Loading...
HomeMy WebLinkAbout2644 - Site Assessment ReportEYffi FOR SIOBHAN HEGARTY, CARROWHATTA, SCOTSTOWN, CO MONAGHAN. D r t 'fMENT MONAG IAN Co. COUP'' I ca PLANN N CTON 02 JUN 2020 APPENDIX A: SITE CHARACTERISATION FORM File Reference: Siobhan Hegarty, Carrowhatta, Scotstown. Prefix: Ms First Name: Siobhan ISurname: Hegarty Address: Site Location and Townland: Carrowhatta, Scotstown, Co Monaghan. Carrowhatta, Scotstown., Co Monaghan. Number of Bedrooms: I1 Maximum Number of Residents: 14 Comments on population equivalent There is 1 double bedrooms which will equate to two adults. Proposed Water Supply: Mains Private Well/Borehole LII Soil Type, (Specify Type): Subsoil, (Specify Type): Bedrock Type: DSL Alluvium Alluv A Alluvium A / Limestone till TLs Group Well/Borehole Aquifer Category: Regionally Important I Locally Important LI Poor Vulnerability: Extreme High Moderate liiLow ❑✓ Groundwater Body: Tydavnet Status Good Name of Public/Group Scheme Water Supply within 1 I<m: Tydavnet GWS Source Protection Area: ZOC SI SO Jj Groundwater Protection Response: R1 0 Presence of Significant Sites (Archaeological, Natural & Historical): Past experience in the area: None Ring fort 241 m West South-West Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, and/or any potential site restrictions). The site is potentially suitable as there appears to be no restrictions to the on -site treatment of domestic effluent. Surface water and ground water could be targets at risk. This site characterisation report is for an existing wood cabin on the site. Note: Only information available at the desk study stage should be used in this section. 3.1 Visual Assessment Landscape Position: Elevated near base of Westerly facing slope. Slope: Steep (>1:5) Shallow (1:5-1:20) ✓� Relatively Flat (<1:20) LII Slope Comment ABOUT 1: 12 1 Surface Features within a minimum of 250m (Distance To Features Should Be Noted In Metres) Houses: Cabin on the site for which this report is for. Home dwelling house 95m South South-West. Dwelling house 45m East, 58m North-East and 95m South-West. Existing Land Use: Wasteland Vegetation Indicators: Grass and shrubs. Groundwater Flow Direction Ground Condition: Expected West Firm during a spell of unsettled weather with occasional rainfall. Site Boundaries: Mature hedges all around. 3.1 Visual Assessment (contd.) Roads: Local road 100m South. Outcrops (Bedrock And/Or Subsoil): None Surface Water Ponding: None Lakes: Duff lough 376m East. Beaches/Shellfish Areas: None Wetlands: None Karst Features: None Watercourses/Streams:* Scotstown river 363m West. *Note and record water level 3.1 Visual Assessment (contd.) Drainage Ditches:" No ditch within 50m. Springs:* None listed within 100m Wells:* None within 100m Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, the suitability of the site to treat the wastewater and the location of the proposed system within the site). The site was in good condition underfoot with the assessment being carried out during unsettled weather with occasional rainfall. This site characterisation report is for an existing cabin on the site. *Note and record water level 3.2 Trial Hole (should be a minimum of 2.1m deep (3m for regionally important aquifers)) To avoid any accidental damage, a trial hole assessment or percolation tests should not be undertaken in areas which are at or adjacent to significant sites, (e.g. NHAs, SACs, SPAs, and/or Archaeological etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. Depth of trial hole (m): I 2.1 Depth from ground surface Depth from ground surface to bedrock (m) (if present): to water table (m) (if present): 1.9 Depth of water ingress: I 0.21 Rock type (if present): Iwone _ I Date and time of excavation: 28 -Apr -2026 16:00 Date and time of examination: 30 -Apr -2026 09:00 Depth of Surface and Subsurface Soil/Subsoil Percolation Texture & Plasticity and Soil Density/ Colour**** Preferential Tests Classification ±* dilatancy*** Structure Compactness flowpaths 0.1 m II 0.2 m lI 0.3 m lI 0.4 m LIIII__] 0.5m C1J 0.6m L_I 0.7m 0.8m ISS 0.9m 0 1.0 m 1.1m lI 1.2m 0 1.3m I 1.4m I 1.5m1 1.6m ] 1.7m II 1.8m I 1.9m 0 2.Om lI 2.lmlO 2.2 m 0 2.3m I 2.4 m l- 2.5m 0 2.6m Fl 2.7m F 2.8m 2.9 m iI 3.0m lI 3.1m I 3.2m 0 3.3 m 0 3.4m1___ 3.5 m SILT / CLAY 3 threads —60mm CRUMB SOFT BROWN GRASS ROOTS TOP SOIL ribbons — dilatant ALLUVIUM 2 Threads - 50mm SUB SOIL ribbons - dilatant GRANULAR SOFT CREAM NONE SILY / CLAY SUBSOIL Base of trial hole 2.1 m 2 threads - 50mm ribbons - dilatant Likely Subsurface Percolation Value: __ 35 Likely Surface Percolation Value: I 25 BLOCKY UNCOMPACT GREY Note: "Depth of percolation test holes should be Indicated on log above. ('Enter Surface or Subsurface at depths as appropriate). See Appendix E for BS 5930 classification. 3 samples to he tested for each horizon and results should be entered above for each horizon. '.•. All signs of mottling should be recorded. NONE 3.2 Trial Hole (contd.) Evaluation: The trial hole was 2.1 m deep with three distinct layers. Top -soil that was crumb in nature and below that alluvium sub -soil that was cream in colour and granular in nature and below that sub -soil that was blocky in nature and grey in colour. The water table was at 1.9m. 3.3(a) Subsurface Percolation Test for Subsoil Step 1: Test Hole Preparation Percolation Test Hole 1 2 Depth from ground surface I 400 400 I 400 to top of hole (mm) (A) Depth from ground surface 800 800 800 to base of hole (mm) (B) Depth of hole (mm) [B - A] 400 400 400 Dimensions of hole [length x breadth (mm)] 300 x 300 300 x 300 280 x 280 Step 2: Pre -Soaking Test Holes Pre-soak start Date 28 -Apr -2026 28 -Apr -2026 I 28 -Apr -2026 Time I 17:301 17:301 I 17:30 2nd pre-soak Date 29 -Apr -2026 29 -Apr -20261 29 -Apr -2026 start Time 14:40 I 14:40 14:40 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring 1100 Percolation Test Hole No. 1 2 3 Date of test 30-04-2026 30-04-2026 30-04-2026 Time filled to 400 mm 09:0011 09:0011 09:00 Time water level at 300 mm I 09:50 09:55!! 09:50 Time (min.) to drop 100 mm (T1.) I 50.00 55.00 1 50.001 Average T100 51.67 If T100 > 480 minutes then Subsurface Percolation value >120 - site unsuitable for discharge to ground If T100 ≤ 210 minutes then go to Step 4; If 1100 > 210 minutes then go to Step 5; Step 4: Standard Method (where T,00 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish At (min) Start Finish At (min) Start Finish At (min) Time Time Time Time Time Time (at 300 (at 200 (at 300 (at 200 (at 300 (at 200 mm) mm) mm) mm) mm) mm) 1 I 09:50 10:5011 60.00 09:55 11:1011 75.00 09:50 10:4011 50.00 2 10:50 12:3011 100.00 11:10 13:1011 120.00 10:40 12:1511 95.00 3 12:30 15:25 175.00 13:10 16:4011 210.00 12:15 15:0011 165.00 Average At 111.67 135.00 103.33 Value Average At/4 = I Average At/4 = I Average At/4 = [Hole No.1] 27.921(t1) [Hole No.2] 33.751(t2) [Hole No.3] I 25.831(t3) Result of Test: Subsurface Percolation Value = 29.171 (min/25 mm) Comments: "he T test was a pass and this soil should be suitable for percolating effluent from an advanced treatment system. Step 5: Modified Method (where T,00 > 210 minutes) Percolation Test Hole No. Percolation Test Hole No. 2 Fall of water Time Start Finish Time K,, T - Fall of water Time Start Finish Time K,, T - in hole (mm) Factor Time Time of fall = T, Value in hole (mm) Factor Time Time of fall = T, Value = T, hh:mm hh:mm (mins) / T. = 4.45 = T, hh:mm hh:mm (mins) / T, = 4.45 = T 1K,, =T 1K,. 300 - 250 8.1 ==( 0.0011 300- 250 8.1 �� 0.00 i� 250- 200 9.7 OLD 0.00 �� 250-200 9.7 0 0.0011� 200 - 150 11.9 =� 0.0011 200 - 150 11.911 0.00 =C 150 - 100 14.1 0= 0.00 �� 150- 100 14.1 $� 0.00 ! C Average I T- Value T- Value Hole 1 =(T1) 0.00 Percolation Test Hole No. 3 Average I T- Value T- Value Hole 2 = (T2) 0.00 Result of Test: Subsurface Percolation Value = I_0.00!(min/25 mm) Fall of water Time Start Finish Time K,, T- Comments: in hole (mm) Factor Time Tim§e of fall = T, Value = T, hh:mm hh:mm (mins) /T = 4.45 /K„ 300 - 250 8.1 == 0.00 l 250 - 200 9.7 == 0.00 I I 200 - 150 11.9 = 0.00 150- 100 14.1 FI= �� 0.00 [_I I Average T- Value T- Value Hole 3 = (T2) 0.00 ■G 3.3(b) Surface Percolation Test for Soil Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface to top of hole (mm) Depth from ground surface 400 400 400 to base of hole (mm) Depth of hole (mm) 400 400 400 Dimensions of hole 17���3oo 300 x 280280 x 280[length x breadth (mm)] Step 2: Pre -Soaking Test Holes Pre-soak start Date Time 2nd pre-soak Date start Time 28 -Apr -2026 17:35 29 -Apr -2026 14:45 28 -Apr -2026 17:35 29 -Apr -2026 14:45 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 28 -Apr -2026 17:35 29 -Apr -2026 14:45 1 2 3 Percolation Test Hole No. II II Date of test 30 -Apr -26 I 30 -Apr -26 30 -Apr -2026 Time filled to 400 mm 09:05 IL 09:05 09:05 Time water level at 300 mm 09:55 IL 09:55 10:15 Time to drop 100 mm (T,00) 1 50.00 50.00 70.00 Average T100 56.67 If T100 > 480 minutes then Surface Percolation value >90 - site unsuitable for discharge to ground If T1 ≤ 210 minutes then go to Step 4; If T1D0 > 210 minutes then go to Step 5; Step 4: Standard Method (where T,00 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish AT (min) Start Finish AT (min) Start Finish AT (min) Time Time Time Time Time Time (at 300 (at 200 (at 300 (at 200 (at 300 (at 200 mm) mm) mm) mm) mm) mm) 1 09:55 10:50 55.00 09:55 11:0011 65.00 10:15!!11:30 75.00 2 10:50 11:5511 65.00 11:00 12:2011 80.00 11:30 12:5511 85.001 311:55jIi�fl 115.00 12:20 14:2011 120.00 12:55 15:2011 145.00 Average AT 101.67 78,33 88.33 Value Average AT/4 = Average AT/4 = Average AT/4 = _ [Hole No.11 L 19.581(T1) [Hole No.2] I 22.08 (T2) [Hole No.3] 25.421(T3) Result of Test: Surface Percolation Value = 22.36 (min/25 mm) Comments: The topsoil at this site is of good quality and may be used to level up the percolation area. The surface P tests were carried out on a large mound of good quality top -soil at the site which will be perfect for leveling up the percolation area which is on a slope. Step 5: Modified Method (where T100> 210 minutes) Percolation Percolation Test Hole No. 1 Test Hole No. 2 Fall of water Time Start Finish Time K,s T - Fall of water Time Start Finish Time Kos T — in hole (mm) Factor Time Time of fall = T, Value in hole (mm) Factor Time Time of fall = T Value = T, hh:mm hh:mm (mins) / T = 4.45 = T, hh:mm hh:mm (mins) / T = 4.45 =T =T /K,. 300 - 250 I 8.1 Du 0.00 0I 300 - 250 8.1 �� 0.00 0= 250 - 200 9.7 � 0.00 �� 250 - 200 9.7 =I� 0.00 == 200 - 150 11.9 � 0.00 =� 200 - 150 11.9 =� 0.00 == 150 - 100 14.1 00 0.00!!I 150 -100 14.1 =0 0.00 =______ Average T- Value T- Value Hole 1 = (T1) 0.00 Average T- Value T- Value Hole 2 = (12) 0.00 Result of Test: Surface Percolation Value = Percolation Test Hole No. 3 0.00 (min/25 mm) Fall of water Time Start Finish Time K,T- Comments: in hole (mm) Factor Time Time of fall = T, Value = T, hh:mm hh:mm (mins) / T, = 4.45 300 - 250 8.1 =� 0.00I=O 250 - 200 9.7 00 0.00 _ 11.9 =� 0.00 0 200-150 � 150- 100 14.1 [ � 0.00 fIF______ Average T- Value T- Value Hole 3 = (1Z) I 0.00 Integrate the information from the desk study and on -site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Slope of proposed infiltration / treatment area: 1:121 Are all minimum separation distances met? I I/ Depth of unsaturated soil and/or subsoil beneath invert of gravel (or drip tubing in the case of drip dispersal system) 0.90 Percolation test result: Surface: 22.36 Sub -surface: I 29.17 Not Suitable for Development LI Suitable for Development Q Identify all suitable options Septic tank system (septic tank and percolation area) (Chapter 7) No 2. Secondary Treatment System (Chapters 8 and 9) and soil polishing filter Yes (Section 10.1) 3. Tertiary Treatment System and Infiltration / treatment area (Section 10.2) Yes Discharge Route' Groundwater Propose to install: Secondary Treatment System and soil polishing filter and discharge to: Ground Water Invert level of the trench/bed gravel or drip tubing (m) 0.60 Site Specific Conditions (e.g. special works, site improvement works testing etc. Mechanical aeration system and a soil polishing filter to be installed and constructed to EPA 2021 specifications. I recommend 20m of percolation trench in the soil polishing filter consisting of 2 lengths of trench each measuring 1 Om. The invert of the percolation trenches should be at 0.6m with 0.9m pervious unsaturated soil below to ensure proper polishing of the final effluent. The percolation area shall measure 12m x 5m. Ensure that the final effluent from the mechanical aeration system is distributed evenly to each of the two percolation trenches. It is important to ensure that the percolation trenches and related pipe work are put in at the correct slope. A surface water drain measuring 1 m deep shall be employed (min 2m away) up -slope from the soil polishing filter to divert surface water away from the percolation area and to prevent the water table rising in wet weather. NOTE: It is very important to ensure that the aeration pump remains on at all times on the mechanical aeration system or otherwise the system will revert to septic conditions causing odors and poorer quality effluent which may lead to clogging of the percolation trenches. ' A discharge of sewage effluent to "waters" (definition includes any or any part of any river, stream, lake, canal, reservoir, aquifer, pond, watercourse or other inland waters, whether natural or artificial) will require a licence under the Water Pollution Acts 1977-90. Refer to Section 2.4. SYSTEM TYPE: Septic Tank Systems (Chapter 7) Tank Capacity (m�') Percolation Area Mounded Percolation Area No. of Trenches 0 No. of Trenches 0 Length of Trenches (m) L 6.001 Length of Trenches (i n) Invert Level (m) 0.601 Invert Level (m) _________ SYSTEM TYPE: Secondary Treatment System (Chapters 8 and 9) and polishing filter (Section 10.1) Secondary Treatment Systems receiving septic tank effluent Packaged Secondary (Chapter 8) Treatment Systems receiving raw wastewater (Chapter 9) Media Type Area (m2)* Depth of Filter Invert Level Type Sand/Soil BAF TREATMENT SYSTEM Soil Capacity PE 2 Constructed Wetland 1 I I Sizing of Primary Compartment Other _________ 2.301 m Polishing Filter*: (Section 10.1) Surface Area (m2)* 9.00 Option 3 - Gravity Discharge I 18.00 Trench length (m) Option 1 - Direct Discharge Surface area (m2) I Option 4 - Low Pressure � Pipe Distribution L� Option 2 - Pumped Discharge Trench length (rn) Surface area (m2) 0 Option 5 - Drip Dispersal Surface area (m2) SYSTEM TYPE: Tertiary Treatment System and infiltration / treatment area (Section 10.2) Identify purpose of tertiary Provide performance information Provide design information treatment demonstrating system will provide required treatment levels DISCHARGE ROUTE: Groundwater ❑✓ Hydraulic Loading Rate * (I/m2.d) L 33.00 Surface area (rn2) 9.00 Surface Water'* Discharge Rate (m3/hr) 0.01 * Hydraulic loading rate is determined by the percolation rate of subsoil * Water Pollution Act discharge licence required QUALITY ASSURANCE: Installation & Commissioning System to be signed off by a suitably qualified person and recommendations in section 5.0 to be adhered to. Package treatment system must conform to EN 12566-3 standard. Package treatment system to be properly installed and certified by company supplying the system in accordance with the EPA 2021 code of practice. Keep records of desludging for five years. On -going Maintenance Desludge tank as recommended by manufacturer and periodically inspect the system for damage or surface ponding. Maintenance contract to be agreed by company supplying the package treatment system and contract must be adhered ₹o so as to ensure that the system continues to function properly. Company: Biolabs 1 Prefix: Mr 0 First Name: Michael Surname: Holohan Address: Iterera, Scotstown, Co Monaghan. Qualifications/Experience: IGSI / EPA CERTIFIED Date of Report: 01 -May -2026 Phone: 0868169162, E-mail biolabsiri@outlook.com Indemnity Insurance Number: _ RPI-IE000946-001 Signature: 6 ,T& RIVERS AND LAKES AQUIFER CATEGORY LI VULNERABILITY LOW BEDROCK DSL <,tath 1 u it11, 111 All Chlllt hill I 111,11 Bdile all Scotaiyh An tthothac Is WELLS AND BOREHOLES ADJACENT TO THE SITE II Public Supply Source Protection Areas SI-Inner Protection Area SO -Outer Protection Area 1 .1 <II F is hill. Sra!I; l. llchu111r. t.I .utnIn ul An Lhulch,iitl �l rC lbias �• thtl' — — % Tha1r �I/ Balle an Scotalgh - `` An Nhuthach lr_ J:= ti SOURCE PROTECTION DATA (N/A) I r 7/cho r ' 11/ / c T LIM fly� f t y _ •�1 J1.}'k � � 1 , h Yk s, `: •'1- s � �i. .x F / / 4 i'• j&_, � R AERIAL VIEW OF PERCOLATION SITE TN i4Tt4kE I. -rAJAL •12Q � s 6- TQ5 tip z4&E o'P1 ®P3 IDS � V/ Rpm SKETCH OF PERCOLATION AREA INCLUDING SITE SURROUNDS n�iju 1 k'! '4 ', : " -' E< et 7 �r�c �' t 7 t,"► ra 1ii Ii yr y. L y s VIEW OF PERCOLATION SITE -._ ---tom i F»�i r ? , f tom'. {� -� `' .� Wit"' 'ii„lrL.Lrt�� �'� .�F.�i e.t-l� 5�'-Jw \• �k fl CABIN FOR WHICH SITE CHARACTERISATION REPORT IS FOR TRIAL HOLE ON DAY OF EXCAVATION TRIAL HOLE TWO DAYS AFTER EXCAVATION Ti T2 T3 T TEST HOLES :r �Ir+ �(kt ' 4. h '.,r� P1 P2 P3 P TEST HOLES OUTLINE SPECIFICATIONS FOR MOUNDED SOIL POLISHING FILTER 1. Treated effluent from the mechanical aeration sump unit shall be pumped intermittently to the distribution chamber feeding the 3 percolation trenches. 2. The slope of the percolation trenches from the distribution chamber shall be 1 in 200 3. The length of each of the 3 percolation trenched shall be 6m. Total length 18m. 4. The separation distance between the percolation trenches shall be 2m (ie 2.5m centre to centre) 5. Percolation pipes shall be 100mm diameter smooth wall uPVC sewer pipes, perforated at 4, 6 and 8 o'clock. Perforations shall be 8mm diameter, at 75mm centre's along the pipe. Holes shall be checked before installation to ensure they are free from debris. 6. The width of each percolation trench shall be 500mm. 7. The depth of each percolation trench shall be 600mm below the ground surface. 8. Percolation pipes shall be laid on a 250mm bed of washed gravel, having particles in the range of 8 - 32mm. 9. Pipe surround shall be washed gravel, having particle size in the range 8 - 32mm. 10. Pipe cover shall be 150mm depth of washed gravel, having particle size in the range of 8 - 32mm. 11. Geotextile layer to be placed on top of this followed by 100mm topsoil to top of mound. 12. Geotextile shall be in accordance with EN ISO 10319. Access / inspection points and vents shall be provided for the ends of the percolation pipes. Covers shall be visible and installed to prevent the ingress of water. They should be suitable for rodding and scouring purposes. 13. A surface land drain 1m deep shall be employed upslope from the soil polishing filter and not closer than 2m to divert surface water away from it and to prevent the water table rising in this area during wet weather. SCHEDULE OF SITE SEPARATION DISTANCES PACKAGE TREATMENT SYSTEM . Minimum distance to any dwelling = 7m . Minimum distance to site boundary = 3m . Minimum distance to trees = 3m . Minimum distance to roads = 4m . Minimum distance to slope breaks = 10m . Minimum distance to watercourse / streams = 10m . Minimum distance to soakaway =10m . Minimum distance to open drain = 10m . Minimum distance to lake or foreshore = 50m able 6.3 EPA Code of Practice 2021 POLISHING FILTER . Minimum distance to any dwelling = 10m . Minimum distance to site boundary = 3m . Minimum distance to trees = 3m . Minimum distance to roads = 4m . Minimum distance to slope breaks = 10m . Minimum distance to water course / stream = 10m . Minimum distance to soakaway = 10m . Minimum distance to open drain = 10m . Minimum distance to lake or foreshore = 50m . Minimum distance to up -gradient well = 15m . Minimum distance well on same level = 30m . Minimum distance to down -gradient well = 40m ble 6.1 EPA Code of Practice 2021 unless stated otherwise GROUND LEVEL TOPSOIL 100MM GEOTEXTILE LAYER 150MM WASHED STONE ABOVE PIPE 0.6M U) 100MM PIPE 250MM WASHED STONE BELOW PIPE INVERT OF TRENCH SUBSOIL MIN 0.9M WATER TABLE EACH TRENCH 500MM WIDE SECTION THROUGH SUBSOIL PERCOLATION SYSTEM