HomeMy WebLinkAbout2560353 - Submission - [E] Declan McNameeSubmission Details
Submitter
Name Declan McNamee
Address Moy Etra Castleshane Monaghan H18 NF25
Note
In relation to application
File Number 2560353
Name McGlone Cathal
Address Moy Etra Td. Castleshane Co. Monaghan RECEIVED: 02/06/2026
Declan & Lorraine McNamee
Wilmslow House, Moy Etra,
Castleshane,
Co. Monaghan,
H18 NF25
2nd June 2026
Planning Department
Monaghan County Council
Dublin Street
Monaghan
Re: Planning Application Reference 25/60353 — Response to Additional Information
Submission by Cathal McGlone
Dear Sir/Madam,
We refer to the Additional Information submission dated 16 April 2026 made by Mr Cathal
McGlone in respect of the above planning application. We wish to place the following response
on the planning file.
1. Characterisation of Our Behaviour
We are deeply concerned that Mr McGlone has chosen to include in a planning submission
personal and selective characterisations of our conduct in separate, unrelated Council
meetings from over a decade ago. We would ask the Planning Department to note that the
inclusion of this material appears intended to discredit us as objectors rather than to address
any material planning consideration. It is our view that this information has no bearing on the
proper planning and sustainable development of the application site and should be afforded no
weight in the assessment of this application.
We firmly reject any suggestion that our concerns regarding flood risk have been raised in bad
faith or as a personal grievance. Our objection has at all times been grounded in legitimate
planning considerations relating to the potential impact of further development on flood risk in
this area. RECEIVED: 02/06/2026
2. Responsibility for Flood Risk to Our Property
Mr McGlone repeatedly asserts that the flood risk to our home is entirely of our own making,
attributing it to decisions we made regarding the floor level and excavation of our site. We reject
this characterisation in the strongest terms.
Our planning application (Ref: 08/276) was made and granted in accordance with the
regulations and guidance in place at the time. The floor level included in our application was
amended in response to planning requirements relating to sightlines on the N2, constraints that
were imposed upon us as a condition of the planning process — they were not a free choice. Mr
McGlone's submission omits this important context.
3. OPW Flood Relief Works – €15,000 Grant Approval
It should also be noted that in January 2013, we received approval for Office of Public Works
funding grant of € for flood relief works at our property based on the flooding events at
that time which acknowledged the major flood risks to our property. Following test hole
conducted by Alan Traynor Consultants to evaluate soil conditions, determine groundwater
levels, and assess the permeability of the ground it was deemed the ground was unsuitable for
an overground flood defense and could not be certified by the Engineers so further work under
the grant scheme was not carried out at that time, thus the flood risk from the river remains to
this day and into the future.
4. The November 2025 Flooding Incident — Bridge Collapse Upstream
Mr McGlone relies significantly on photographs taken during the heavy rainfall event of 11
November 2025 to support his argument that his bridge has sufficient capacity and that the
flooding of the Braddox Road (L1510) was unrelated to his bridge.
We wish to draw the Planning Department's attention to a material fact that Mr McGlone's
submission entirely omits: the flooding of the L1510 road on that date was caused, at least in
part, by the collapse of a bridge further upstream, which prevented floodwaters from flowing
their natural route downstream. This obstruction resulted in water backing up and overtopping
onto the road. The fact that Mr McGlone's bridge did not overtop on that occasion is therefore
not a reliable indicator of its capacity under normal flood conditions — it is a consequence of
the upstream blockage diverting flow away from it. RECEIVED: 02/06/2026
RECEIVED: 02/06/2026
RECEIVED: 02/06/2026
RECEIVED: 02/06/2026
We submit that this omission is significant and that Mr McGlone's flood risk analysis and the
photographic evidence he relies upon must be viewed in this context. We would ask the
Planning Department and its technical advisors to investigate and consider this matter carefully
before drawing any conclusions from the November 2025 event.
4. General Observations
We maintain our objection to this application on flood risk grounds. We note that the Flood Risk
Assessment submitted by Mr McGlone's consultants is a document prepared on his behalf and
in support of his application. We respectfully request that the Council's own technical
assessment gives full and independent consideration to the cumulative flood risk posed by
additional development in this catchment area, including the potential impact of increased
impervious surfaces on surface water run-off.
We trust that the Planning Department will consider all of the above in its assessment of this
application and we ask that this response be placed on the public planning file.
RECEIVED: 02/06/2026
Yours sincerely,
___Declan & Lorraine McNamee_____
Declan & Lorraine McNamee
Moy Etra, Castleshane
Appendices:
1. Events of heavy rainfall of more than 2 hours in November 2024
Appendix 1:
RECEIVED: 02/06/2026
RECEIVED: 02/06/2026
RECEIVED: 02/06/2026