid on a 250min bed of washed gravel, having particles in the range of 8 - 32mm. 9. Pipe surround shall be washed gravel, having particle size in the range 8 - 32mm. 10. Pipe cover shall be 150mm depth cif washed gravel, having particle size in the range of 8 - 32mm. 11. Geotextile layer to be placed on top of this followed by 100min topsoil to ground level. 12. Geotextile shall be in accordance with EN ISO 10319. Access / inspection points and vents shall be provided for the ends of the percolation pipes. Covers shall be visible and installed to prevent the ingress of water. They shall be suitable for rodding and scouring purposes. 13. A surface land drain shall be employed upslope from the percolation soil polishing filter and not closer than 2m to divert surface water away from it. 14. Care must be taken to ensure that the minimum distance is maintained between the new well proposed for the site and the percolation area and also the percolation area at the family home (see note on minimum distances). SCHEDULE OF SITE SEPARATION DISTANCES CUES PACKAGE TREATMENT SYSTEM ,'klinimum distance to any dwelling ='ln Minimum distance to site boundaary= 3m . Minimum distance to trees = 3m , _Minimum distance to roads = -Im .Minimum distance to slope breaks = ltlun ,Minimum distance to watercourse I streams = lOm Minimum distance to soakaway = 10in Minimum distance to open drain = lOm Minimum distance to lake or foreshore = w0m able 6.3 EPA Code of Practice 2021 POLISHING FILTER , Minimum distance to andwelling = 10m , Minimum distance to site boundary = 3m Minimum distance to trees = 3m • Minimum distance to roads = -Im. • Minimum distance to slope breaks = 10m ,Minimum distance to water course stream =10in • _Minimum distance to soakawav = lOm .Minimum distance to open drain = 10m • Minimum distance to lake or foreshore = :�0m • Minimum distance to up gradient well =15*m . Minimum distance to down gradient well = 40m (Table 6.3 EPA Code of Practice 2021 unless,, stared othervike) TOPSOIL 100A►IM GEOTEXTIL! LATE. 10MM WASHED STONE ABOVE E PIPE O 1d4]i .l PL 2 0MMM WASHED STOVE BELOW PIPE INVERT ('F TREY',::_ U,BSoLL ML' 0.M.1 I \later table EA( H TRENCH -ODXBf W DE SECTION THRGUC H SUBSOIL PERCOLATION SYSTEM .� ..- .V 1� U V U U V H T L f- �1yy- 4 U y� o nl •o n�Y. Y C 'x w u Y o u u iti hl Yo 4 li: V � N H V4' •V u C .. rf1 .G V � �' Y v4 o V nOj J `��- HI U = � n1 11 U v� > v a� Cp ,! E F i> t�q u l V O >. c . w " 10 a Sew 1 ? (3 � �V � 'U ?. ]. r. c{•� QG avi V 1 C \ i ry7 ..�.K fY in . O N U X V CK .�i V X �' V o N U' V ' -V I j7C IY c L^w . a f1•it ' py 1■ �I 8I ■ ■ ■ ■ ■ ■ Li I 'N 1 "- - E G C >- 0 z 0 U w w J z N N W z w W z w m J J W z w z 0 m z W w H N 0 /) ® O 4 Fl G1 Pr "'-C sn v S - O 2 C 7 H. U1 U H 'v cCo 05 a v x a, o .r 0_I 0 00 w O d w u~i 3 a a m a a v u o u a V V 0 N 0 _a) fC a a) 0 J f0 4'' V► f6 s .O C vm 0 C C CD U IM Vi C a Q H U n m u 7 1 O Y v 'r >. o u v zS & W ,CI ya V1 fj � y� tW, C O t7 .C C4 n O :e C tyo L L] 1`. E I'l n O• T ,t-. A N O w q e1 to J 4 a E I I ro •c v Z• stn .k A. a . >< 1 I •U,' o `vti o x E• c . c« a g o o E7 BU o w a b , a 'ni to 1 Y o o `71 .e c c toil p' c l7 l7 tT o 'O b i Cl SI P v '2 # E E d `o c c •c p o q p '00 'c to rn rn v p V l7 0 m y u e U �° 44 U O c v C E `O �1 .!U' �i �1 — '� c'N z _O w O •o U i.f'1 ave.0 Q oQ CyJ.� Q) 1 I 1 y A a CQ a Ly. O Q pq qQ�1 U C N C E O vc 41)+'o a' zp c O v (7 VQ Q O 17 a i qm Vl a C Eq S m WI I WI II .. .. N z O OG�L I `I II� lU 1 ' f 111 1 r 1 1 1 1 ................v :......_.......<_ .... r- iv', li I 1 • y I II i 1 , � 1 ' 1 1 i ....s-.___ _________J 009 INSTRUCTIONS--------------------- --------------------------' -------------------- BAF System ® When choosing the location to dig, first consult your Site Characterisation Report as submitted to the planning authority. This will show the proposed location of the system and the design of the percolation area in detail. It will also note the presence of rock or a high water table, in which case a rock -breaker or water -pump can be organised in advance. It is important to observe the EPA Separation Guidelines as shown below. Joe tabkI . These show the minimum distance the system and percolation area may be from the house etc. FEATURE MINIMUM SEPARATION (m) Oakstown BAF Sewage treatment System Recommendations Oakstown BAF Sewage treatment System Irrigation Area Dwelling served 7111 1013) Adjacent dwelling 711) 1013) Wall 311) 3 Road 4111 4 Site boundary 311) 3 Portable water source 10 30- 10012) Watercourse 10 10 © Ensure that there is a solid unimpeded access for the Oakstown truck back to the hole. Clear any build up of clay from around the hole to allow the truck to reverse to within one metre of the hole. © In very wet conditions, it is best to leave the last few bucketfuls to be dug when the truck arrives. If the ground is rocky, it is advisable to dig the hole ahead of time to minimise delays on -site. 0 Ensure there are no power lines or other hazards above the excavation site. © Ensure that there is solid ground for the stabilising "jacks" to stand on. Do not dig trenches where a jack will need to stand. 0 We recommend an inspection chamber (AJ) be fitted just before the BAF Unit for maintenance. Digging Instructions Oakstown BAF 6PE Wastewater Treatment System 1. Dig a hole 3200mm long [106"] by 2400mm wide [8ft] 2. Allow 1500mm from the bottom of the invert to the base of the hole 3. A bed of screenings will help to ensure a level surface for the tank 3200mm Z780mm ___-----__ E ro Oakstown BAF 6PE E; E 110mm .�► ri oE: CV E Inlet From 3 32mm Hydrodare Dwelling . • to percolation IiOmm area Piping ' Oakstown, Trim Telephone: 046 - 943 - 1389 E-mail: into@oreillyoakstown.com Co. Meath Fax: 046 - 943 - 7054 Web: www,oreillyoakstown.com r--[_INSTRUCTIONS----------------------------------------------------------------------; BAF System Oakstown BAF 6PE ----------x- * 75mm --9`Inlet E o E L() E N O' O n7 Q Once the tank has been installed into the excavation it is imperative to backfill around the tank immediately. 0 Please make sure that the final finished ground level is 75mm (3inch) below the top of the risers to prevent flooding of the electronic controls in exceptionally wet weather. If in doubt, we can hold off on commissioning the system until the landscaping is finished and fit extra risers if required. 0 Our driver will leave sufficient 7 -Core Cable to reach the house. Our technician will commission the system by installing the air blower, water pump and electronic controls and wiring them at the system. He will leave the "internal panel" for connection by your electrician to the mains with the most senior person on site. If there is nobody on site, it will be left inside the "Green Box" on the system itself. Percolation O It is important to refer to the relevant Site Characterisation Report for size and design of the percolation area. The following diagram is only a simple outline. 0 25 - 40mm Screening "-------" -"-•-- Distribution N Box 32m1 Hydrodare� o Trench Inlet N I Fall of 1:200 in Percolation Pipe From Dwelling 110mm 4m Piping -••---. minimum N� 100mm Percolation Pipe Waste Water Treatment Svstem N Length of pipe dependant on soil type. Percolation bed dependant on water table. Consult O'Reilly Oakstown if in doubt. Sample Percolation Area Only (NOT TO SCALE) EM�aintenance Please call O'Reilly Oakstown when moving in or when the system has been connected. Our technician will carry out a site visit to ensure the system has been wired, switched on and the risers are above the surrounding topsoil. A technician will visit the site to carry out a full service towards the end of the first year. BAF 6PE WTS :: 01/17 Oakstown, Trim Telephone: 046 - 943 - 1389 E-mail: info@oreiIlyoakstown.com Co. Meath Fax: 046 - 943 - 7054 Web: www.oreillyoakstown.com This document replaces neither the declaration of performance nor the CE marking. • (Iii (r DAkkS '��:` Deutsche Akkreditierungsstetle B•F1-17712-o1-o0 Notified Body Certified according to No.: 1739 ISO 9001:2008 Prufinstitut fur Abwassertechnik GmbH TREA1 Vff--- T PERFORMANCE RESULTS O'Reilly Oakstown Environmental Ltd. Oakstown, Trim, Co. Meath, Ireland EN 12566-3 Results corresponding to EN 12566-3 and S.R. 66 PIA-SR66-1603-1036 Oakstown BAF System Submerged aerated fixed film bioreactor Nominal organic daily load Nominal hydraulic daily load Material Watertightness Structural behaviour (Calculation) Durability Treatment efficiency (nominal sequences) COD 93.0% BOD5 97.5 % NH4-N 61.0% SS 96.7% Number of desludging Not more than once Electrical consumption 2.0 kWh/d 0.38 kg/d 1.20 m3/d Concrete Pass Pass (also wet conditions) Pass Efficiency Performance tested by: PIA -- Prufinstitut fur Abwassertechnik GmbH (PIA GmbH) Hergenrather Weg 30 52074 Aachen, Germany � bt �bwasseitL 9P,0, tested'e`�e Elmar Lance January 2017 Effluent 46 mg/I 8 mg/I 13 mg/I 12 mg/I Page 1 of 8 O'Reilly Environmental Oakstown, Trim E: info@oreiIlyoakstown.com Co. Meath W: www.oreillyoakstown.com Tel: 046 - 943 - 1389 V.A.T Reg. No.: IE 6401624D Fax: 046 -943- 7054 Company Reg. No.: 381624 BAF System This contract is between O'Reilly Oakstown Limited (The Company) and (The owner) of system No: In relation to the maintenance of The Oakstown Domestic BAF Waste Water Treatment System (The system) associated with a domestic dwelling located at Address: Telephone: Purpose of the contract. The purpose of this contract is to provide for the annual inspection and servicing of the system installed at the above address as stated. Duration of Contract This contract is for a period of twelve months to commence upon the date on which both parties affix their signatures to this copy of the standard agreement. The annual fee for the first year's maintenance is included in the price of the system. A further maintenance contract will be offered for the years thereafter. Scope of Contract. The scope of the contract is restricted to the holding and treatment tanks, associated blowers, electric motors and fittings which comprise the original system as installed by the company or their approved representatives. Exclusions This contract excludes all percolation and drainage areas associated with the system together with any other drainage or treatment system in use on the same site or connected to the same domestic premises. Also excluded are treatment systems connected to any premises other than private domestic dwellings. The provisions of this contract, in addition, do not apply to any system that has been the subject of alteration by the customer or their representative following installation by the company. Features of the Contract The service contract provides the following: A yearly inspection of the system which reviews and addresses the following. > A review of the electric control panel. > Inspection of air filter and replacement if necessary. ➢ A general inspection of the installation to ensure that optimum operating conditions are being maintained ➢ A functional test of the system to verify that pumps and blowers are operating as required. ➢ The completion of a service report and the submission of same to the householder/occupier. Emergency Call Out Facility In addition to the provisions of a standard service inspection, the features of this contract include an emergency call out facility. The facility operates on the following basis: ➢ Calls received on or before 11.00 a.m. will generally be attended to on day of receipt. ➢ Calls made after that time may be attended to on the same day but will in any event be attended to the on the following day or as soon as possible thereafter. ➢ Service and emergency calls should where possible be made during normal office hours. > Prior to making an emergency call, system users are requested to ascertain the nature if the presenting defect and to be prepared to provide this information to the company personnel receiving the call. ➢ In the event that telephone instructions can correct the problem the system user will be provided with the appropriate instructions. p'R19fi�T.y E —OA n�5TO1111— `" .N. O'Reilly Environmental Oakstown, Trim E: inlo@oreillyoakstown.com Co. Meath W: www.oreillyoakstown.com Tel: 048-943- 1389 V.A.T Reg. No.: IE 6401624D Fax: 046 - 943 - 7054 Company Reg. No.: 381624 ➢ Should a site visit prove necessary the company personnel involved will on the basis of information supplied, evaluate the circumstances involved and schedule a service call on the basis of supplied information ➢ If deemed necessary, company personnel may issue temporary instruction to minimise the impact of the source of the problem. > Service call reports are completed upon the conclusion of each visit. Materials and Components Materials and components supplied as a result of contract or emergency site visit will be the itemised on reports and will be subject of charges where necessary in addition to the annual contract fee. Annual Contract Fee There is no annual contract fee for the first year. A contract fee will be charged for the maintenance contract thereafter. The contract fee will be that prevailing at the time the contract is signed and will be subject to annual review thereafter. Contract fees are subject to the addition of VAT at the prevailing rates applicable on the date of acceptance and approval of the contract, Cancellation of Contract. Service contracts may be cancelled by the issuance of written notice within a fourteen day period prior to the renewal date. Confirmation and Acceptance The parties to this contract signify their acceptance of the terms and conditions of same through the appendage of their signatures below and confirmation of receipt of the specified annual contract fee. This contract becomes effective for the full period as stated upon the appendage of signatures by both parties and the payment of the annual contract fee to the company by the customer. BAF System Signed: On behalf of O'Reilly Oakstown Limited, Trim, Co. Meath. Signed: The customer Date of signing: Note: The Oakstown BAF Wastewater Treatment System provides the optimum conditions to allow both anaerobic and aerobic bacteria to break down household effluent in all efficient and odour free process. However, to keep your system working properly please remember to use non -biological washing powders with low levels of phosphates, minimise use of bleach and caustic sodas and never allow grease, cooking oil or household chemicals into the system. O'REII.LY -OAKSTOW11- -EHYIRONMENiAL- A4iies a� <I '. Lii 999' § 3 .J 0 o CD y O O DCfl m Q T O CD CD cn X a Q —g<co z J Q O -n 9° -4- D m r cn = Q CD D C) o C7 C Q o a rn --i N O Cn C CD / / \/ / / � `� i I =m _/ p I ohm m � / N // // , // / / / O O / / I II a COD n p oT on v (n -p m m m f z m f o D n B m m D Co Co r0 r Z 3 A z D Z f m 0_i p� Z m w V o f G7 NO I v m 0 o r Z - Q N rn OS F Nrn s = D Z7 m o g Z> O N y m T C p m o f o C) ,� m ;u n � m � c � y Proposed I 'ew Dwelling At Coolnacarte Td., Scotshouse SITE LOCATION LANL .,.NNERSHIP Co. Moncl,lian OUTLINED IN RED :- OUTLINED IN BLUE :- O.S. REF XVI - 11 & 15 SCALE: 1:500 New Dwelling For Aine Mc Quaid I nnel l?Innicfr it f r%mr�lininf M rr 0 150 OUTPUT SCALE: 1:2,500 300 450 600 Feet COMPILED AND PUBLISHED BY: No part of this publication may This topographic map Tailte Eireann. be copied, reproduced or transmitted does not show Phoenix Park, in any form or by any means without legal property boundaries, Dublin 8, the prior written permission of the nor does it show Ireland. copyright owner, ownership of physical features. D08F6E4 The representation on this map ©Tailte Eireann, 2025. www.tailte.ie of a road, track or footpath All rights reserved. is not evidence of the existence of a right of way. Any unauthorised reproduction infringes Tailte Eireann copyright. ry CENTRE AITMCOORDINATES: 648338,819912 ORDER NO.: PUBLISHED: 50476955_1 05/07/2025 MAP SERIES: MAP SHEETS: 1:2,500 1348-C CAPTURE RESOLUTION: The map objects are only accurate to the resolution at which they were captured. Output scale is not indicative of data capture scale. Further information is available at: www.tailte.ie; search 'Capture Resolution' LEGEND: To view the legend visit www.tailte.ie and search for 'Large Scale Legend' Tailte Eireann I I REV DATE AMENDMENT PLANNING DRAWING SITE LOCATION & LAND OWNERSHIP Project: PROPOSED NEW DWELLINGHOUSE AT COLLNACARTE TD., SCOTSHOUSE FOR AINE MC QUAID Drawing Title: PLANNING DRAWING - SHEET No, 5 Drawing: P -2026-05-05 Rev: Scale 1:2500 Date: May 2026 Drawn By: PK