Loading...
HomeMy WebLinkAbout2660215 - Site assessment reportSITE SUITABILITY ASSESSMENT REPORT JASON & DENISE FINNEGAN CLONAVOGIE BROOMFIELD CO MONAGHAN IN ACCORDANCE WITH: EPA CODE OF PRACTICE WASTEWATER TREATMENT AND DISPOSAL SYSTEM SERVING SINGLE HOUSES 2021 PREPARED BY: AARON MC BENNETT Bsc Env Sc RECEIVED: 27/05/2026 SITE CHARACTERISATION FORM COMPLETING THE FORM Section 3.2 In this section use an underline _____ across all six columns to indicate the depth at which changes in classification / characteristics occur. Section 3.4 Lists supporting documentation required. Section 4 Select the treatment systems suitable for this site and the discharge route. Section 5 Indicate the system type that it is proposed to install. Section 6 Provide details, as required, on the proposed treatment system. Notes: All calculations in this form are automatic. Where possible information is presented in the form of drop down selection lists to eliminate potential errors. Variable elements are recorded by tick boxes. In all cases only one tick box should be activated. All time record fields must be entered in twenty four hour format as follows: HH:MM All date formats are DD-MM-YYYY. All other data fields are in text entry format. This form can be printed out fully populated for submission with related documents and for your files. It can also be submitted by email. Step 1: Goto Menu Item File, Save As and save the file under a reference relating to the client or the planning application reference if available. Use the Clear Form button to clear all information fields. Note: This form requires the latest version of Adobe Acrobat Reader and on PC’s Windows 7 or later. Windows XP produces errors in calculations. Note: To secure your work prior to forwarding to third parties please select Print, select Printer “print to PDF” and name and save document.RECEIVED: 27/05/2026 2.0 GENERAL DETAILS (From planning application) Soil Type, (Specify Type): Subsoil, (Specify Type): Bedrock Type: Aquifer Category: Regionally Important Locally Important Poor Vulnerability: Extreme High Moderate Low Groundwater Body: Status Name of Public/Group Scheme Water Supply within 1 km: Source Protection Area: ZOC SI SO Groundwater Protection Response: Presence of Significant Sites (Archaeological, Natural & Historical): Past experience in the area: Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, and/or any potential site restrictions). Note: Only information available at the desk study stage should be used in this section. APPENDIX A: SITE CHARACTERISATION FORM File Reference: 1.0 GENERAL DETAILS (From planning application) Prefix: First Name: Surname: Address: Site Location and Townland: Number of Bedrooms: Maximum Number of Residents: Comments on population equivalent Proposed Water Supply: Mains Private Well/Borehole Group Well/Borehole Mr Jason & Denise Finnegan Broomfield, Co Monaghan Broomfield, Co Monaghan 4 6 The proposed dwelling is a 4 bed which can cater for a maximum of 6 persons at any one time. 4 ( AminSW - Shallow well drained mineral (Mainly acidic)) TLPSsS-Till derived chiefly from Lower Palaeozoic rocks Late Ordovician-Silurian deep marine greywacke, mudstone (Longford-Down) Pl 4 IEGBNI_NB_G_019 None R3¹ None within 250m Soils within the locality are generally well drained in the topsoil & subsoils. The site initially seems suitable to discharge to ground.The soil type in the area is dominated by Acid Brown Earths (75%). Groundwater as a recourse will be at risk if separation distances are not adhered to due to the 'Extreme' Vulnerability. Groundwater Protection Response is R31 - A secondary treatment system as described in Chapters 8 and 9 is installed with a minimum thickness of 0.3 m unsaturated soil/subsoil with percolation values from 3 to 75 (in addition to the polishing filter, which should be a minimum depth of 0.9 m), beneath the invert of the polishing filter (i.e. 1.2 m in total for a soil polishing filter). and subject to the following conditions: 1. The authority should be satisfied that, on the evidence of the groundwater quality of the source and the number of existing houses, the accumulation of significant nitrate and/or microbiological contamination is unlikely. 2. No on-site treatment system should be located within 60 m of the public, group scheme or industriwater supply source. 3. A management and maintenance agreement is completed with the systems supplier. Good RECEIVED: 27/05/2026 3.0 ON-SITE ASSESSMENT 3.1 Visual Assessment Landscape Position: Slope: Steep (>1:5) Shallow (1:5-1:20) Relatively Flat (<1:20) Slope Comment Surface Features within a minimum of 250m (Distance To Features Should Be Noted In Metres) Houses: Existing Land Use: Vegetation Indicators: Groundwater Flow Direction: Ground Condition: Site Boundaries: Footslope 4 in soil polishing filter area Neighboring houses located >50m west from the proposed soil polishing filter. Agricultural Grassland There are no vegetation indicators within 250m of the proposed soil polishing filter . Grassland is the predominant vegetation within the area & throughout the proposed soil polishing filter area. South Direction The area of the site where tested was carried out was dry & firm underfoot. No poaching was observed throughout the site Local road & hedge are located in the south, east & west of the soil polishing filter. Field is located to the north of the proposed soil polishing filter.RECEIVED: 27/05/2026 3.0 ON-SITE ASSESSMENT 3.1 Visual Assessment (contd.) Roads: Outcrops (Bedrock And/Or Subsoil): Surface Water Ponding: Lakes: Beaches/Shellfish Areas: Wetlands: Karst Features: Watercourses/Streams:* *Note and record water level Local road is located approximately 10m south, east & west from the proposed soil polishing filter. No outcrops with identified within 250m from the proposed soil polishing filter. No surface water occurred within 250m of the proposed soil polishing filter at the time of assessment. The majority of the land in this area is on a gradient. None within 250m of the proposed soil polishing filter. None within 250m of the proposed soil polishing filter. None within 250m of the proposed soil polishing filterr. None within 250m of the proposed soil polishing filter. Stream is located >15m south of the proposed soil polishing filter.RECEIVED: 27/05/2026 Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, the suitability of the site to treat the wastewater and the location of the proposed system within the site). *Note and record water level 3.0 ON-SITE ASSESSMENT 3.1 Visual Assessment (contd.) Drainage Ditches:* Springs:* Wells:* None within 10m of the proposed soil polishing filter. None within 250m of the proposed soil polishing filter. Proposed site will be serviced by on site bored well located 48m uphill from the proposed soil polishing filter. If a well is to be bored on site it shall be located >30m up gradient from the proposed soil polishing filter. This will ensure it is outside the minimum separation distance of the groundwater protection response according the EPA Code of Practice 2021. As all the wells in the locality will therefore meet the required separation distances of the Groundwater Protection Responses of GSI/EPA/DoELG and the EPA Code of Practice (2021), none are deemed to be at risk from the proposed polishing filter’s installation. The site will be suitable to discharge to ground if a pocket of acceptable soil with sufficient depth can be located within the area of the proposed polishing filter. During the visual assessment it became clear that the site was well drained . There are no signs of impermeable soils throughout the site. Surface water around the site does not seem to be a potential target unless the soil within the proposed polishing filter is found to be saturated within 0.50m BGL (Below Ground Level). Wells in the area are not considered to be at risk as none occur within the minimum separation distance of the groundwater protection response GSI/EPA/DoELG and the EPA Code of Practice 2021.The proposed treatment unit and soil polishing filter are to be installed exactly where specified in this Soil Characterisation report. Following the visual assessment, I decided to dig the test holes on the southern proportion of the site. The land here is firm and dry underfoot RECEIVED: 27/05/2026 3.2 Trial Hole (should be a minimum of 2.1m deep (3m for regionally important aquifers)) Depth of trial hole (m): Depth from ground surface Depth from ground surface to bedrock (m) (if present): to water table (m) (if present): Depth of water ingress: Rock type (if present): Date and time of excavation: Date and time of examination: Depth of Surface and Subsurface Soil/Subsoil Percolation Texture & Plasticity and Soil Density/ Colour**** Preferential Tests Classification** dilatancy*** Structure Compactness flowpaths 0.1 m 0.2 m 0.3 m 0.4 m 0.5 m 0.6 m 0.7 m 0.8 m 0.9 m 1.0 m 1.1 m 1.2 m 1.3 m 1.4 m 1.5 m 1.6 m 1.7 m 1.8 m 1.9 m 2.0 m 2.1 m 2.2 m 2.3 m 2.4 m 2.5 m 2.6 m 2.7 m 2.8 m 2.9 m 3.0 m 3.1 m 3.2 m 3.3 m 3.4 m 3.5 m Likely Subsurface Percolation Value: Likely Surface Percolation Value: Note: *Depth of percolation test holes should be indicated on log above. (‘Enter Surface or Subsurface at depths as appropriate). ** See Appendix E for BS 5930 classification. *** 3 samples to be tested for each horizon and results should be entered above for each horizon. **** All signs of mottling should be recorded. To avoid any accidental damage, a trial hole assessment or percolation tests should not be undertaken in areas which are at or adjacent to significant sites, (e.g. NHAs, SACs, SPAs, and/or Archaeological etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. 2.10m N/A N/A N/A Shale @1.00m BGL 22-Jan-2026 08:00 24-Jan-2026 08:45 S1-3 SS1-3 SILT/CLAY SILT/CLAY & stones Shaley rock with SILT/CLAY Base of Hole @2.10m BGL 1,1,2 threads 30mm,30mm, 30mm ribbons dilatant raspy 2,2,2 threads, 40mm,50mm,50m m ribbons, dilatant raspy 1,1,1 threads 10mm,10mm, 10mm ribbons dilatant where SILT/CLAY present Crumb Crumb Crumb Low Medium Low Brown Brown Brown 20-27 11-16 RECEIVED: 27/05/2026 3.3(a) Subsurface Percolation Test for Subsoil x x x 3.2 Trial Hole (contd.) Evaluation: Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface to top of hole (mm) (A) Depth from ground surface to base of hole (mm) (B) Depth of hole (mm) [B - A] Dimensions of hole [length x breadth (mm)] Step 2: Pre-Soaking Test Holes Pre-soak start Date Time 2nd pre-soak Date start Time 2 3 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T10 0 Percolation Test Hole No. 1 Date of test Time filled to 400 mm Time water level at 300 mm Time (min.) to drop 100 mm (T100 ) Average T100 If T100 > 480 minutes then Subsurface Percolation value >120 – site unsuitable for discharge to ground If T100 ≤ 210 minutes then go to Step 4; If T100 > 210 minutes then go to Step 5; The upper 0.40m of the trial hole profile consists of a brown soft to firm soil. (A Horizon) The brown subsoil (0.40m –1.30m) consists of SILT/CLAY with occasional stone This soil will allow draining to take place vertically or sub vertically into the subsoil. (B Horizon) Both A & B Horizons are free draining, and no mottling was evident. The 'C' horizon beneath the soil extends to the water table at 1.30m depth and is a soft to firm, 300 700 400 300 700 400 300 700 400 300 300 300 300 300 300 23-Jan-2026 10:10 23-Jan-2026 14:10 23-Jan-2026 10:10 23-Jan-2026 14:12 23-Jan-2026 10:10 23-Jan-2026 14:13 24-01-2026 10:15 11:18 63.00 24-01-2026 10:15 11:23 68.00 24-01-2026 10:15 11:35 80.00 3 70.33RECEIVED: 27/05/2026 Result of Test: Subsurface Percolation Value = (min/25 mm) Step 4: Standard Method (where T100 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish ∆t (min) Start Finish ∆t (min) Start Finish ∆t (min) Time Time Time Time Time Time (at 300 (at 200 (at 300 (at 200 (at 300 (at 200 mm)mm)mm)mm)mm)mm) 1 2 3 Average ∆t Value Average ∆t/4 = Average ∆t/4 = Average ∆t/4 = [Hole No.1](t1) [Hole No.2](t2) [Hole No.3](t3) Result of Test: Subsurface Percolation Value = (min/25 mm) Comments: Comments: Percolation Test Hole No.1 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Time of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 1 = (T1 ) Step 5: Modified Method (where T100 > 210 minutes) Percolation Test Hole No.2 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Time of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 2 = (T2 ) Percolation Test Hole No.3 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Tim§e of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 3 = (T2) 11:19 12:35 76.00 12:36 13:59 83.00 14:00 15:29 89.00 82.67 20.67 11:24 12:42 78.00 12:43 14:12 89.00 14:13 15:50 97.00 88.00 22.00 11:36 13:16 100.00 13:17 15:09 112.00 15:10 17:09 119.00 110.33 27.58 3 23.42 SS1, SS2 & SS3 confirm the make up of the subsoil of SILT/CLAY with stones. All holes where empty the morning off the tests prior to 2 pre-soakings in the days previous .Theses test support the observations makes on the trial holes visual assessment in relation to the texture and drainage classes. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 0.00RECEIVED: 27/05/2026 3.3(b) Surface Percolation Test for Soil Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface to top of hole (mm) Depth from ground surface to base of hole (mm) Depth of hole (mm) Dimensions of hole [length x breadth (mm)] Step 2: Pre-Soaking Test Holes Pre-soak start Date Time 2nd pre-soak Date start Time Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 Percolation Test Hole No. 1 2 3 Date of test Time filled to 400 mm Time water level at 300 mm Time to drop 100 mm (T100 ) Average T100 If T100 > 480 minutes then Surface Percolation value >90 – site unsuitable for discharge to ground If T100 ≤ 210 minutes then go to Step 4; If T100 > 210 minutes then go to Step 5; x x x 0 400 400 0 400 400 0 400 400 300 300 300 300 300 300 23-Jan-2026 10:20 23-Jan-2026 14:30 23-Jan-2026 10:20 23-Jan-2026 14:30 23-Jan-2026 10:20 23-Jan-2026 14:30 24-Jan-26 10:25 11:05 40.00 24-Jan-26 10:25 11:19 54.00 24-Jan-2026 10:25 11:12 47.00 47.003RECEIVED: 27/05/2026 Step 4: Standard Method (where T100 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish ∆T (min) Start Finish ∆T (min) Start Finish ∆T (min) Time Time Time Time Time Time (at 300 (at 200 (at 300 (at 200 (at 300 (at 200 mm)mm)mm)mm)mm)mm) 1 2 3 Average ∆T Value Average ∆T/4 = Average ∆T/4 = Average ∆T/4 = [Hole No.1](T1 ) [Hole No.2](T2 ) [Hole No.3](T3 ) Result of Test: Surface Percolation Value = (min/25 mm) Comments: (min/25 mm) Comments: Percolation Test Hole No.1 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Time of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 1 = (T1 ) Step 5: Modified Method (where T100 > 210 minutes) Percolation Test Hole No.2 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Time of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 2 = (T2 ) Result of Test: Surface Percolation Value = Percolation Test Hole No.3 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Time of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 3 = (T2) 11:06 11:51 45.00 11:52 12:43 51.00 12:44 13:38 54.00 50.00 12.50 11:20 12:17 57.00 12:18 13:23 65.00 13:24 14:45 81.00 67.67 16.92 11:13 12:01 48.00 12:02 12:57 55.00 12:58 13:55 57.00 53.33 13.33 14.25 S1, S2 & S3 confirm the make up of the SILT/CLAY in the top layer . All holes where empty the morning off the tests prior to 2 pre-soakings in the days previous .Theses test support the observations makes on the trial holes visual assessment in relation to the texture and drainage classes. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 0.00 0.002RECEIVED: 27/05/2026 3.4 The following associated Maps, Drawings and Photographs should be appended to this site characterisation form. 1 The calculated percolation area or polishing filter area should be set out accurately on the site layout drawing in accordance with the code of practice’s requirements. 1. Discovery Series 1:50,000 Map indicating overall drainage, groundwater flow direction and housing density in the area. 2. Supporting maps for vulnerability, aquifer classification, soil, subsoil, bedrock. 3. North point should always be included. 4.(a) Scaled sketch of site showing measurements to Trial Hole location and (b)Percolation Test Hole locations, (c) wells and (d) direction of groundwater flow (if known), (e) proposed house (incl. distances from boundaries) (f)adjacent houses, (g)watercourses, (h)significant sites (i)and other relevant features. 5. Site specific cross sectional drawing of the site and the proposed layout1 should be submitted. 6. Photographs of the trial hole, test holes and site including landmarks (date and time referenced). 7. Pumped design must be designed by a suitably qualified person.RECEIVED: 27/05/2026 Integrate the information from the desk study and on-site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Slope of proposed infiltration / treatment area: Are all minimum separation distances met? Depth of unsaturated soil and/or subsoil beneath invert of gravel (or drip tubing in the case of drip dispersal system) Percolation test result: Surface: Sub-surface: Not Suitable for Development Suitable for Development Identify all suitable options Discharge Route 1 1.Septic tank system (septic tank and percolation area) (Chapter 7) 2.Secondary Treatment System (Chapters 8 and 9) and soil polishing filter (Section 10.1) 3.Tertiary Treatment System and Infiltration / treatment area (Section 10.2) 4.0 CONCLUSION of SITE CHARACTERISATION 5.0 SELECTED DWWTS Propose to install: and discharge to: Invert level of the trench/bed gravel or drip tubing (m) Site Specific Conditions (e.g. special works, site improvement works testing etc. 1 A discharge of sewage effluent to “waters” (definition includes any or any part of any river, stream, lake, canal, reservoir, aquifer, pond, watercourse or other inland waters, whether natural or artificial) will require a licence under the Water Pollution Acts 1977-90. Refer to Section 2.4. 1:200 4 0.90 14.25 23.42 4 No Yes Yes Groundwater through soil polishing filter Tertiary Treatment System and Infiltration /treatment area Ground Water 0.20 Tests show that the site has a sub-surface value of 23.42min/25mm and a surface value of 14.25min/25mm.These results are good and the ground is proven to be permeable. No mottling was encountered in the trial hole. Tertiary treatment systems where there is an additional treatment module (after the secondary treatment system) which then discharges to an infiltration area. A Ecoflo Coco Filter shall be constructed to ensure that there is a minimum of 900mm of suitable percolating soil beneath the lowest part of the percolation at all times. The Ecoflo Coco Filter will sit on a bed on 300mm crushed stone (20-30mm in size). It is recommended that the treatment system and Ecoflo Coco Filter construction is overseen by a suitably qualified and accredited person. All works are to comply fully with EPA Code of Practice 2021. I, Aaron Mc Bennett recommend that the installation of the No.1 O'Reilly Oakstown Treatment System or simular WWTP, Ecoflo Coco Filter & Soil Polishing Filter are constructed in accordance with EPA Code of Practice 2021. Construction of works shall be carried out and overseen by a qualified accredited person. RECEIVED: 27/05/2026 SYSTEM TYPE: Septic Tank Systems (Chapter 7) Tank Capacity (m3) Percolation Area Mounded Percolation Area No. of Trenches No. of Trenches Length of Trenches (m) Length of Trenches (m) Invert Level (m) Invert Level (m) SYSTEM TYPE: Secondary Treatment System (Chapters 8 and 9) and polishing filter (Section 10.1) Secondary Treatment Systems receiving septic tank effluent Packaged Secondary (Chapter 8) Treatment Systems receiving raw wastewater (Chapter 9) Media Type Area (m2)* Depth of Filter Invert Level Type Sand/Soil Soil Capacity PE Constructed Wetland Sizing of Primary Compartment Other m3 Polishing Filter*: (Section 10.1) Surface Area (m2)* Option 1 - Direct Discharge Surface area (m2) Option 2 - Pumped Discharge Surface area (m2) DISCHARGE ROUTE: Groundwater Hydraulic Loading Rate * (l/m2.d) Surface area (m2) Surface Water ** Discharge Rate (m3/hr) 6.0 TREATMENT SYSTEM DETAILS * Hydraulic loading rate is determined by the percolation rate of subsoil ** Water Pollution Act discharge licence required Identify purpose of tertiary treatment Option 3 - Gravity Discharge Trench length (m) Option 4 - Low Pressure Pipe Distribution Trench length (m) Option 5 - Drip Dispersal Surface area (m2) SYSTEM TYPE: Tertiary Treatment System and infiltration / treatment area (Section 10.2) Provide performance information demonstrating system will provide required treatment levels Provide design information O' Reilly Oakstown WWTP 8 4.00 45.00 O'Reilly Oakstown Treatment System, Ecoflo Coco Filter & Gravel Distribution Bed 4 10.00 90.00RECEIVED: 27/05/2026 Company: Prefix: First Name: Surname: Address: Qualifications/Experience: Date of Report: Phone: E-mail Indemnity Insurance Number: Signature: ________________________________________ 7.0 SITE ASSESSOR DETAILS 6.0 TREATMENT SYSTEM DETAILS QUALITY ASSURANCE: Installation & Commissioning On-going Maintenance To secure your work prior to forwarding to third parties please select Print, select Printer “print to PDF” and name and save document. NOTE: Installation to be supervised by a competent individual with professional indemnity insurance. A completion report should be supplied to the homeowner which records the onstallation process and details. Desludging of the proposed plant should be as per table 12.2 of the EPA code of Practice (2021), or when scum in observed in the second chamber of the tank, or when the depth of sludge in the second compartment is greater than 0.40m. Mr Aaron Mc Bennett Corvoy, Ballybay, Co Monaghan Bsc Environemtal Science,QQI award 'Site Suitability for Wastewater Treatment' 8 yr experience 27-May-2026 0870697709 aaronmcbennett83@gmail.com PI/EN13064064RECEIVED: 27/05/2026 DISCOVERY MAPS Figure 1 – Location of the site at Broomfield, Co Monaghan marked with a red circle Figure 2 – Indicates Groundwater Flow Direction is to the lower ground in the south direction. Site Marked Using Red Circle Groundwater Flow Direction RECEIVED: 27/05/2026 SITE LAYOUT SHOWING PERCOLATION TEST LOCATION Location of Trial Hole, Sub-Surface & Surface Tests Carried out on 24.01.26 Groundwater Flow Direction also indicated Groundwater Flow Direction RECEIVED: 27/05/2026 CALCULATING HYDRAULIC LOADING & SIZING OF SOIL POLISHING FILTER Situation: Domestic Source: Normal Residential Dwelling Litres/day/person: 150 BOD5 grams/day/person: 60 PE Organic Loading per person: 1.00 Number of Person: 6 (Based of 2-bedroom house) Total Population Organic: 6 (Number of persons (6) x PE Organic Loading (1)) Total Hydraulic Loading (Litres): 900 (Number of persons (6) x Litres/day/person (150)) Total Organic Loading (Grams): 360 (Number of persons (6) x BOD5 grams/day/person (60)) Total Population Hydraulic: 6 How to calculate soil polishing filter size: The soil polishing fllter size is determined depending on the sub-surface value. This value is then put into a range of sizes using table 10.1 below. In our case the Subsurface value was 23.42min/25mm. Due to the size and scale of the development and future development plans Tertiary inflltration area (option 6) was the most suitable for this site. Tertiary treatment systems where there is an additional treatment module (after the secondary treatment system) which then discharges to an inflltration area. Subsurface value was 23.42min/25mm which requires 7.5m2 per person. Inflltration area required: 7.5m2 X 6PE = 45m2 (See below table 10.1 marked in red how his value was calculated) It is proposed to install an 6PE Wastewater Treatment System, Ecofio Coco fllter (or similar) and Soil Polishing Filter. RECEIVED: 27/05/2026 GEOSCIENTIFIC MAPS Groundwater/Aquifer Map From the GSI Groundwater Aquifer Map Site is classified as PI-Poor Aquifer - Bedrock which is Generally Unproductive except for Local Zones Vulnerability Map From the GSI Vulnerability Map Site is classified as – X- Extreme RECEIVED: 27/05/2026 Teagasc Subsoil Map From the Teagasc Subsoil Map Site is classified as TLPSsS - Till derived chiefly from Lower Palaeozoic rocks Geology Bedrock Map From the GSI Bedrock Map Site is classified as Late Ordovician-Silurian deep marine greywacke, mudstone (Longford-Down) RECEIVED: 27/05/2026 SITE PHOTOGRAPHS Stand Facing North From Trial Hole Excavation Area Stand Facing East From Trial Hole Excavation Area Stand Facing West From Trial Hole Excavation Area Stand Facing South From Trial Hole Excavation Area RECEIVED: 27/05/2026 Trial Hole- Front View Trial Hole- Side View RECEIVED: 27/05/2026 Excavation of Sub- Surface Hole 1 Excavation of Sub- Surface Hole 2 Excavation of Sub- Surface Hole 3 Excavation of Surface Hole 1 Excavation of Surface Hole 2 Excavation of Surface Hole 3 RECEIVED: 27/05/2026 Testing of Sub- Surface Hole 1 Testing of Sub- Surface Hole 1 Testing of Sub- Surface Hole 3 Testing of Surface Hole 1 Testing of Surface Hole 2 Testing of Surface Hole 3 RECEIVED: 27/05/2026 QQI 'SITE SUITABILITY FOR WASTEWATER TREATMENT' AWARD RECEIVED: 27/05/2026 PI INSURANCE RECEIVED: 27/05/2026 SOIL POLISHING DESIGN AREA RECEIVED: 27/05/2026 RECEIVED: 27/05/2026 Example of Gravel Distribution Bed been Prepared Example of Ecoflo Coco Filter on Gravel Distribution Bed RECEIVED: 27/05/2026 Jason and Denise Finnegan Broomfield Monaghan RECEIVED: 27/05/2026 Tel: 046 9431389 | VAT: IE 6401624D | Company Reg. 381624 sales@oreillyoakstown.com | www.oreillyoakstown.com O’Reilly Oakstown | Oakstown, Trim, Co.Meath, C15 X499 Date: 27th May 2026 Applicant Name: Jason and Denise Finnegan Site Address: Broomfield Monaghan Design Capacity: Maximum number of residents: 06 No. of bedrooms: 04 A representative of O’Reilly Oakstown Ltd has assessed the Soil Test Report and confirms the suitability of their Oakstown BAF 8 PE Wastewater Treatment System to treat eƯluent being discharged from the above proposed dwelling based on the residential demands submitted to us above. 1. Waste Water Treatment System Design Details: Maximum Capacity Design Loadings: Max no. of users Flow litres/day/person Total hydraulic load B0D5 (grams/day/person) Total organic loading (grams/day) 8 150 1200 litres 60 480 Maximum Daily Design Loadings as per client: Total Organic Loading 0.36kg BOD/day Total Hydraulic loading 0.90m³ /day Average treated eƯluent standard – see performance results on EN-12566-3 certification attached BOD 8mg/litre TSS 12mg/litre Ammonia 13mg/litre Proposed System Details – Oakstown BAF 8 P.E. Volume of Total Plant 8m³ Volume of Primary Sedimentation Chambers 4m³ Volume of Secondary Aeration Chamber 2m³ Volume of Biomedia 1.0m³ RECEIVED: 27/05/2026 Tel: 046 9431389 | VAT: IE 6401624D | Company Reg. 381624 sales@oreillyoakstown.com | www.oreillyoakstown.com O’Reilly Oakstown | Oakstown, Trim, Co.Meath, C15 X499 2. Wastewater Treatment System Description The Oakstown BAF 8 PE is designed to provide proven, cost eƯective primary and secondary wastewater treatment in robust steel reinforced concrete tanks. The primary sedimentation chamber has substantial capacity (4m3) to allow anaerobic digestion to occur naturally while letting sludge settle on the tank floor. Once primary treatment has taken place the eƯluent is further degraded in the aeration chamber where oxygen enriched wastewater provides ideal conditions for aerobic bacteria to thrive. Before pumping to the percolation area the clear water is left to further settle in the clarifier chamber to eliminate any remaining settle able solids. 3. Guarantee and Warrantees O’Reilly Oakstown provide a 12 month warranty on all parts. 4. Percolation The percolation area designed must conform to the requirements of Chapters 8 & 10 of EPA Code of Practice 2021 Wastewater Treatment and Disposal System serving single houses. The percolation area requirements are as follows: Groundwater Protection Response: R3¹ T-value (Subsurface): 23.42 as per Site Characterisation Form. P-value (Surface): 14.25 as per Site Characterisation Form. Depth from ground surface to water table: None Encountered BGL. Depth from ground surface to bed rock: None Encountered BGL. Depth from ground surface to mottling: None Encountered BGL. Tertiary Treatment is achieved through an Ecoflo coco filter module Raised Area required for disposal of treated wastewater from Ecoflo coco filter module: 90m². - See Site Characterisation report for percolation area details. RECEIVED: 27/05/2026 Tel: 046 9431389 | VAT: IE 6401624D | Company Reg. 381624 sales@oreillyoakstown.com | www.oreillyoakstown.com O’Reilly Oakstown | Oakstown, Trim, Co.Meath, C15 X499 5. Client Responsibilities unless included in our quotation  Excavation and backfill.  Construction of the percolation / polishing filter as recommended by the site engineer on the Site Characterisation report and/or drawing.  Provision of access for delivery by hi-ab truck to within 3 metres of the excavation.  Provision of a power ducting from the tanks to the house/garage.  Mounting and connection of control panel to mains power in the house/garage. 6. Operation and Maintenance The client is responsible for the operation and maintenance of the wastewater treatment system in accordance with the owner’s manual supplied by O’Reilly Oakstown. Please do not hesitate to contact us if there are any further queries. Yours sincerely Hannah Gibney RECEIVED: 27/05/2026 RECEIVED: 27/05/2026 RECEIVED: 27/05/2026 RECEIVED: 27/05/2026 RECEIVED: 27/05/2026 RECEIVED: 27/05/2026 RECEIVED: 27/05/2026 RECEIVED: 27/05/2026 RECEIVED: 27/05/2026 WWTS LAYOUT - OPTION BWWTS LAYOUT - OPTION ADATE:CHECKED:T0M LYNAMPROJECT:SR-66 O'Reilly OakstownREV:DWG NO:SCALE:N.T.S.TITLE:8PE BAF SYSTEMDRAWN:VISHWANATHO' REILLY OAKSTOWN LTD.BAF - WASTEWATER TREATMENT SYSTEMSSR6611/01/2022I.S. EN ISO 9002O'REILLY OAKSTOWNTRIM, Co.MEATHEmail: info@oreillyoakstown.comTel:(046)9431389 Fax:(046)9437054OAKS 201702AAOAKSTOWN 8PE BAF SYSTEM - SECTIONAL ELEVATION A-AOUTLET TO PERCOLATION AREAAIR COMPRESSOREXCESS BIOLOGICAL SLUDGE REMOVALOUTLET TO PERCOLATION AREAOUTLET TO PERCOLATION AREAINLETINLET AIRCOMPRESSOR AIRCOMPRESSORINLETVOLUMELITRES:8000WEIGHT: TANK 1:5500kg TANK 2:6500kgTWO CHAMBER PRIMARY HOLDING TANKTHREE CHAMBER BAF UNITBIOREACTORCLARIFIERPUMP STATIONBIOREACTORCLARIFIER PUMP STATIONTWO CHAMBER PRIMARY HOLDING TANKTHREE CHAMBER BAF UNITACCESS COVER940X780ACCESS COVER350X350ACCESS COVER350X350ACCESS COVER350X350INLETEND SECTION-INLET SIDERECEIVED: 27/05/2026 2900FE Sortie = 10012002900FE Entrée =1060 1400 1200Oakstown, Trim, Co. Meath, Eircode C15 X499Lo call: 1850 200 702 Tel: +353 (0) 46 943 1389info@oreillyoakstown.com www.oreillyoakstown.comO'REILLY OAKSTOWNCommercial & Residential WastewaterTreatments Systems & Septic TanksCLIENT:PROJECT:TITLE:SCALE:DATE:DRAWING NO.:STATUS:DRAWN BY:REVISION: 00ECOFLO POLYETHYLENE FILTER 5EHLAYOUT PLAN AND SECTIONTHIS DRAWING TO BE READ IN CONJUNCTION WITH ALL RELEVANT DRAWINGS ANDSPECIFICATIONS. DO NOT SCALE FROM THIS DRAWING. FIGURE DIMENSION ONLY TO BE USED.ALL DIMENSIONS ARE IN MILLIMETERS EXCEPT WHERE SHOWN. ANY DISCREPANCIES ON THISDRAWING OR ON SITE ARE TO BE REPORTED TO THE O'REILLY GROUP. THIS DRAWING IS THEPROPERTY OF O'REILLY GROUP, IT IS A CONFIDENTIAL DOCUMENT AND MUST NOT BE COPIED,OR ITS CONTENT DIVULGED WITHOUT PRIOR WRITTEN CONSENT.1:16 @ A3SEPTEMBER 2024OAKS EF 05PROGRESSNOTE:WEIGHT - 482.2 kgDIMENSIONING, IMPLEMENTATION, USE AND OPERATION MUST BE CARRIEDOUT INACCORDANCE WITH THE REGULATIONS IN FORCE AND THE MANUFACTURER'S INSTRUCTIONSODDS HAVE A TOLERANCE OF +/- 3%ECOFLO POLYETHYLENE FILTER 5EHRECEIVED: 27/05/2026