Loading...
HomeMy WebLinkAbout2560514 - Planners Report1 MONAGHAN COUNTY COUNCIL PLANNING AND DEVELOPMENT File Ref: 25/60514 Applicant: Philomena McLoughlin Advertised Development Description: Permission for demolition of existing rear extension, removal of existing roof, raising of external walls, construction of new raised roof, construction of new two-storey extension to the rear, demolition of rear outbuilding, internal and external additions and alterations, and all associated site works. Location: Drumillard Big, Castleblayney. Characteristics of Site/Area ▪ Dilapidated residential property on the outskirts of Castleblayney. ▪ Part of a terrace of seven small cottages built in the early nineteenth century converted to larger dwellings at a later date. ▪ Building was surveyed by the National Inventory of Architectural Heritage (NIAH) – reg number 41308006. ▪ Adjoining house(s) is a protected structure. Relevant Planning History Permission granted previously to raise existing roof, erect an extension to rear and renovate dwelling house under planning file number 18/77. Consultation Municipal District (MD) Engineer: No objections. Uisce Éireann/Water Services: No response. An Taisce: No response. DHLGH: No response. Road Design Section: No response. Environment Section: No objections. Appropriate Assessment Under Article 6(3) of the EU Habitats Directive and Regulation 30 of SI no. 94/1997 “European Communities (Natural Habitats) Regulations” (1997) any plan or project which has the potential to significantly impact on the integrity of a Natura 2000 site (i.e. an SAC or SPA) must be subject to an Appropriate Assessment. This requirement is also detailed under Section 177(U) of the Planning and Development Acts (2000-2010). The site is removed from any Natura 2000 sites and there are no significant pathway connectors in the vicinity. Having regard to the context and the development as proposed, and the activities associated with the development proposal both during and post construction works, it is taken that it is not necessary for an Appropriate Assessment to be carried out in relation to this development. 2 Planning Assessment Section 15.10.1 of the County Development Plan 2025-2031 concerns alterations and extensions to dwellings. Proposals to alter or extend a dwelling will be considered on their individual merits, with the main considerations being that of design and the degree of impact on existing and adjoining properties. In this regard it is noted that: ➢ The proposed alterations and extension are virtually identical to those granted previously under 18/77. The applicant previously highlighted/reaffirmed the fact that the building is not a protected structure and that, in her opinion, the proposed restoration would be sympathetic and reflective of the requirements of modern living. ➢ As per the submitted drawings, it is reasonably considered that the development would not have a material negative impact upon the residential amenities of adjoining dwellings or their private open space. Objections/Submissions/Observations Objections received from David Boyd (neighbour): ➢ Objector states that notwithstanding the date, the site notice was erected late. ➢ Claims the current proposal is substantially similar to previous applications – suggesting repeated applications are being used as a delay tactic. ➢ Objection asserts that part of the development site includes land belonging to David Boyd. ➢ Objector states the applicant’s property has been neglected for many years, with boundary maintenance issues and deteriorating structures. ➢ Proposed extension would introduce new windows directly overlooking Boyd’s private rear garden, causing loss of privacy. ➢ Objector asserts the scale/massing of the extension would overshadow his garden and reduce natural light. ➢ Submission includes an extract from the Monaghan County Development Plan indicating Lakeside Cottages have designations as structures of local importance, implying a requirement for sensitive development. Roadside view-in 3 Conclusions Further Information (FI) is needed concerning the objections received. In this regard it is noted that: ➢ The site notice was in place and correctly dated on the day of inspection. ➢ Agreed – the current proposal is substantially similar to the previous application. ➢ As per the info, it would appear that part of the development site includes land belonging to David Boyd. ➢ Agreed – the property is in a state of notable disrepair. ➢ The extension is modest and the windows are rear‑facing. It is reasonably considered that the development would not detrimentally impact on the residential amenity of David Boyd’s property. ➢ The structure is not protected. Recommendation To request FURTHER INFORMATION: 1. Objections to your application have been received. In the interest of clarity and to allow for a fully informed decision, please review the objections and submit details, which suitably confirm (i) your ownership of the subject site and, (ii) your certainty in law that you would have the sufficient rights in the land to carry out the permission. Ben Clerkin Planner 16/02/2026 4 Further Information (FI) A formal response was received on the 15/05/2026. FI Planning Assessment A third-party objection was received raising concerns in relation to (i) site ownership, (ii) impact on residential amenity, (iii) the condition and historical neglect of the property, and (iv) the potential impact on the character of the terrace. In response to the FI request, the applicant has submitted a Land Registry compliant map together with a letter from their solicitor confirming that the applicant is the legal owner of the entire application site, including the area disputed by the objector, and that they have sufficient legal rights to carry out the proposed development. Having regard to the documentation submitted, the Planning Authority is satisfied that the issue of site ownership has been adequately addressed for planning purposes. Any dispute in relation to title or boundaries is a civil matter and does not fall within the remit of the Planning Authority. In relation to residential amenity, the proposed extension is located to the rear of the dwelling and is of a modest scale, broadly consistent with that previously permitted under 18/77. The proposed window openings are typical and would not give rise to significant overlooking or loss of privacy beyond that normally expected in a built-up terrace context. Furthermore, having regard to the orientation, scale and separation distances, it is not considered that the development would result in undue overshadowing or loss of light to adjoining properties. With respect to the condition of the property, it is acknowledged that the house is in a state of disrepair; however, the proposed development will facilitate the refurbishment and continued residential use of the structure, which is considered a positive intervention. Re the character of the terrace, whilst the building was surveyed by the NIAH, it is not a protected structure. The proposed works are consistent with previously permitted development on the site and are not considered to adversely affect the character of the terrace. Conclusions ▪ The Further Information submitted has satisfactorily addressed the concerns raised in the third-party objection; a grant of permission is recommended. ▪ A development contribution is not due as the additional floor area is <40sqm. 5 Recommendation That Permission is GRANTED subject to the following conditions: 1. Associated surface water shall be disposed of within the site and shall not be allowed to discharge onto the public road or adjoining properties. Reason: In the interest of proper planning and orderly development. 2. Construction works on-site shall be limited to the hours of 08:00 to 18:00 Monday to Friday; with no works on Saturdays, Sundays or public holidays. Reason: In the interest of residential amenity. 3. The developer shall ensure that all works are carried out in a manner that does not damage adjoining properties and that all boundary treatments are made good following completion of works. Reason: In the interests of residential amenity and orderly development. 4. The development shall be carried out strictly in accordance with the plans and documents submitted on the 18/12/2025 as amended on the 15/05/2026, except as may otherwise be required in order to comply with the above conditions. Reason: In the interest of proper planning and sustainable development. Ben Clerkin Planner 29/05/2026