Loading...
HomeMy WebLinkAbout2639 - Site Assessment ReportBER SERVICES Engineering Design Consultancy ftI[ A4essment for one®off W1C[ Tre-atment Systems Martin Burns, Corlea, CMX, Co. Monaghan. Client: Martin Burns Site: Corlea, CMX, CO. Monaghan Report By: Micheal Murtagh BEng, MIEI, CEng Date: 29/04/2026 M: +353 87 7570725 E: info@berservices.ie W: www.berservices.ie AN ENDIX A: SITE CHARACTERISATION FORM File Reference: __ Prefix: Mr First Name: Martin 1 Surname: Burns Address: Site Location and Townland: Corlea, CMX, Co. Monaghan Corlea, CMX, Co. Monaghan Number of Bedrooms: I3 Maximum Number of Residents: 0 Comments on population equivalent Population Equivalent of less than 10. The total design waster water load is established from the max. population based on the No. of bedrooms. For the purpose of the COP the minimum house size is 2 beds which equates to a design capacity of 4 PE. Every additional bedroom and additional 1 PE is added. Proposed Water Supply: Mains 11 Private Well/Borehole Soil Type, (Specify Type): Subsoil, (Specify Type): Sandstone and shale till (Lower Palaeozoic) I Group Well/Borehole F] Till derived from Lower Palaeozoic sandstones and shales Bedrock Type: Late Ordovician -Silurian deep marine greywacke, mudstone (Longford -Down) Aquifer Category: Regionally Important I Locally Important Poor Pl Vulnerability: Extreme High tl/� Moderate Low ❑ Groundwater Body: Monaghan Status Good Name of Public/Group Scheme Water Supply within 1 km: n/a Source Protection Area: ZOC ❑ SI SO ❑ Groundwater Protection Response: R2' Presence of Significant Sites (Archaeological, Natural & Historical): Past experience in the area: V/A Good drainage Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, and/or any potential site restrictions). This site may be suitable subject to further analysis. Integrating the above information the groundwater appears to be the main target at risk. Note: Only information available at the desk study stage should be used in this section. 3.1 Visual Assessment Landscape Position: Middle of the slope Slope: Steep (>1:5) Shallow (1:5-1:20) ❑✓ Relatively Flat (<1:20) LII Slope Comment slope at wwts location Surface Features within a minimum of 250m (Distance To Features Should Be Noted In Metres) Houses: House located West of Proposed percolation area- 90m Existing Land Use: Agricultural Vegetation Indicators: n/a Groundwater Flow Direction: Westerley Direction as indicated on site sketch Ground Condition: Dry & firm Underfoot Site Boundaries: Ditch/fence as indicated on Site Layout Map 3.1 Visual Assessment (contd.) Roads: Public Road West of the proposed WWTS Outcrops (Bedrock And/Or Subsoil): Dne within 100m of the proposed site Surface Water Ponding: None within 100m of the proposed site Lakes: None within 100m of the proposed site aches/Shellfish Areas: None within 100m of the proposed site Wetlands: None within 100m of the proposed site Karst Features: None within 100m of the proposed site Watercourses/Streams:' Stream located 50m West of Proposed Percolation Area *Note and record water level 3.1 Visual Assessment (contd.) Drainage Ditches:" None within 100m of the proposed site Springs:* None within 100m of the proposed Site \t/ells:" None located within 100m of the Proposed site Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, the suitability of the site to treat the wastewater and the location of the proposed system within the site). Integrating the above information groundwater would seem to be the main potential target at risk. Further analysis is to be carried out via trial hole inspection and percolation tests. 'Note and record water level 3.2 Trial Hole (should be a minimum of 2.1m deep (3m for regionally important aquifers)) To avoid any accidental damage, a trial hole assessment or percolation tests should not be undertaken in areas which are at or adjacent to significant sites, (e.g. NHAs, SACs, SPAs, and/or Archaeological etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. Depth of trial hole (m): 2.1 Depth from ground surface Depth from ground surface to bedrock (m) (if present): to water table (m) (if present): 1.7 Depth of water ingress: I1 Rock type (if present): Date and time of excavation: 22 -Mar -2026 09:00 Date and time of examination: 29 -Mar -2026 H 10:00 Depth of Surface and Subsurface Percolation Tests 0.1 m I 0.2m I 0.3m 0 0.4m II 0.5m II 0.6 m I 0.7m I 0.8m I 0.9m I 1.0m 1.1 m 0 1.2m I 1.3 m I 1.4m I 1.5m 0 1.6 m I 1.7m 0 1.8m I 1.9m I 2.0 m II 2.1 m II 2.2m I 2.3m I 2.4 m I 2.5m I 2.6 m I 2.7 m 0 2.8m I 2.9 m 0 3.0 m I 3.1 m I 3.2m 3.3 m I 3.4m II 3.5 m I Soil/Subsoil Texture & Plasticity and Soil Density/ Colour""* Preferential Classification** dilatancy*** Structure Compactness flowpaths Topsoil N/A n/a n/a CLAY with gravel boulders & cobbles n/a structureless Firm throughout B A SE OF TRIAL Dark Brown Through Roots Brown Through Roots PIT Likely Subsurface Percolation Value: 30 Likely Surface Percolation Value: I130 Note: Depth of percolation test holes should be Indicated on log above. ('Enter Surface or Subsurface at depths as appropriate). See Appendix E for BS 5930 classification. 3 samples to be tested for each horizon and results should be entered above for each horizon. All signs of mottling should be recorded. 3.2 Trial Hole (contd.) Evaluation: This site appears to be suitable but the the separation distances need to be checked. The wastewater can be treated before entering the groundwater and the effluent will get away without Ponding at the surface. From analysis of the trial pit and the soil Layers a T value of 20-50 would be expected. Further investigation to be carried out via the Percolation tests. 3.3(a) Subsurface Percolation Test for Subsoil Step 1: Test Hole Preparation Percolation Test Hole 3 Depth from ground surface 300 280 L 300 to top of hole (mm) (A) Depth from ground surface to base of hole (mm) (B) 750 750 750 Depth of hole (mm) [B - A]L 450 470 ____ 450 Dimensions of hole [length x breadth (mm)] ________________ 300 x 320 350 x 340 ________________ 370 x 380 Step 2: Pre -Soaking Test Holes Pre-soak start Date LII 28 -Apr -2026 28 -Apr -2026 28 -Apr -2026 Time 09:00 09:00 09:00 2nd pre-soak Date 28 -Apr -2 28 Apr 2026 LI 28 -Apr -2026 start Time 13:00 13:00 13:00 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T,00 Percolation Test Hole No. 1 2 I 3 Date of test II II 29-04-2026 29-04-2026 LI 29-04-2026 Time filled to 400 mm 09:00 09:00 09:00 Time water level at 300 mm 11:30 11:35 11:45 Time I;rnin.) to drop 100 mm (T goo ) 150.00. 155.00 165.00 Average T100 156.67 If T100 > 480 minutes then Subsurface Percolation value >120 - site unsuitable for discharge to ground If T100 < 210 minutes then go to Step 4; If T100> 210 minutes then go to Step 5; Step 4: Standard Method (where Tt00 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish At (min) Start Finish At (min) Start Finish At (min) Time Time Time Time Time Time (at 300 (at 200 (at 300 (at 200 (at 300 (at 200 mm) mm) mm) mm) mm) mm) 1 11:30 14:25 175.001 11:35 14:4111 186.00 11:45M14:48M 183.00 2 14:25 17:4711 202.00 14:41 18:0611 205.00 14:48 18:25M 217.00 3 17:47 21:41 234.00 18:06 21:5811 232.00 18:25 22:3011245.001 Average At 207.67 203.67 215.00 Value Average At/4 = [Hole No.1] 50.921(t1) Average At/4 = [Hole No.2] 51.921(t2) Average At/4 = [Hole No.3] 53.75 (t,) Result of Test: Subsurface Percolation Value = 52.191(min/25 mm) Comments: 'he "T" Tests carried out are within the acceptable range as per the EPA CODE OF PRACTICE Jo "P" tests required Step 5: Modified Method (where T100 > 210 minutes) Percolation Test Hole No. Fall of water in hole (mm) Time Factor = T, Start Time hh:mm Finish Time hh:mm Time of fall (mins) =T K,, = T, / T„ T— Value = 4.45 /K„ 300 - 250 8.1 =� 0.00 I I 250 - 200 9.7 0� 0.0011I 200 - 150 11.9 00 0.0011 � 150-100 14.1 =� 0.00 �� Average T- Value T- Value Hole 1 = (T1) 1 0.001 Percolation Test Hole No. 3 Percolation Test Hole No. 2 Fall of water in hole (mm) Time Factor = T, Start Time hh:mm Finish Time hh:mm Time of fall (mins) =T K„ = T, / T, T — Value = 4.45 /K„ 300-250 I 8.1 0.0011 250 - 200 I 9.7 0.00 == 200 - 150 11.9 00 0.00 == 150-100 I14.1 =� 0.0011 I= Average T- Value T- Value Hole 2 = (T2) I 0.00 Result of Test: Subsurface Percolation Value = 0 (min/25 mm) Fall of water Time Start Finish Time K„ T- Comments: in hole (mm) Factor Time Tim§e of fall = T, Value = T, hh:mm hh:mm (mins) / T = 4.45 = Tm /K,, 300 - 250 I 8.1 0.00 I 250-200 I9.7 00 0.00 =I _____I 200-150 I 11.9 =� 0.00 =I 150- 100 I 14.1 =� 0.00 =______I Average T- Value T- Value Hole 3 = (T2) I 0.00 3.3(b) Surface Percolation Test for Soil Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 I II II-' Depth from ground surface 0L 0 to top of hole (mm) Depth from ground surface 450 420 460 to base of hole (mm) Depth of hole (mm) 450 420 460 Dimensions of hole ii Ii (length x breadth (mm)] 300 x 280 II 290 x 280 275 x 290 Step 2: Pre -Soaking Test Holes Pre-soak start Date 28 -Mar -2026 28 -Mar -2026 Time 09:00 09:00 2nd pre-soak Date 28 -Mar -2026 28 -Mar -2026 start Time 14:00 j 14:00 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 28 -Mar -2026 09:00 28 -Mar -2026 14:00 1 2 3 Percolation Test Hole No. II II I Date of test 29 -Mar -26 29 -Mar -2611 29 -Mar -2026 Time filled to 400 mm Time water level at 300 mm IL Time to drop 100 mm (T1U�) 0.0011 0.00 IL0.001 Average T100 0.00 If T100 > 480 minutes then Surface Percolation value >90 - site unsuitable for discharge to ground If T100 ≤ 210 minutes then go to Step 4; If T100 > 210 minutes then go to Step 5; Step 4: Standard Method (where T100 < 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish AT (min) Start Finish AT (min) Start Finish AT (min) Time Time Time Time Time Time (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) 1 �l 0.001 II II 0.001 II II 0.00 2 II II 0.001 II II 0.001 IIII 0.00 3 III II 0.001 Ii II 0.001 II II 0.00 Average AT 0.00 0.00 0.00 Value Average AT/4 = [Hole No.1] 0.001(T) Average AT/4 = [Hole No.2] I 0.00](T) Average AT/4 = [Hole No.3] T 0.00 (T3; Result of Test: Surface Percolation Value = 0.001 (min/25 mm) Comments: 'he "P" Tests carried out are within the acceptable range as per the EPA CODE OF PRACTICE Step 5: Modified Method (where Ti., > 210 minutes) Percolation Test Hole No. Fall of water Time Start Finish Time K,, T - in hole (mm) Factor Time Time of fall = T, Value = T, hh:mm hh:mm (mins) / ,, = 4.45 = T,, 1K,, 300-250 8.1 �� 0.00 == 250 -200 9.7 _____1L 0.00 I� 200- 150 11.9 =0 0.0011 150- 100 I 14.1 11 iF 11 0.00 iF Average T- Value T- Value Hole 1 = (T1) I0.00 Percolation Test Hole No. 3 Percolation Test Hole No. 2 Fall of water Time Start Finish Time K,, T - in hole (mm) Factor Time Time of fall = T, Value = T, hh:mm hh:mm (mins) / Tn, = 4.45 =T /1<,, 300 - 250 I 8.1 =�=1 250 - 200 9.7 =0 0.00 == 200-150 I 11.9 0_____ 0.00 =I 150-100 14.1 0 0 0 = .00 = Average I T- Value T- Value Hole 2 = (T2) 0.00 Result of Test: Surface Percolation Value = o.00 (min/25 mm) Fall of water Time Start Finish Time K,, T - Comments: in hole (mm) Factor Time Time of fall = T, Value = T, hh:mm hh:mm (mins) / T = 4.45 =T /K„ 300 - 250 I 8.1 =0 0.00 =_ 250-200 9.7 =� 0.00 =� 200-150 I 11.9 =� 0.00 =I 150-100 I 14.1 =� 0.00 =I Average T- Value T- Value Hole 3 = (T2) I 0.00 Integrate the information from the desk study and on -site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Slope of proposed infiltration / treatment area: 1/200 Are all minimum separation distances met? Depth of unsaturated soil and/or subsoil beneath invert of gravel (or drip tubing in the case of drip dispersal system) 0.90 Percolation test result: Surface: Sub -surface: 52.19 Not Suitable for Development Suitable for Development u rl Identify all suitable options 1. Septic tank system (septic tank and percolation area) (Chapter 7) No 2. Secondary Treatment System (Chapters 8 and 9) and soil polishing filter Yes (Section 10.1) 3. Tertiary Treatment System and Infiltration / Yes treatment area (Section 10.2) Discharge Route' Discharge to Groundwater Propose to install: Secondary Treatment System and soil polishing filter and discharge to: Ground Water Invert level of the trench/bed gravel or drip tubing (m) 0,80 Site Specific Conditions (e.g. special works, site improvement works testing etc. TRICEL NOVA UNIT OR SIMILAR UNIT TO CONFORM TO EN 12566-3 AND COMPLY WITH SR66 INVERT OF GRAVEL IN PERCOLATION TRENCH TO BE AT 800mm BELOW EXISTING GROUND LEVEL PERCOLATION TRENCH LENGTH OF 95LM REQUIRED NO PIPE RUN TO BE LONGER THAN 10M REFER TO SITE LAYOUT FOR POSITION & DETAILS OF WWTS & PERCOLATION AREA ALL SEPARATION DISTANCES IN ACCORDANCE WITH EPA CODE OF PRACTICE ' A discharge of sewage effluent to "waters" (definition includes any or any part of any river, stream, lake, canal, reservoir, aquifer, pond, watercourse or other inland waters, whether natural or artificial) will require a licence under the Water Pollution Acts 1977-90. Refer to Section 2.4. SYSTEM TYPE: Septic Tank Systems (Chapter 7) Tank Capacity (m3) 0 Percolation Area No. of Trenches 0 Length of Trenches (m) 0 Invert Level (m) 0 Mounded Percolation Area No. of Trenches 0 Length of Trenches (m) 0 Invert Level (m) 0 SYSTEM TYPE: Secondary Treatment System (Chapters 8 and 9) and polishing filter (Section 10.1) Secondary Treatment Systems receiving septic tank effluent (Chapter 8) Media Type Area (m2)* Depth of Filter Invert Level Sand/Soil Soil Constructed Wetland Other Polishing Filter*: (Section 10.1) Surface Area (m2)* Option 1 - Direct Discharge Surface area (m2) Option 2 - Pumped Discharge Surface area (m2) Packaged Secondary Treatment Systems receiving raw wastewater (Chapter 9) Type TRICEL NOVA Capacity PE 6 Sizing of Primary Compartment Option 3 - Gravity Discharge Trench length (m) Option 4 - Low Pressure Pipe Distribution Trench length (m) Option 5 - Drip Dispersal Surface area (m2) 4.00 m3 95.00 SYSTEM TYPE: Tertiary Treatment System and infiltration / treatment area (Section 10.2) Identify purpose of tertiary Provide performance information Provide design information treatment demonstrating system will provide required treatment levels DISCHARGE ROUTE: Groundwater Hydraulic Loading Rate * (I/m2.d) L 25.00 Surface area (m2) Surface Water'* Discharge Rate (m3/hr) Hydraulic loading rate is determined by the percolation rate of subsoil ** Water Pollution Act discharge licence required QUALITY ASSURANCE: Installation & Commissioning Installation to be carried out according to EPA guidelines and planning authority requirements. Commissioning to be carried out by suitably qualified person i.e.. Engineer, Architect, etc; who possess sufficient indemnity insurance On -going Maintenance Maintenance contract to be entered into between WWTS Manufacturer and Client Company: BER SERVICES ENERGY CONSULTANTS LTD Prefix: Mr First Name: Micheal Surname: Murtagh Address 4nnavackey, Hackballscross, Dundalk, Co. Louth Qualifications/Experience: BEng, MIEI, CEng, FAS Site Suitability Assessment course certified Date of Report: 01 -May -2026 Phone: L 087 7570725 E-mail info@berservices.le Indemnity Insurance Number: AP10003737 Signature: NOTE: To secure your work prior to forwarding to third parties please select Print, select Printer "print to PDF" and name and save document. Martin Burns, Corlea, CMX, Co. Monaghan. SITE TRIAL HOLE M: +353 87 7570725 E: info@berservices.ie W: www.berservices.ie Martin Burns, Corlea, CMX, Co. Monaghan. TEST HOLE "Ti" TEST HOLE "T2" TEST HOLE "T3" M: +353 87 7570725 E: info(« berservices.ie W: www.berservices.ie