Loading...
HomeMy WebLinkAbout2660135 - Chief Executives AI OrderMONAGHAN CO. COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (as amended) Chief Executive's Order No: P552-26ai Reference Number: 26/60135 Name of Applicant: The Board of Management St Louis Secondary School Address: Sebana Moynagh KSNPM M11 Business Campus Innovation House, Gorey, Co. Wexford Y25A8H2 Nature of Application: Permission for a development which will consist of the installation of a new predominantly two -storey school building, with a third - storey circulation core at 2nd floor level, and a new pedestrian access bridge from the existing carpark level to the 2nd floor level of the proposed new school building. The proposed development (1010m2) includes 2 no. Mainstream Classrooms, 1 no. Science Lab & Prep Area, 2 no. Art Rooms; and all associated site and ancillary works The above proposed development consists of works within the curtilage of protected structures including: Convent of Saint Louis School Building (Reg No: 41310083); Convent of Saint Louis School Building (Reg No: 41310084); Convent of Saint Louis Church/Chapel (Reg No: 41310085); Saint Louis Convent National School (Reg No: 41310064); Convent of Saint Louis Stables (Reg No: 41310065); Saint Louis Convent/Nunnery (Reg No. 41310066); Convent of Saint Louis Gates/Railings/Boundary Walls (Reg No: 41310067); School House (Reg No: 41310072). There are also two recorded monuments within the curtilage of the proposed site: Fortified House and Bawn: Drummond Otra (Reg No. MO031-034) Location of Development: St Louis Secondary School Carrickmacross Co Monaghan ORDER: I hereby order that pursuant to the provisions of the Planning and Development Act 2000 (as amended) and Article 33 of the Planning and Development Regulations 2001 (as amended), the further information set out on the attached schedule be requested from the applicant. SENIOR PLANNER Cam- C76 2� DATE 26/60135 The Board of Management St Louis Secondary School St Louis Secondary School, Carrickmacross, Co Monaghan ADDITIONAL INFORMATION 1. Section 15.24 and Table 15.5 of the County Development Plan 2025-2031 cover car parking standards for all development proposals. Nothing has been offered concerning additional parking spaces, circulation space, and set down/pick-up areas. Accordingly, in the interest of clarity and to allow for a fully informed decision, please submit further details and drawings that demonstrate compliance with Section 15.24 and Table 15.5. This information should include, inter alia: I. a revised site plan identifying the location and number of proposed additional car parking spaces to serve the development; and II. a brief statement demonstrating that the existing school traffic arrangements can accommodate the proposed development, having regard to peak school times, i.e. set - down and pick-up periods. 2. To fully assess the visual impact of the development within this heritage -sensitive campus, please clarify — with visual samples/specifications —the proposed external finishes and materials for the development, including the proposed bridge element. 3. The information submitted is insufficient regarding environmental protection. Please submit an appropriately completed water protection plan checklist. The planner dealing with this application is Ben Clerkin