Loading...
HomeMy WebLinkAbout2560469 - F.I. Received Doc. - Water Protection ChecklistMONAGHAN LOCAL AUTHORITIES Environment Protection Plan Checklist This is a checklist to be completed by applicant to be backed up by an appropriate level of detail depending. To be accompanied by a Site Drainage Plan – as set out in the Monaghan County Development Plan 2025 – 2031. General Site and Water Body Details Planning Ref. No. 25/60469 Applicant Townland Dundrumman Water Supply Source N/A X Co-ordinate 1 54.276336 Y Co-ordinate 1 -7.130878 WFD River Sub Catchment2 Finn[Monaghan]_SC_010 WFD River Sub Basin2 Maghery_10 WFD River Waterbody Objective2 Not deteriorate in status because of a new activity or development WFD River Waterbody latest Status 2 Status Year WFD River Waterbody Risk2 At risk Poor 2019-2024 Groundwater Vulnerability 3 Low Aquifer Importance 3 Locally Important Proximity to sensitive receptors (Private Wells, Public and Private Water Supply Sources, Amenity Areas, SPA’s, SAC’s , NHA) (meters) • Approximately 2,000m south of Slieve Beagh SPA (Nearest European Site) • Approximately 3,164m away from Eshbrack Bog NHA (closest NHA from the Proposed Development) • Approximately 3,232m away from Kilcoran Lough pNHA (closest pNHA) • Approximately 490m from the set back area from a groundwater well (2333SEW053). • Approximately 1,420m from Tydavnet (IE_GSI_SPA_203) which is the closest Group Water Scheme Publix Supply Source Protection Area outer zone. Proximity to nearest watercourse (culverted or open), wetland or lake (meters) Approximately 135m from the Maghery Stream (culverted). Existing EPA Licence (insert licence no) N/A Existing Section 4 licence (insert licence no) N/A Proposed Development Is the development entirely or part of one of the following? (tick) Domestic dwelling Agricultural (cattle/dairy) Industrial-food related Public Works Agricultural Industrial-non food RECEIVED: 26/05/2026 (mushrooms) Housing Agricultural (poultry) Quarrying/extractive industries Institutional Agricultural (piggery) Transport related Commercial/Retail Other agricultural – specify below Filling station/Fuel depot Mixed Use Development Other Type of wastewater Produced by the proposed development (tick) No wastewater produced √ Domestic type waste waters × Domestic type waste waters >5m3 per day 4 × Waste waters produced from any trade, food, preparation or business 4 × Wheel wash, vehicle wash, cooling waters 4 × Waste waters produced from quarrying etc 4 × Other waste waters 4 × Have proposals for Wastewater Management during the operational phase and full details of same been included with the application? (tick) Public Sewer Connection details (Uisce Eireann) × Existing Wastewater Treatment System √ Proposed new onsite wastewater treatment system × No wastewater generated √ Have proposals for Waste Facility aftercare and use been included with the application? (tick) Agricultural Improvement Plan where applicable × Closure plan and aftercare details × Proposed water sampling locations clearly identified √ License or Lease agreement for the site if not owned by the applicant. × Fuel or Outdoor Material Storage for Non Domestic Developments Number of fuel storage tanks existing or proposed on site? 0 Are fuel storage tanks bunded 5? N/A Detail liquid / feedstuffs / organic / chemical / waste oil storage on outdoor sites N/A Proposals for protection of water receptors during the Construction Phase Has a CEMP relating to water protection and waste management been included with the application? A CEMP has been included as part of the planning application. Water protection measures have been informed by a thorough Water Framework Directive (WFD) assessment and a water sampling plan shall form part of the CEMP (See Appendix 1 of the CEMP). Name of person appointed to oversee the implementation of the CEMP. The appointed EnvCoW and the appointed contractor. Hard Surface and Open Yard Areas for Non Domestic Developments Footprint of proposed development including yard areas in m2 • Approximately 210.25 m2 for the foundation of the proposed wind turbine. • Approximately 560m2 for the access track. • Approximately 500 m² for the crane hardstanding Is there potential for soiled yard areas from material, product waste or manure handling, fuel dispensing, silt and soil, yard washing etc. √ If yes, are silt trap(s), interceptor(s), soiled water tanks or other control measures shown on drainage plan? √ Has the use of SUDS (Sustainable Urban Drainage Systems – http://www.susdrain.org ) been considered in the √ RECEIVED: 26/05/2026 design of this development? Development History – All Developments Have previous pollution prevention planning conditions been complied with 6? √ Does existing development have an up to date (as constructed) site drainage plan? √ Is the existing/proposed development sewered or unsewered? N/A If unsewered, is the existing wastewater treatment system fit for purpose7? N/A Has the storm water drainage system been examined and/or surveyed for misconnections? (Information leaflet available from Environment Section) N/A Is there an existing Certificate of Registration or Waste Facility Permit at the site? N/A Checklist of items to be included on Site Drainage Plan(tick) Location of lakes, watercourse, wells used for water supply, or karst features on or within 25m of domestic or 100m of non domestic development site √ Location of all drainage outfall points √ Foul water drainage system (in Red) N/A Storm water drainage system (in Blue) N/A Soiled yard area, soiled water drainage and management system √ Storm water management system, including silt traps, oil interceptor(s) and SUDS facilities √ Location of waste water treatment facilities N/A Location of fuel storage tank(s) N/A Stream/Lake/Wetland/Riparian Corridors/Wells √ Footnotes and Useful Information 1 Projection in the Irish Grid 2 WMU, RWB, WB status. Objectives available on water maps at www.wfdireland.ie 3 Available in the public mapping section at www.gsi.ie 4 For information leaflets on Business Premises and Proper Use of Drains and information on discharge licensing see: http://www.monaghan.ie/contentv3/services/environment/formsguidesdocumentsdownlands/ http://www.monaghan.ie/contentv3/services/environemtn/water/waterawareness/leaftletsandguidelines/ 5 Guidance: www.envirocentre.ie Best practice for Oil Storage (BPGCS05) 6 Has certification of installation for previously granted wastewater treatment system been required and if so has it been submitted. 7 Refer to EPA Guidance at: http://www.monaghan.ie/contentv3/services/environment/water/waterawareness/faqforseptictanks/ and http://www.monaghan.ie/contentv3/media/monaghanie/content/files/pdf/environment/Water Pollution&DrainageSystems.pdf 8 Refer to Water Body, Sensitive Waters and Sensitive Land Maps in Chapter 4 of the Monaghan County Development Plan 2013-2019 Abbreviations WMU Water Management Unit RWB River Water Body WB Status Water Body Status IPPC Integrated Pollution Prevention Control Licence EIA Environmental Impact Assessment For Office Use: Sensitivity of Location Is the development located upstream of a high river quality site 8? × Is the development located within a good status waterbody 8? × Is the development located in the catchment of a water supply source 8? Yes, the Proposed Development is located within the Erne (ID 36) and shares the same catchment as Unshin lake (IE_NW_36_712), Lough Melvin (IE_NW_35_160), Garvagh Lough Trib (UKGBNI1SH262601001), OWENSALLAGH_010 River (IE_NW_36O010800), ERNE_090 River (IE_NW_36E011410), FINN (MONAGHAN)_030 River (IE_NW_36F010400), ANNALEE_050 River (IE_NW_36A020600), Coragh RECEIVED: 26/05/2026 Lake (IE_NW_36_460), Baraghy Lake (IE_NW_36_635), White Rockcorry lake (IE_NW_36_647), Killcoran Lake (IE_NW_36_329), Drumgole Lake (IE_NW_36_415), Killynenagh Lake (IE_NW_36_409). Is the development located within the Source Protection Zone (SPZ) of a groundwater supply source 8? × Does the development require a discharge licence to surface or ground waters under the Water Pollution Acts? × Risk to waters in relation to scale of development, previous planning/environmental history, IPPC or EIA aspects, site management and location in a sensitive area × Applicant: Agent:_____James Glackin_____________________Date________12/05/2026_____ RECEIVED: 26/05/2026 RECEIVED: 26/05/2026 RECEIVED: 26/05/2026