HomeMy WebLinkAbout2660135 - Chief Executives AI OrderMONAGHAN CO. COUNCIL
PLANNING AND DEVELOPMENT ACT 2000 (as amended)
Chief Executive's Order No: P552-26ai
Reference Number: 26/60135
Name of Applicant: The Board of Management St Louis Secondary School
Address: Sebana Moynagh
KSNPM
M11 Business Campus
Innovation House, Gorey, Co. Wexford
Y25A8H2
Nature of Application: Permission for a development which will consist of the installation
of a new predominantly two -storey school building, with a third -
storey circulation core at 2nd floor level, and a new pedestrian
access bridge from the existing carpark level to the 2nd floor level
of the proposed new school building. The proposed development
(1010m2) includes 2 no. Mainstream Classrooms, 1 no. Science Lab
& Prep Area, 2 no. Art Rooms; and all associated site and ancillary
works The above proposed development consists of works within
the curtilage of protected structures including: Convent of Saint
Louis School Building (Reg No: 41310083); Convent of Saint Louis
School Building (Reg No: 41310084); Convent of Saint Louis
Church/Chapel (Reg No: 41310085); Saint Louis Convent National
School (Reg No: 41310064); Convent of Saint Louis Stables (Reg No:
41310065); Saint Louis Convent/Nunnery (Reg No. 41310066);
Convent of Saint Louis Gates/Railings/Boundary Walls (Reg No:
41310067); School House (Reg No: 41310072). There are also two
recorded monuments within the curtilage of the proposed site:
Fortified House and Bawn: Drummond Otra (Reg No. MO031-034)
Location of Development: St Louis Secondary School Carrickmacross Co Monaghan
ORDER:
I hereby order that pursuant to the provisions of the Planning and Development Act 2000 (as amended) and
Article 33 of the Planning and Development Regulations 2001 (as amended), the further information set out
on the attached schedule be requested from the applicant.
SENIOR PLANNER
Cam- C76 2�
DATE
26/60135 The Board of Management St Louis Secondary School St Louis Secondary School,
Carrickmacross, Co Monaghan
ADDITIONAL INFORMATION
1.
Section 15.24 and Table 15.5 of the County Development Plan 2025-2031 cover car parking
standards for all development proposals. Nothing has been offered concerning additional
parking spaces, circulation space, and set down/pick-up areas.
Accordingly, in the interest of clarity and to allow for a fully informed decision, please submit
further details and drawings that demonstrate compliance with Section 15.24 and Table 15.5.
This information should include, inter alia:
I. a revised site plan identifying the location and number of proposed additional car
parking spaces to serve the development; and
II. a brief statement demonstrating that the existing school traffic arrangements can
accommodate the proposed development, having regard to peak school times, i.e. set -
down and pick-up periods.
2.
To fully assess the visual impact of the development within this heritage -sensitive campus,
please clarify — with visual samples/specifications —the proposed external finishes and
materials for the development, including the proposed bridge element.
3.
The information submitted is insufficient regarding environmental protection.
Please submit an appropriately completed water protection plan checklist.
The planner dealing with this application is Ben Clerkin