Loading...
HomeMy WebLinkAbout2660160 - Report Received from Internal Staff - Environment26/60160 ENVIRONMENTAL REPORT To Planning From: Lisa Smith, Environment Section Ref: 26/60160 Meegan Builders (Castleblayney) Ltd, Cloghvally Lower TD,, Carrickmacross, Co. Monaghan Agent: McMahon Associates Planning permission for proposed construction of a single storey building with 2 No. light industrial units and associated 2-storey ancillary office and amenities •The erection of a 2.4m high boundary wall / fence to the perimeter of site. •Access to the site will be via the existing business park service road and entrance onto R927 carriageway as previously granted permission (ref: 17/585 and 22/144). •Foul drainage connection to existing pumping station and storm drainage connection to mains sewer as previously granted permission (ref:17/584, 17/585 and 22/144). •Together with associated landscaping, retaining walls and all ancillary site works. The site is located within the Rossdreenagh Stream_020 waterbody which has been classified as Moderate Status, with an WFD objective of restore by 2027. The site is located on an area of extreme groundwater vulnerability which is underlain by a regionally important Aquifer. The site is within Spring and Monalty Lough Source protection area and in the inner protection zone for Carrickmacross PWS. Domestic wastewater has been identified as a significant pressure on this waterbody. A water protection plan checklist has been submitted. The site is an existing industrial area/business park. There are existing units built and also undeveloped areas. In the engineers report and from the site drainage plans proposals are to connected storm water and foul drainage to the existing site drainage previously approved. The report states that the existing foul sewer and pumping station has been designed to facilitate foul sewer flow from the entire development. No confirmation of feasibility from Uisce Eireann has been submitted. It has been noted that the application has been referred to Uisce Eireann. Storm water from the site will connect to existing site storm drainage which includes an interceptor and retention pond. Sizing and calculations are based on the current site (phase 4) and a previously approved site (phase 2). Proposals designed to accommodate surface water runoff from both phases and previously approved. It is noted that a hydrogeological report was submitted with the original application (17/584) and no predicated groundwater quality issues at the site as there was good soil/subsoil cover over the bedrock to protect the underlying aquifer. SuDS drainage proposed to ensure no impact on surface water. 26/60160 I recommend that the following additional information is requested from the applicant: 1. Submit a Confirmation of Feasibility letter from Uisce Éireann confirming that Carrickmacross Wastewater Treatment Plant has capacity to accept the hydraulic and organic loading arising from the proposed development. 2. Submit details of the existing/proposed interceptor installed onsite and area draining to it. 3. Submit a Construction and Environmental Management Plan (CEMP) for agreement. This plan shall be sufficient to demonstrate that adequate measures will be in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any waters. The Construction and Environmental Management Plan shall take account of best practice and the guidance produced by Inland Fisheries Ireland titled “Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters 2016” and shall include the identification of potential pathways to the groundwater aquifer and the River Proules. The CEMP shall be prepared by a suitably qualified person and shall include the location details of the monitoring points where daily visual checks and weekly surface water monitoring (physical & chemical parameters) shall be carried out. Signed: A/Assistant Scientist Date: 27/05/2026 Approved: Date: 29/05/26